Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CDBG-DR SMA Healthcare Ridgewood Flood Mitigation Construction

Closed
26-B-120KWState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Required scopes of work cover a wide range of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 9 hours ago

DEADLINE

in about 2 months
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 9 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. This Design-Bid-Build project, issued as a Firm Fixed Price task order against a MATOC IDIQ, has an estimated value between 1 million and 5 million dollars, with a statutory limit of 5 million dollars. The scope of work includes site preparation, stormwater mitigation via an infiltration pond, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, a dry pipe fire suppression system, and specialized desiccant dehumidifying equipment. All work must adhere to strict standards, including UFC 3-600-01, NFPA 13, and the 2021 International Building Code. The project must commence within 10 calendar days of the Notice to Proceed and be completed within 365 calendar days. Award will be based on a balanced evaluation of technical capability and price, with a focus on the proposed project schedule and key personnel qualifications. Bidders must provide a bid guarantee of 20 percent of the bid price or 3 million dollars, whichever is less, and are required to furnish payment bonds for awards over 35,000 dollars and performance bonds for awards exceeding 150,000 dollars. Invoicing must be processed through Wide Area Workflow (WAWF), and labor must comply with the Davis-Bacon Act prevailing wage rates for Pierce County, Washington. Proposals are due by 12:00pm PST on October 18, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
CONNER COMPLEX NEW LABORATORY FACILITY
Solicitation # SOQ DOA 25 26 63
The Florida Department of Agriculture and Consumer Services is seeking proposals from licensed general contractors to provide Construction Management (CM) at risk services for Project 1175, the Conner Complex New Laboratory Facility located at 3125 Conner Boulevard, Tallahassee, Florida. The project involves the construction of a modernized 156,000 square foot facility designed to house five scientific divisions, including Food Safety, Aquaculture, and Animal Industry, featuring BSL-2 and BSL-3 capable laboratories, offices, and utility services. The selected firm will utilize the Negotiated Fee-Guaranteed Maximum Price Construction Contracting Method and will be responsible for full project management, including staffing, bonding, permitting, and the administration of competitively bid trade contracts. Qualified respondents must submit a comprehensive proposal package by November 9, 2026, consisting of one original hardbound copy and one digital USB. Required documentation includes a letter of interest, a detailed experience questionnaire, financial information, at least three reference letters, and evidence of Florida licensure. Evaluation is based on a preliminary ranking followed by interviews to determine the most highly qualified firm. Key contractual requirements include a five percent retainage on construction payments, mandatory Florida Department of Law Enforcement Level 1 background checks for workers, and the provision of 100 percent performance and payment bonds for projects exceeding 100,000 dollars. All state obligations are contingent upon annual appropriations by the Florida Legislature.
Department of Agriculture and Consumer Services

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The County of Volusia's Office of Recovery and Resiliency is soliciting bids under solicitation 26-B-120KW for construction services to implement passive flood mitigation improvements at the SMA Outpatient - Daytona facility located at 702 South Ridgewood Avenue, Daytona Beach. Funded by HUD's Community Development Block Grant for Disaster Recovery (CDBG-DR), the project aims to protect the building to a flood elevation of 8.0 feet above sea level. The scope of work includes adding three feet of waterproofing and flood-resistant construction above the existing first-floor elevation, replacing openings with flood-rated assemblies, and elevating mechanical and electrical equipment. All work must comply with the Florida Building Code, local Volusia County requirements, and National Flood Insurance Program standards. The estimated construction cost is 371,530.00 dollars, and the contract will be awarded to the single, lowest responsive and responsible respondent. The project has a total performance period of 180 days from the Notice to Proceed, with substantial completion required within 162 days. Due to federal funding, the contract is subject to stringent compliance requirements, including the Davis-Bacon Act and Copeland Anti-Kickback Act for prevailing wages, HUD Section 3 employment and economic opportunity goals, and Minority and Women Business Enterprise (MWBE) reporting. Mandatory bonding requirements under 24 CFR Part 85.36 include a bid guarantee of 5 percent and performance and payment bonds for 100 percent of the contract price. Contractors must also maintain comprehensive insurance coverage, including general liability, professional liability, and workers compensation. Bids must be submitted electronically via the OpenGov portal by the specified deadline.

General Info

Volusia County seeks bids for flood mitigation at SMA Outpatient facility for $371,530.

Documents

23

Contract C2093 for CDBG-DR SMA Healthcare Ridgewood Flood Mitigation Construction

PDF, High priority: read this first48 pages · contract-document
High

Contract C-2093 Prime/Subcontractor Form for ITB 26-B-120KW

XLS, High priority: read this first1 page · prime-subcontractor-form
High

County of Volusia Section 3 Information and Business Concern Certification

PDF, High priority: read this first5 pages · section-3-information
High

Exhibit A - Required Types and Limits of Insurance for 26-B-120kW

PDF, High priority: read this first2 pages · insurance-requirements
High

Exhibit D - Bid Price Sheet 26-B-120KW for Ridgewood Flood Mitigation

XLSX, High priority: read this first2 pages · price-sheet
High

Exhibit H - Supplemental Conditions for CDBG-DR Federally Assisted Projects

PDF, High priority: read this first18 pages · supplemental-conditions
High

Exhibit I - Instructions for Completing Payroll Form WH-347 Updated January 2025

PDF, High priority: read this first4 pages · instructions-for-certified-payroll
High

Exhibit L - Section 3 Information & Forms - Volusia County

PDF, High priority: read this first5 pages · section-3-information-and-forms
High

Exhibit M - Bonding Requirements 24 CFR PART 85.36

PDF, High priority: read this first1 page · bonding-requirements
High

FL20250137 Heavy Construction Wage Determination for Volusia County, FL

PDF, High priority: read this firstwage-determination
High

IFB #26-B-120KW: CDBG-DR SMA Healthcare Ridgewood Flood Mitigation Construction

PDF, High priority: read this first104 pages · ifb
High

IFB 26-B-120KW CDBG-DR SMA Healthcare Ridgewood Flood Mitigation Construction

PDF, High priority: read this first104 pages · ifb
High

Instructions for Completing Payroll Form WH-347 - January 2025

PDF, High priority: read this first4 pages · wage-determination
High

ITB 702 S. Ridgewood Avenue Flood Mitigation Improvements

DOCX, High priority: read this first7 pages · itb
High

ITB No. 25-B-##XX Prime/Subcontractor Form

XLS, High priority: read this first1 page · prime-subcontractor-form
High

Supplemental Conditions for Federally Assisted Projects Under CDBG-DR

PDF, High priority: read this first18 pages · supplemental-conditions
High

WH347 Certified Payroll Form January 2025

PDF, High priority: read this first2 pages · wage-determination
High

24 CFR Part 85.36 Bonding Requirements Exhibit L

PDF, Low priority1 page · bonding-requirements
Low

County of Volusia MWBE Reporting Form Exhibit J

PDF, Low priority2 pages · mwbe-reporting-form
Low

Exhibit G - Project Sign for Holly Hill Chemical Tank Replacement

PDF, Low priority1 page · other
Low

Exhibit J - WH347 Certified Payroll Form January 2025

PDF, Low priority2 pages · certified-payroll
Low

Volusia County MWBE Reporting Form for Contractors and Subcontractors

PDF, Low priority2 pages · mwbe-reporting-form
Low

Volusia County Transform386 SMA Healthcare Ridgewood Flood Mitigation

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Oct 22, 2026 to Sep 24, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Recovery and Resiliency
Contacts2 people available
OfficeDeLand, FL, 32720, USA
Office AddressDeLand, FL, 32720, USA
Contacts
Ligia Elena BenoitInfrastructure Activity Project Manager
Kathy WilliamsProcurement Manager

Interested Companies (29)

Southeastern Surveying and MappingOrlando, FL
Solas StructuralTallahassee, FL
Oelrich ConstructionJonesville, FL

See All 29 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
On September 28, 2022, SMA Outpatient - Daytona, the outpatient services facility located at 702 South Ridgewood Avenue, Daytona Beach, sustained significant flood damage as a result of Hurricane Ian. The structure is a brick-on-concrete-masonry-unit (CMU) building with a first-floor elevation of 5.14 feet above sea level (NAVD 88), as established by the recorded Elevation Certificate. The objective of this project is to implement passive flood mitigation improvements that will protect the building to a flood elevation of 8.0 feet above sea level without requiring human intervention prior to a storm event. The design strategy achieves this protection level by adding three (3) feet of waterproofing and flood-resistant construction above the existing first-floor elevation, replacing existing openings with flood-rated assemblies, and elevating mechanical and electrical equipment above the 8.0-foot flood protection datum. The improvements are consistent with the Transform 386 Ridgewood Flood Mitigation Application and have been developed through site assessment and pre-construction coordination. All work shall be performed in accordance with applicable provisions of the Florida Building Code (FBC), local Volusia County building requirements, and the floodplain management standards of the National Flood Insurance Program (NFIP).

More opportunities from Florida → Recovery and Resiliency

Same awarding agency

NAICS: 238160
SLED
CDBG-DR Palmetto House Roof - Construction
Solicitation # 26-B-118KW
The County of Volusia Office of Recovery and Resiliency is soliciting bids for the CDBG-DR Palmetto House Roof Construction project (Solicitation 26-B-118KW) located in Daytona Beach, Florida. Funded by HUD CDBG-DR grants following Hurricane Ian, the project involves the complete removal and replacement of three distinct roof systems totaling approximately 6,629 square feet. The scope includes the installation of laminated composition shingles on the top and middle roofs and a modified bitumen membrane on the low-slope bottom roof. Key deliverables include the replacement of roof sheathing, installation of enhanced roof-to-wall and deck-attachment connections, a secondary water barrier, and all necessary flashing and ventilation, with an estimated construction cost of $120,481.23. The contract will be awarded to the single lowest responsive and responsible bidder by October 29, 2026. Awardees must comply with stringent federal and state requirements, including the Davis-Bacon Act for prevailing wages, HUD Section 3 labor thresholds, and MWBE reporting. Mandatory bonding includes a 5% bid guarantee, and 100% performance and payment bonds. Contractors are subject to liquidated damages of $980.00 per day and must maintain comprehensive insurance coverage, including $2 million in aggregate general liability. All work must adhere to the current Florida Building Code and manufacturer specifications, with final acceptance determined by County staff and the project manager.
Roofing Contractors

POSTED

8 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS