Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Castle Rock Stormwater Improvements, Department of Natural Resources, Cowlitz County, WA #26-E13

Closed
26-E13State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Castle Rock Stormwater Improvements project for the Washington State DNR involves drainage and parking lot upgrades at a fire dispatch building. Primary work includes installing a new exterior crawl space entrance, replacing 280 linear feet of roof drain pipe, adding 90 square yards of concrete surfacing, and installing an interceptor trench, shallow drains, and three catch basins. The scope also covers grading within the crawl space and comprehensive site restoration of asphalt, concrete, grass, and rockery. All work must be performed during normal building operations without any closures. Additional additive tasks include a chip seal and fog seal treatment for 1,860 square yards of parking lot, including the reinstallation of wheel stops and paint markings, as well as the construction of a new HMA driveway connecting the parking lot to an accessible parking pad. This solicitation, numbered 26-E13, requires responses by September 24, 2026. A pre-bid meeting was scheduled for September 10 at 10:00 am on site.

General Info

Castle Rock stormwater and parking upgrades for Washington DNR; responses due September 24, 2026.

Place of Performance

Olympia, WA, 98504-7031, USA

Set-Aside

NONE

Documents

209

Bid Results - Page 1.jpg

JPG

Plans - Page 10.jpg

JPG

Plans - Page 11.jpg

JPG

Plans - Page 1.jpg

JPG

Plans - Page 2.jpg

JPG

Plans - Page 3.jpg

JPG

Plans - Page 4.jpg

JPG

Plans - Page 5.jpg

JPG

Plans - Page 6.jpg

JPG

Plans - Page 7.jpg

JPG

Plans - Page 8.jpg

JPG

Plans - Page 9.jpg

JPG

Specs - Page 100.jpg

JPG

Specs - Page 101.jpg

JPG

Specs - Page 102.jpg

JPG

Specs - Page 103.jpg

JPG

Specs - Page 104.jpg

JPG

Specs - Page 105.jpg

JPG

Specs - Page 106.jpg

JPG

Specs - Page 107.jpg

JPG

Specs - Page 108.jpg

JPG

Specs - Page 109.jpg

JPG

Specs - Page 10.jpg

JPG

Specs - Page 110.jpg

JPG

Specs - Page 111.jpg

JPG

Specs - Page 112.jpg

JPG

Specs - Page 113.jpg

JPG

Specs - Page 114.jpg

JPG

Specs - Page 115.jpg

JPG

Specs - Page 116.jpg

JPG

Specs - Page 117.jpg

JPG

Specs - Page 118.jpg

JPG

Specs - Page 119.jpg

JPG

Specs - Page 11.jpg

JPG

Specs - Page 120.jpg

JPG

Specs - Page 121.jpg

JPG

Specs - Page 122.jpg

JPG

Specs - Page 123.jpg

JPG

Specs - Page 124.jpg

JPG

Specs - Page 125.jpg

JPG

Specs - Page 126.jpg

JPG

Specs - Page 127.jpg

JPG

Specs - Page 128.jpg

JPG

Specs - Page 129.jpg

JPG

Specs - Page 12.jpg

JPG

Specs - Page 130.jpg

JPG

Specs - Page 131.jpg

JPG

Specs - Page 132.jpg

JPG

Specs - Page 133.jpg

JPG

Specs - Page 134.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → WA State DNR Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
For technical questions DNR Project Manager listed in the Project Book

Interested Companies (7)

HD FowlerOLYMPIA, WA
GP ExcavationVictorville, CA
Haag & ShawCamas, WA

See All 7 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The project consists of drainage and parking lot improvements for a fire dispatch building. The project includes the installation of a new exterior crawl space entrance, replacement of approximately 280-LF of 4-inch roof drain pipe, approximately 90 square yards of concrete surfacing surrounding the building, an 85-LF interceptor trench, a 70- LF shallow drain within the building’s 2.5-foot height crawl space, grading within the crawl space, 3 new catch basins and associated piping, and site restoration including, but not limited to, restoration of concrete, asphalt, grass areas, and a small rockery.
The additive schedule includes a chip seal and fog seal treatment for approximately 1,860 SY of parking lot, to include site preparation, removing and reinstalling wheel stops, and applying paint markings in kind. The additive schedule also includes a new HMA driveway connecting the parking lot with an accessible parking pad near the dispatch building.
Note that this work shall take place during normal building operation and no building closures will be permitted.
Pre-Bid Meeting: 9/10 @ 10:00 am on site

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS