Cathodic Protection Rehabilitation on Aufdenkamp Pipeline (ATM-3)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the replacement of an existing cathodic protection rectifier and its enclosure to ensure continued integrity and protection of the water transmission mains along the Aufdenkamp Pipeline, specifically under the ATM-3 designation. The new rectifier and enclosure will be installed to maintain proper electrical protection against corrosion, which is essential for the long-term safety and functionality of the water infrastructure. In addition to the rectifier upgrade, a new retaining wall will be constructed on the slope located behind the sidewalk to provide structural support and prevent soil erosion that could compromise the pipeline or surrounding infrastructure. The work is scheduled to take place in Mission Viejo, California, with a ZIP code of 92675, and is being managed by the Santa Margarita Water District. The contract was posted in July 2026 and is currently in forecast status, with Patricia A. Butler, the Special Projects Manager, serving as the primary point of contact for all inquiries.
General Info
Agency
NAICS
Place of Performance
Alicia Pkwy and Po, Mission Viejo, CA, 92675Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
