This Solicitation opportunity from Florida was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Escambia County is soliciting bids for the construction of the Alger Road bridge replacement and the Jefferson Avenue pipe culvert rehabilitation in the town of Century, Florida. This project is funded through the Community Development Block Grant Disaster Recovery (CDBG-DR) program as part of the long-term recovery efforts following Hurricane Sally. The total project funding is capped at 2,862,137.00 dollars. The scope of work requires a qualified contractor to provide all labor, materials, and equipment necessary to execute the 100 percent design plans, which include specific technical requirements for helical piles and adherence to FDOT and AASHTO standards. The project will be administered by a consultant in cooperation with the county to ensure completion on budget and on time.
The contract is subject to stringent federal and state regulations, including HUD Section 3 compliance to provide economic opportunities for low-income residents and the Davis-Bacon Act for prevailing wage payments. Contractors must provide performance and payment bonds for 100 percent of the contract price and utilize the OpenGov e-procurement portal for all submissions. The period of performance allows for 365 consecutive calendar days from substantial completion to final completion. Environmental compliance is managed through various permits and exemptions from the Florida Department of Environmental Protection and the U.S. Army Corps of Engineers. Award decisions will be made on an all-or-none total basis, considering bidder and subcontractor qualifications.
General Info
Escambia County seeks bids for bridge and culvert work totaling $2,862,137.00.
HighAI Summary for Alger Jefferson Drainage Improvements Civil Bid Set 2026-08-07: This document is the 100% design submittal for the CDBG-DR Century Drainage & Road Improvements project dated July 2026. It includes detailed civil engineering plans and bid items for Alger Road and Jefferson Avenue bridge and culvert replacements, along with utility conflict matrices. The bid set provides comprehensive construction details, quantities, and specifications prepared according to Escambia County technical standards, intended for contractor bidding and construction execution.
PDF
PDF, High priority: read this firststructure-plans
HighAI Summary for Alger Road Over Unnamed Branch Bridge Replacement Structure Plans 100% Submittal August 2026: This document contains the 100% submittal structure plans for the Alger Road over Unnamed Branch Bridge Replacement project (Bridge No. 484322) in Escambia County, Florida, dated August 2026. Prepared by Mott MacDonald, the plans include detailed bridge design specifications, general notes, structural analysis, materials, and construction standards following FDOT and AASHTO guidelines. Key contents cover bridge layout, hydraulic recommendations, foundation and abutment details, prestressed beam sections, guardrail details, and load ratings. The document serves as a comprehensive technical reference for construction and engineering of the bridge replacement.
PDF
PDF, High priority: read this first10 pages · application-form
HighAI Summary for Escambia County Section 3 Business Application CDBG-DR: This document is the Escambia County Section 3 Business Application for CDBG-DR programs. It includes instructions for submission, a checklist of required organizational and qualifying documentation, insurance requirements, and criteria to qualify as a Section 3 Business Concern. The application collects detailed business and ownership information, evidence of financial and operational capability, and fields of interest and experience. It also contains certification statements for accuracy and authorization for information release. The document is intended to certify businesses for participation in Section 3 contracting opportunities under HUD guidelines.
PDF
PDF, High priority: read this first1 page · contract-clause
HighAI Summary for Escambia County Section 3 Contract Clause CDBG-DR: This document contains the Section 3 contract clause required for all Section 3 covered contracts and subcontracts under the Housing and Urban Development Act of 1968, as amended. It outlines the contractor's obligations to comply with HUD regulations in 24 CFR part 75 to direct employment and economic opportunities to low and very low-income persons, particularly HUD housing assistance recipients. The clause includes requirements for notifying labor organizations, including the clause in subcontracts, certification of employment practices, and consequences of noncompliance such as sanctions and contract termination. It also addresses additional provisions for Indian housing assistance under section 7(b) of the Indian Self-Determination and Education Assistance Act. This clause ensures compliance with federal regulations to promote economic opportunities for disadvantaged populations in HUD-assisted projects.
PDF
PDF, High priority: read this first7 pages · contract-provisions
HighAI Summary for Exhibit Federal Contract Provisions HUD with Signature 5.6.26: This document contains the required contract provisions for contracts funded by federal awards under 2 C.F.R. Part 200, Appendix II, specifically for HUD-related contracts. It outlines administrative, contractual, and legal remedies for contract breaches, equal employment opportunity clauses in compliance with Executive Order 11246, Davis-Bacon Act wage requirements, and other labor standards. The provisions include nondiscrimination requirements, reporting obligations, and compliance with labor laws. The document is dated 5.6.26 and includes signature acknowledgment.
TXT
TXT, High priority: read this firstwage-determination
HighAI Summary for FL20260112 Florida Heavy Construction Wage Determination: Wage determination FL20260112 dated 05/18/2026 for heavy construction in Escambia County, Florida. It lists prevailing wage rates and fringe benefits for various construction labor classifications including power equipment operators, ironworkers, laborers, painters, truck drivers, and others. The document includes modifications, union rate identifiers, and references to Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. It serves as a critical labor standards reference for contracts subject to the Davis-Bacon Act in the specified region.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for HS019 CDBG-DR Rebuild Florida Infrastructure Repair Program Subrecipient Agreement: This Subrecipient Agreement, effective as of August 1, 2024, is between the State of Florida Department of Commerce and Escambia County under the Community Development Block Grant Disaster Recovery (CDBG-DR) Rebuild Florida Infrastructure Repair Program. It outlines the scope of work, compliance with federal and state laws, recordkeeping requirements, and terms of the agreement including the period ending June 30, 2027. The agreement ensures that at least 70% of funds benefit low- and moderate-income persons and incorporates federal regulations such as 24 CFR 570 and 2 CFR 200. Modifications require written consent, and records must be retained for six years post-closeout. The document includes detailed provisions on audits, financial reporting, and compliance with HUD and federal disaster recovery requirements.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Invitation to Bid PD 25-26.084 - CDBG-DR HS019 Alger Rd Bridge Replacement and Jefferson Ave Pipe Culvert Rehab: This Invitation to Bid (ITB) PD 25-26.084, released August 14, 2026, by Escambia County, solicits qualified contractors for the construction of the Alger Rd Bridge Replacement and Jefferson Ave Pipe Culvert Rehabilitation projects under the CDBG-DR HS019 program. The document outlines the scope of work, solicitation terms and conditions, and includes detailed attachments such as federal contract provisions, permits, plans, wage determinations, and specifications. Key dates include a non-mandatory pre-bid meeting on August 21, 2026, a question submission deadline of August 28, 2026, and a bid opening on September 14, 2026. The ITB emphasizes compliance with HUD funding requirements related to Hurricane Sally recovery efforts and requires contractors to provide all labor, materials, equipment, and coordination necessary to complete the projects timely and safely.
PDF
PDF, High priority: read this firststructure-plans
HighAI Summary for Jefferson Ave over Unnamed Branch Structure Plans 100% Submittal Aug 2026: This document contains the 100% submittal structure plans for the rehabilitation of Jefferson Avenue over Unnamed Branch pipe culverts in Escambia County, Florida, dated August 2026. Prepared by Mott MacDonald, the plans detail the scope of work including soil cleaning, riprap placement, flowable fill, vegetation removal, and traffic maintenance. It references design specifications such as the FDOT Structures Manual (Jan 2026) and AASHTO LRFD Bridge Design Specifications (9th Edition). The document includes general notes on site conditions, governing standards, construction specifications, erosion control, and contractor responsibilities to ensure compliance with county and state regulations.
PDF
PDF, High priority: read this firstitb
HighAI Summary for PD 25-26.084: CDBG-DR HS019 Alger Rd Bridge & Jefferson Ave Culvert Rehab: Invitation to Bid (ITB) issued by Escambia County on August 14, 2026, for the construction of the Alger Rd Bridge Replacement and Jefferson Ave Pipe Culvert Rehabilitation projects. The procurement is funded via CDBG-DR funds following Hurricane Sally. The solicitation includes a scope of work for all labor, materials, and equipment, with a response deadline of September 14, 2026, at 10:00 am.
PDF
PDF, High priority: read this firstitb
HighAI Summary for PD 25-26.084 ITB: Alger Rd Bridge Replacement & Jefferson Ave Culvert Rehab: Invitation to Bid PD 25-26.084 for Escambia County’s CDBG-DR HS019 Construction project covering Alger Rd bridge replacement and Jefferson Ave pipe culvert rehabilitation in Century, Florida. Released August 14, 2026, with questions due August 28, 2026 and bid opening/deadline September 14, 2026 at 10:00 a.m. The solicitation includes scope of work, solicitation terms and conditions, CDBG-DR specific provisions, general and construction terms, insurance requirements, pricing table, vendor submission instructions, and multiple attachments such as federal contract provisions, Section 3 clauses/forms, permits, plans, subrecipient agreements, Davis-Bacon wage determinations, and a helical-pile specification.
PDF
PDF, High priority: read this first10 pages · sow
HighAI Summary for Section 3 Project Implementation Plan Template and Forms: This document is a Section 3 Project Implementation Plan template required for HUD-funded projects. It outlines the Section 3 goals to promote local economic development by requiring job training, employment, and contracting opportunities for low- or very low-income residents. The plan includes mandatory forms (Forms 1-5) for projects over $200,000 to ensure compliance with HUD regulations (24 CFR Part 75). Form 1 covers Section 3 assessment and certifications, while Form 2 collects subcontractor information. The document emphasizes the need for contractors to make best efforts to meet minimum numeric goals for Section 3 participation and to submit all applicable forms with bids or funding applications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specification 31 60 00 Helical Piles: This document is Specification Section 31 60 00 for Helical Piles, detailing engineering, design, installation, and testing requirements for helical piles in construction projects. It includes design criteria, related sections, references to standards (ACI, ASTM, AWS), submittal requirements including contractor qualifications and construction submittals, quality assurance measures, storage and handling instructions, product specifications for steel shafts, lead and extension sections, bolt hardware, and execution procedures for pile installation and equipment. The specification ensures compliance with industry standards and outlines installation tolerances and documentation needed for project approval.
PDF
PDF, Medium prioritycontract-document
MediumAI Summary for HS019 Subrecipient Agreement for CDBG-DR Infrastructure Repair: This Subrecipient Agreement (Commerce Agreement Number HS019) between the State of Florida Department of Commerce and Escambia County governs the use of federally funded Community Development Block Grant - Disaster Recovery (CDBG-DR) funds for infrastructure repair under the Rebuild Florida program. Effective as of the last execution date and ending June 30, 2027, the agreement outlines the scope of work, compliance with federal and state laws, recordkeeping requirements, and funding conditions to ensure at least 70% of funds benefit low- and moderate-income persons. The document includes references to applicable federal regulations and specifies terms for modifications, audits, and record retention.
PDF
PDF, Low prioritypermit-exemption-verification
LowAI Summary for FDEP Exemption Verification Letter for Alger Road Bridge Replacement 0469957-001-002-EE: This April 22, 2026 letter from the Florida Department of Environmental Protection Northwest District verifies that the proposed replacement of the Alger Road Bridge and transfer of a water utility line in Escambia County qualifies for regulatory exemption under Florida Administrative Code 62-330.051. The document details the exemption conditions, including environmental protections and compliance requirements. It clarifies that no proprietary or federal permits are included, and additional authorizations may be required. The letter advises contacting the department before project changes and provides contact information for further inquiries.
PDF
PDF, Low prioritypermit-exemption-verification
LowAI Summary for FDEP Exemption Verification Letter for Escambia County Bridge Repair 0469961-001-EE: This April 20, 2026 letter from the Florida Department of Environmental Protection verifies that Escambia County's proposed repair of a vehicular bridge by installing grout and riprap in Mill Creek qualifies for a regulatory exemption under Chapter 62-330.051(9)(a), Florida Administrative Code. The letter confirms no proprietary authorization is required and that federal approval is not included, advising separate permits may be needed from the U.S. Army Corps of Engineers. It outlines conditions for the exemption's validity, rights to petition for administrative hearing, and notes that state water quality certification is waived for this exempt activity.
PDF
PDF, Low prioritypermit-approval
LowAI Summary for Florida DEP General Permit Approval - Alger Road Gas Line Bore 0469957-003-EG/17: This document is a General Permit approval letter issued by the Florida Department of Environmental Protection Northwest District on May 12, 2026, to Escambia County for installation of a 2-inch gas line under Alger Road Bridge in Century, Florida. It confirms regulatory approval under Rule 62-330.453 F.A.C., notes that proprietary authorization is not required, and states that federal authorization was not included, potentially requiring separate permits from the U.S. Army Corps of Engineers. The letter outlines conditions, rights to petition for administrative hearing, and compliance requirements. The permit is valid for five years from the notice date and includes water quality certification under the Clean Water Act.
PDF
PDF, Low prioritypermit-verification
LowAI Summary for SAJ-2025-03434 NWP 14 Verification Letter for Alger Road Bridge Replacement: This document is a verification letter dated May 29, 2026, from the U.S. Army Corps of Engineers Jacksonville District regarding permit application SAJ-2025-03434. It authorizes Escambia County to replace the Alger Road bridge under Nationwide Permit 14 (Linear Transportation Projects), valid until March 15, 2031. The letter outlines general and project-specific conditions including environmental protections, reporting requirements, and compliance with cultural resource and wildlife protection measures. The permit covers impacts to wetlands and specifies erosion control and fill material standards.
PDF
PDF, Low prioritypermit-verification
LowAI Summary for SAJ-2026-00056 NWP-3 Verification Letter for Culvert Repair: This document is a verification letter dated May 29, 2026, from the U.S. Army Corps of Engineers Jacksonville District regarding permit application SAJ-2026-00056. It authorizes repair work on an existing culvert crossing at Jefferson Ave under Nationwide Permit 3 (Maintenance), valid until March 15, 2031. The letter outlines general and project-specific conditions including wetland impact limits, cultural resource protections, erosion control, fill material requirements, and reporting instructions. The permit covers approximately 0.005 acres of permanent and 0.027 acres of temporary wetland impacts in Escambia County, Florida.
The Scope of Work for these projects is to provide construction engineering, inspection, and project management services on the Alger Rd bridge replacement and the Jefferson Ave Culvert Rehabilitation projects. This document gives the Consultant the same responsibility and authority as Escambia County when administering these County construction project contracts. The administration of the Alger Rd bridge replacement and the Jefferson Ave Culvert Rehabilitation projects will be conducted by the Consultant in full cooperation with Escambia County. Escambia County will have the final word in regard to challenges of Consultant's authority by the contractor or decisions made by the Consultant regarding the work. The ultimate goal of Escambia County and the Consultant should be to administer each contract in a highly professional manner, conducive to a cooperative relationship between the Consultant, Contractors, and Escambia County, and to complete the work on budget and on time with minimum inconvenience and maximum safety for the public. On September 16, 2020, Hurricane Sally (DR-4564) swept over the Florida panhandle as a Category 2 hurricane, bringing heavy rainfall and flooding. The impacts of Hurricane Sally further demonstrated the need for an effective, comprehensive long-term recovery plan that would address and meet the remaining needs of Floridians following this catastrophic event. In the wake of this natural disaster, Florida came together to recover and rebuild, but significant unmet needs remain. Recognizing this, under FR Vol. 77 No. 23 published February 3, 2022, Congress appropriated and the U.S. Department of Housing and Urban Development (HUD) allocated a total of $113 million in funding to support long-term recovery efforts following Hurricane Sally through the Florida Department of Commerce (Commerce) Community Development Block Grant Disaster Recovery (CDBG-DR) Program.