AI Contract Overview
The Missouri Valley Community School District is seeking bids to update a network closet, which involves removing 144 old network runs and installing new equipment and cabling. Required hardware includes an open frame wall mount rack, three 48 port blank patch panels, a 2200VA UPS, 144 CAT6a patch cables, 288 RJ45 keystone terminations, cabling for 144 new runs, and an OM4 MM 6 strand fiber run with fusion spliced LC ends and patch cables. Bidders must provide itemized costs for equipment, installation, and taxes, including specific make, model, and SKU information for all new equipment. This project is dependent on E-Rate funding, and vendors must be capable of providing E-Rate discounted billing via the SPI invoicing method. Proposals must certify compliance with FCC Lowest Corresponding Price requirements and security prohibitions regarding specific covered companies. Interested vendors are encouraged to request a walkthrough or blueprint review by March 13 to earn additional points. All bids must be submitted by 9:00 am Central time on March 19, 2026, and pricing must remain firm through September 30, 2027.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 11 days
- Transformer Oil Testing ServicesOpen now, due in 29 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
We are looking for the following: -Removal and disposal of 144 network runs Purchasing: -Open Frame Wall Mount Rack, Tripp Lite or equivalent preferred. - 3 - 48 Port Blank Patch Panels - 1 2200VA UPS -144 Snagless CAT6a Patch Cables -288 Terminations, RJ45 Keystones on both ends -Cabling for new runs (144) -OM4 MM 6 Strand Fiber Run, Fusion Spliced LC Ends and 2 Meter LC Patch Cables
1. Bids should itemize (a). cost of equipment (b). cost of installation, if applicable; and (c). cost of taxes/fees/shipping, if applicable. Bids should also include the specific make and model of equipment, as well as the SKU of each piece of equipment. Bids should specify the terms of the manufacturer's warranty and what the license term is (if applicable).
2. Any E-Rate ineligible costs should be clearly identified and itemized on the bid.
3. If submitting a bid for equipment that is or equivalent to the equipment listed on this form 470, the vendor shall submit evidence of equivalency. The applicant will make a final determination of equivalence and interoperability with existing equipment. 4. The make/model bid(s) should be for new equipment that is the most current model(s) available.
5. If the bid includes installation for new equipment, the bid should specify the installer's city and state.
6. Bidders must be willing to provide E-Rate discounted billing (form 474/SPI invoicing) and to include this statement in the proposal.
7. Robo-bids and bids sent as SPAM without regard to products and services listed on the Form 470 and/or the RFP will be disqualified and will not be evaluated.
8. The District reserves the right to cancel this request for bids and to reject all related proposals.
9. Prices need to be held firm through the duration of the 2026 E-Rate Category 2 installation period (from date of bid to September 30, 2027).
10. This project is dependent upon the E-Rate funding commitment decision letter.
11. We will require a vendor walk through to ensure accuracy of bids, we will also allow the vendor to view the blueprints of the project. We will be awarding points for the walk throughs or blueprint requests. Walk through/blueprint requests must be requested by 1:00 PM Friday, March 13. Contact Jamie Rejda via email to schedule. •••••@•••••.•••Sign up to see this detail
12. We require that the vendor use the SPI invoicing method.
State and local procurement requirements section:
By submitting a bid on the requested services herein, the vendor certifies its proposed prices are consistent with the FCCs Lowest Corresponding Price (LCP) requirements and that its equipment and services are compliant with the FCCs recent Order (FCC 19-121) prohibiting the sale, provision, maintenance, modification, or other support of equipment or services provided or manufactured by Huawei, ZTE, Hytera, Hangzhou, Dahua, Pacific Network Corp. and its wholly-owned subsidiary ComNet (USA) LLC and China Unicom (Americas) Operations Limited or any other covered company deemed a national security threat.
Deadline for vendor proposals is 9:00 am Central time, 29 days after the date this Form 470 is posted. We reserve the right to reject late-submitted proposals. Proposals must be e-mailed to the Form 470 contact unless otherwise noted.
Requested services (3 line items): - Category 2 — Internal Connections — Racks - Category 2 — Internal Connections — Cabling - Category 2 — Internal Connections — Uninterruptable Power Supply/Battery Backup And Necessary Software And Licenses
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260020358/132412/21188384-USAC_FCC_FORM_470_APPLICATION_260020358_CERTIFIED.pdf
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS