This Solicitation opportunity from Washington was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Castle Rock Stormwater Improvements, Department of Natural Resources, Cowlitz County, WA #26-E13
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Castle Rock Stormwater Improvements project for the Washington State DNR involves drainage and parking lot upgrades at a fire dispatch building. Primary work includes installing a new exterior crawl space entrance, replacing 280 linear feet of roof drain pipe, adding 90 square yards of concrete surfacing, and installing an interceptor trench, shallow drains, and three catch basins. The scope also covers grading within the crawl space and comprehensive site restoration of asphalt, concrete, grass, and rockery. All work must be performed during normal building operations without any closures. Additional additive tasks include a chip seal and fog seal treatment for 1,860 square yards of parking lot, including the reinstallation of wheel stops and paint markings, as well as the construction of a new HMA driveway connecting the parking lot to an accessible parking pad. This solicitation, numbered 26-E13, requires responses by September 24, 2026. A pre-bid meeting was scheduled for September 10 at 10:00 am on site.
General Info
Place of Performance
Olympia, WA, 98504-7031, USASet-Aside
Documents
209AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (7)
See All 7 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
The additive schedule includes a chip seal and fog seal treatment for approximately 1,860 SY of parking lot, to include site preparation, removing and reinstalling wheel stops, and applying paint markings in kind. The additive schedule also includes a new HMA driveway connecting the parking lot with an accessible parking pad near the dispatch building.
Note that this work shall take place during normal building operation and no building closures will be permitted.
Pre-Bid Meeting: 9/10 @ 10:00 am on site
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
