This Government Contract opportunity from Department Of Agriculture was posted on September 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CATHEY'S CREEK & TALLASEEHATCHEE CREEK TRIBUTARY AOP DESIGN-BUILD CONSTRUCTION

Awarded
AG-4146-S-09-0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 21 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

Contract AG-4146-S-09-0019 was awarded to RCI Contractors & Engineers, Inc. in the amount of $554,169.00 for the design-build construction of aquatic organism passage and drainage structure improvements at four sites within the Cathey's Creek and Tallaseehatchee Creek watersheds. Managed by the USDA Forest Service National Forests in Alabama, this project was designated as a 100 percent HUBZone small business set-aside. The work was performed in Heflin and Talladega, Alabama, with a performance period of 190 calendar days. The scope of work required a single-phase design-build approach focused on restoring aquatic ecosystems while maintaining forest access. The contractor was responsible for comprehensive site assessments, the development of preliminary and final engineering designs following stream simulation guidelines, and the actual construction of the approved designs. Key requirements included adherence to the NFsAL Aquatic Organism Passage Design Guide and the delivery of final as-built drawings. Selection criteria emphasized technical capability, past performance, and the requirement for professional engineering registration in the state of Alabama.

General Info

Contract Value

$568,149.45

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Talladega National Forest Shoal Creek and Talladega Ranger Districts, Heflin and Talladega, AL, USA

Set-Aside

NONE

Award Issued Date

Documents

6
RTF, High priority: read this first1 page · amendment
High
DOC, High priority: read this first1 page · sow
High
PDF, High priority: read this firstsow
High
DOC, High priority: read this first34 pages · rfp
High
PDF, High priority: read this firstspecifications
High
DOC, Low priority3 pages · industry-day
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Aug 17, 2009. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → National Forests In Alabama
Contacts2 people available
OfficeMONTGOMERY, AL, 36107, USA
Office AddressMONTGOMERY, AL, 36107, USA
Contacts
Cornelia B. RobinsonProcurement Technician
Gabriel A CottrellContracting Officer

Full Description

Show more
This project is a Two-Phase design/build 100% HubZone set-aside Request for Proposal. It is located on the Talladega National Forest, Shoal Creek and Talladega Ranger Districts, Cleburne and Clay Counties, Alabama. The Contractor shall furnish all labor, equipment, transportation, permits, testing and incidentals necessary to the performance of the work specified in this culvert replacement and stream restoration project. Any additional work required to complete the following tasks and not specified below is considered incidental and no additional payment will be made. The work shall consist of the following: 1. Conduct a comprehensive site assessment to include but not limited to the following: a. Bank characteristics: soil stability, and existing native materials b. Subsurface characteristics: minor geotechnical investigation, geomorphic investigation c. Scour potential and other risks: sediment transport and deposition, channel gradient, channel morphology changes, debris flow, etc d. Structure feasibility: study stability, suitability, cost, and any other site constrictions. Note: Structure width shall minimally meet the bank full width and be the most economical alternative after all engineering criteria are met. Consider: Do we need a wider structure to accommodate channel adjustments, floodplain connectivity, bank conditions, grade control, etc.? e. ALL alternatives shall simulate natural channel at a chosen reference reach including bankfull cross section shape and dimensions, stream bed material (gradation and type), and channel slope. f. Structures: Consider pre-cast structures, custom designed structures, and other possible alternatives to fit the site. Examples: Bridge (Pre-cast or custom design), open bottom arch, open bottom box culvert, embedded pipe (embedment depth?), culvert coatings to extend life, etc. g. Preliminary design at 45% review, 90% plans-in-hand review shall be submitted for Forest Service acceptance before final contract drawings are developed. Preliminary design shall include the following: i. Hydrologic and hydraulic calculations and method used. Use watershed size (see attachment 3) and an appropriate return interval. ii. Structure size and type iii. Maximum velocity iv. Slope v. Roughness vi. Inverts elevations: Structure outlet and inlet. vii. Structure material. viii. Expected lifespan of culverts shall be a minimum of 30 years 50 years for bridges. ix. Culvert must be minimally designed for 25 year return interval with minimum of 12 of freeboard. Bridges design requirements are available upon request. x. Additional features recommendations such as headwall, wing-wall, bank and slope armoring, etc. xi. Survey site plan with longitudinal stream profile h. Submit preliminary engineering drawings, specifications, estimated costs for a minimum of two alternatives per site to main contact person (See technical contact information). i. Final alternative will be chosen under direct consultation between contractor and the USFS. 2. Survey site plan of stream and structure design. a. Longitudinal profile of stream: A copy of an Aquatic Organism Passage (AOP) Guidelines will be provided to contractor as a general guideline and minimum standards for Stream Simulation Design Method for culverts and other drainage structures. b. Determine structure channel position: Channel shape, most suitable grade, elevation, bearing, length, bank full width (BFW), bed material, grade controls, pool depths, and other characteristics to best match the existing stream, beyond the area of impact. c. Identify reference reach and compare characteristics to structure. d. Justification for the choice of a reference reach will be provided based on stream simulation and connectivity. e. Select project alignment and profile including stream restoration details. f. Quantify and characterize bed, bank, and grade control materials. g. Structure shall meet minimum size criteria per AOP. Structure shall avoid negative impacts on vertical and horizontal sight distance and road alignment at stream crossing. 3. Produce drawing, standard drawing, details, and specifications for the following: a. Site plan. b. Structure profile. c. Structure and stream cross section. d. Structure and foundation details. e. Bedding construction details. f. Roadway details. g. Erosion control and dewatering plan. h. Stockpiles site and needed materials, etc. i. Specifications include FP-03, Forest Service supplemental and ALDOT specifications for local materials. 3 4. Determine quantities and estimate costs. 5. Develop final contract documents for signature. Provide hard and electronic copy. Electronic drawings should be in AutoCAD 2004 or newer. Produce drawing plans with the following minimum standards: a. Develop a plan view drawing (to scale) utilizing CAD and preferably AutoCAD software or compatible. b. Drawing size: Tabloid (11'x17) c. Drawing standards will be discussed with the firm under contract. 6. Construction of approved designs. 7. Provide construction As-Built upon completion. The estimated price range is between $250,000 and $500,000. This solicitation will be awarded using an Evaluation criteria with price not considered the priority. The solicitation will be available by download from the internet in FBO. Amendments will also be available only throught FBO website.

More opportunities from Department Of Agriculture → National Forests In Alabama

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS