Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

CDLP25-02026 - 8851 Manning Road Land Use Permit

Forecast
CDLP25-02026State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Manning Road and Springtime Common, CA, 94551

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Isabel ChavezSite Acquisition Specialist

Full Description

Show more
Land Use Permit to allow the continued operation of an existing T-Mobile wireless telecommunications facility that was established under Land Use Permit CDLP83-02003. No modifications of the wireless facility are proposed.

More opportunities from California → Contra Costa County

Same awarding agency

NAICS: 237310
SLED
Vasco Road Safety Improvement
Solicitation # CP#09-55
The Vasco Road Safety Improvement Project Phase II, identified as solicitation CP#09-55, is a public works initiative managed by the Contra Costa County Department of Conservation and Development and the California Transportation Commission. The project focuses on enhancing safety along a 2.5-mile stretch of rural Vasco Road between Camino Diablo Road and the southern entrance to Los Vaqueros Reservoir. This area has a documented history of high traffic volumes and high-speed incidents. Key construction elements include the installation of a concrete median barrier, road shoulders meeting current design standards, the connection of two southbound truck passing lanes, and two bridge widenings. Additional infrastructure includes drainage systems, retaining walls, signing, striping, turn pockets, guardrail adjustments, and wildlife crossing features. The project incorporates several design updates to meet current standards, including redesigned wildlife undercrossings, modifications to the bridge design over Brushy Creek, the addition of stormwater treatment facilities, and adjustments to grading and wildlife exclusion fencing. The project also involves relocating an East Bay Regional Parks District access easement. Environmental compliance has been managed under the California Environmental Quality Act, with a Mitigated Negative Declaration and associated addenda confirming that the modifications do not result in significant environmental impacts. The project was approved in mid-2026, with a Notice of Determination filed on August 26, 2026, confirming the adoption of mitigation measures and a monitoring plan.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
San Pablo Dam Road - La Honda Storm Drain and Slide Repair Project
Solicitation # CP#23-18
The San Pablo Dam Road-La Honda Road Storm Drain and Slide Repair Project (CP#23-18) is a public works initiative by Contra Costa County to stabilize an embankment failure and repair infrastructure in unincorporated El Sobrante, California. The scope of work includes the installation of a 150-foot stitch pile wall with concrete piles reaching 50 feet in depth, the reconstruction of a slope using geogrid reinforcement, and the repair of approximately 200 feet of San Pablo Dam Road, including restriping and the installation of a 170-foot guardrail. Additionally, the project involves relocating an 18-inch culvert outfall, installing 75 feet of reinforced concrete pipe with two manholes, and repairing the existing culvert under the road using cured-in-place pipe lining. Construction is scheduled to begin in mid or late 2026 and is expected to last approximately 100 working days. The project requires the removal of about 67 trees and the establishment of three temporary staging areas. Compliance with the California Environmental Quality Act (CEQA) and Assembly Bill 52 is mandatory, with specific requirements for protecting tribal cultural resources and following strict inadvertent discovery protocols for human remains. Hazardous materials, including cements and diesel fuels, must be handled according to the Hazardous Materials Transportation Act and the California Health and Safety Code. The project is managed by the Contra Costa County Department of Conservation and Development.
Highway, Street, and Bridge Construction

POSTED

6 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS