San Pablo Dam Road - La Honda Storm Drain and Slide Repair Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The San Pablo Dam Road–La Honda Road Storm Drain and Slide Repair Project is a geotechnical and infrastructure stabilization initiative in unincorporated El Sobrante, Contra Costa County, California, aimed at addressing an active embankment failure near the intersection with La Honda Road. The project involves installing a 150-foot stitch pile wall composed of 50-foot-deep cast-in-drilled-hole concrete piles spaced six feet apart, positioned 50 feet north of San Pablo Dam Road to anchor the failing slope. Excavation will reach up to 24 feet deep between the wall and the roadway, with the cut slope rebuilt using native material reinforced with geogrid layers at two-foot vertical intervals to ensure long-term stability. The existing 18-inch culvert at the failure site will be relocated 75 feet west of the new wall, accompanied by two new manholes and reinforced concrete pipe with a flared concrete end section discharging onto a rock slope protection pad to prevent erosion. The original culvert beneath the roadway will be repaired using cured-in-place-pipe lining, while the damaged segment adjacent to San Pablo Creek will be removed. Approximately 200 feet of roadway will be reconstructed, including restriping and the installation of a 170-foot guardrail. The project will require the removal of 67 trees, with full restoration planned through hydroseeding with native species and replanting of an equal number of trees post-construction. Construction is scheduled to begin in late 2026 or early 2027 and will last approximately 100 working days, with three temporary staging areas established on the northbound lane of La Honda Drive, the north shoulder of San Pablo Dam Road, and a smaller site directly south of the roadway. Standard traffic control measures will be maintained, ensuring continuous access for emergency vehicles. Environmental compliance is tightly regulated under CalOSHA excavation standards, Bay Area Air District emission thresholds, and California Green Building Standards requiring a minimum 65% construction waste diversion rate and a 75% recycling target. Work must adhere to strict dewatering protocols limited to the dry season, with mandatory geotechnical oversight by Crawford & Associates and environmental monitoring for protected species and cultural resources via an Inadvertent Discovery Clause requiring immediate work stoppage upon discovery. All personnel must complete a Worker Environmental Awareness Program, and post-construction restoration must achieve at least 80% native vegetation cover with invasive species suppressed to no more than 1
General Info
Agency
NAICS
Place of Performance
Approximately 200 feet southeast of La Honda Road and San Pablo Dam Road intersection, CA, 94803Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
