San Pablo Dam Road - La Honda Storm Drain and Slide Repair Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Pablo Dam Road-La Honda Road Storm Drain and Slide Repair Project (CP#23-18) is a public works initiative by Contra Costa County to stabilize an embankment failure and repair infrastructure in unincorporated El Sobrante, California. The scope of work includes the installation of a 150-foot stitch pile wall with concrete piles reaching 50 feet in depth, the reconstruction of a slope using geogrid reinforcement, and the repair of approximately 200 feet of San Pablo Dam Road, including restriping and the installation of a 170-foot guardrail. Additionally, the project involves relocating an 18-inch culvert outfall, installing 75 feet of reinforced concrete pipe with two manholes, and repairing the existing culvert under the road using cured-in-place pipe lining. Construction is scheduled to begin in mid or late 2026 and is expected to last approximately 100 working days. The project requires the removal of about 67 trees and the establishment of three temporary staging areas. Compliance with the California Environmental Quality Act (CEQA) and Assembly Bill 52 is mandatory, with specific requirements for protecting tribal cultural resources and following strict inadvertent discovery protocols for human remains. Hazardous materials, including cements and diesel fuels, must be handled according to the Hazardous Materials Transportation Act and the California Health and Safety Code. The project is managed by the Contra Costa County Department of Conservation and Development.

General Info

Contra Costa County road and storm drain repairs in El Sobrante starting mid-2026.

Agency

California → Contra Costa County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Approximately 200 feet southeast of La Honda Road and San Pablo Dam Road intersection, CA, 94803

Set-Aside

NONE

Documents

(5)

CP#23-18 San Pablo Dam Road La Honda ISMND

PDFismnd

SCH Summary for San Pablo Dam Road Storm Drain and Slide Repair Project

PDFsch-summary

San Pablo Dam Road-La Honda Storm Drain and Slide Repair Project Notice of Completion

PDFnotice-of-completion

CP#23-18 NOD SPDR Storm Drain and Slide Repair 06-30-26

PDFnotice-of-determination

CP#23-18 Notice of Intent to Adopt Mitigated Negative Declaration for La Honda Storm Drain Repair

PDFnotice-of-intent

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Christina KelleherEnvironmental Analyst
Syd SotoodehSenior Planner

Full Description

Show more
The San Pablo Dam Road–La Honda Road Storm Drain and Slide Repair Project proposed project) involves the stabilization of an embankment failure, the repair of the northern side of San Pablo Dam Road, and replacement of an existing culvert approximately 200 feet southeast of La Honda Road in unincorporated El Sobrante, Contra Costa County, California. The proposed project would install a stitch pile wall 50 feet north of San Pablo Dam Road between the roadway and San Pablo Creek with an approximate length of 150 feet. The wall consists of cast-in-drilled-hole concrete piles about 50 feet in depth that are spaced six feet apart. The slope between the proposed stitch pile wall and San Pablo Dam Road would be excavated to a maximum depth of 24 feet. The slope would be rebuilt with the excavated material reinforced with layers of geogrid placed at 2-foot vertical spacing to provide long-term stabilization. The 18-inch existing culvert outfall within the embankment failure area would be relocated west of the proposed stitch pile wall with the installment of two manholes and 75 feet of reinforced concrete pipe intended to convey stormwater to the outfall location. The existing 18-inch culvert under San Pablo Dam Road would be repaired using cured-in-place-pipe lining through the installation of a flexible liner inside the culvert to restore previous hydraulic conditions while the damaged segment towards San Pablo Creek would be removed. The 18-inch relocated culvert outfall would be reinforced concrete pipe enhanced with a concrete flared end section outfalling to a rock slope protection pad to disperse flow and to prevent bank erosion around the inlet. Approximately 200 feet of San Pablo Dam Road would be repaired along the embankment failure including restriping and placement of a 170-foot guardrail. Demolition and Construction Activities Construction of the proposed project is expected to begin in mid or late 2026 and would last approximately 100 working days. Construction activities would involve excavations 50 feet in depth for the installment of the cast-in-drilled-hole concrete piles associated with the stitch pile wall and excavations 24 feet in depth between the stitch pile wall and San Pablo Dam Road, minimal grading in front of the stitch pile wall, the removal of approximately 67 trees, and roadway repairs including restriping and placement of approximately 170 feet of guardrail. Construction activities would require the establishment of three temporary staging areas with the first on the northbound lane on La Honda Drive, a second on the north shoulder of San Pablo Dam Road, and a third smaller staging area south of San Pablo Dam Road directly across the embankment failure (Exhibit 1 of CEQA document).

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS