San Pablo Dam Road - La Honda Storm Drain and Slide Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Pablo Dam Road–La Honda Road Storm Drain and Slide Repair Project is a geotechnical and infrastructure stabilization initiative in unincorporated El Sobrante, Contra Costa County, California, aimed at addressing an active embankment failure near the intersection with La Honda Road. The project involves installing a 150-foot stitch pile wall composed of 50-foot-deep cast-in-drilled-hole concrete piles spaced six feet apart, positioned 50 feet north of San Pablo Dam Road to anchor the failing slope. Excavation will reach up to 24 feet deep between the wall and the roadway, with the cut slope rebuilt using native material reinforced with geogrid layers at two-foot vertical intervals to ensure long-term stability. The existing 18-inch culvert at the failure site will be relocated 75 feet west of the new wall, accompanied by two new manholes and reinforced concrete pipe with a flared concrete end section discharging onto a rock slope protection pad to prevent erosion. The original culvert beneath the roadway will be repaired using cured-in-place-pipe lining, while the damaged segment adjacent to San Pablo Creek will be removed. Approximately 200 feet of roadway will be reconstructed, including restriping and the installation of a 170-foot guardrail. The project will require the removal of 67 trees, with full restoration planned through hydroseeding with native species and replanting of an equal number of trees post-construction. Construction is scheduled to begin in late 2026 or early 2027 and will last approximately 100 working days, with three temporary staging areas established on the northbound lane of La Honda Drive, the north shoulder of San Pablo Dam Road, and a smaller site directly south of the roadway. Standard traffic control measures will be maintained, ensuring continuous access for emergency vehicles. Environmental compliance is tightly regulated under CalOSHA excavation standards, Bay Area Air District emission thresholds, and California Green Building Standards requiring a minimum 65% construction waste diversion rate and a 75% recycling target. Work must adhere to strict dewatering protocols limited to the dry season, with mandatory geotechnical oversight by Crawford & Associates and environmental monitoring for protected species and cultural resources via an Inadvertent Discovery Clause requiring immediate work stoppage upon discovery. All personnel must complete a Worker Environmental Awareness Program, and post-construction restoration must achieve at least 80% native vegetation cover with invasive species suppressed to no more than 1

General Info

Stabilize slope with pile wall, relocate culvert, repair road, remove trees, construct guardrail, begin 2026.

Agency

California → Contra Costa County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Approximately 200 feet southeast of La Honda Road and San Pablo Dam Road intersection, CA, 94803

Set-Aside

NONE

Documents

(5)

CP#23-18 San Pablo Dam Road La Honda ISMND

PDFismnd

SCH Summary for San Pablo Dam Road Storm Drain and Slide Repair Project

PDFsch-summary

San Pablo Dam Road-La Honda Storm Drain and Slide Repair Project Notice of Completion

PDFnotice-of-completion

CP#23-18 NOD SPDR Storm Drain and Slide Repair 06-30-26

PDFnotice-of-determination

CP#23-18 Notice of Intent to Adopt Mitigated Negative Declaration for La Honda Storm Drain Repair

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Christina KelleherEnvironmental Analyst II
Syd SotoodehSenior Planner

Full Description

Show more
The San Pablo Dam Road–La Honda Road Storm Drain and Slide Repair Project (proposed project) involves the stabilization of an embankment failure, the repair of the northern side of San Pablo Dam Road, and replacement of an existing culvert approximately 200 feet southeast of La Honda Road in unincorporated El Sobrante, Contra Costa County, California. The proposed project would install a stitch pile wall 50 feet north of San Pablo Dam Road between the roadway and San Pablo Creek with an approximate length of 150 feet. The wall consists of cast-in-drilled-hole concrete piles about 50 feet in depth that are spaced six feet apart. The slope between the proposed stitch pile wall and San Pablo Dam Road would be excavated to a maximum depth of 24 feet. The slope would be rebuilt with the excavated material reinforced with layers of geogrid placed at 2-foot vertical spacing to provide long-term stabilization. The 18-inch existing culvert outfall within the embankment failure area would be relocated west of the proposed stitch pile wall with the installment of two manholes and 75 feet of reinforced concrete pipe intended to convey stormwater to the outfall location. The existing 18-inch culvert under San Pablo Dam Road would be repaired using cured-in-place-pipe lining through the installation of a flexible liner inside the culvert to restore previous hydraulic conditions while the damaged segment towards San Pablo Creek would be removed. The 18-inch relocated culvert outfall would be reinforced concrete pipe enhanced with a concrete flared end section discharging to a rock slope protection pad to disperse flow and to prevent bank erosion around the inlet. Approximately 200 feet of San Pablo Dam Road would be repaired along the embankment failure including restriping and placement of a 170-foot guardrail. Construction of the proposed project is expected to begin in late 2026 or early 2027 and would last approximately 100 working days. Construction activities would involve excavations 50 feet in depth for the installment of the cast-in-drilled-hole concrete piles associated with the stitch pile wall and excavations 24 feet in depth between the stitch pile wall and San Pablo Dam Road, minimal grading in front of the stitch pile wall, the removal of approximately 67 trees, and roadway repairs including restriping and placement of approximately 170 feet of guardrail. Construction activities would require the establishment of three temporary staging areas with the first on the northbound lane on La Honda Drive, a second on the north shoulder of San Pablo Dam Road, and a third smaller staging area south of San Pablo Dam Road directly across the embankment failure. Standard traffic control measures would be employed during construction activities, and emergency vehicles will have access at all times. All disturbed areas will be stabilized with best management practices following construction and restored to pre-project conditions through hydroseeding with a native seed mix and replanting approximately 67 trees.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details