Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Cecchetti Road MP 0.218 Storm Repair Project (300711/ED26-0073)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Luis Obispo County is advancing a project to replace the existing Cecchetti Road crossing over Arroyo Grande Creek with a permanent, single-span concrete open-bottom bridge to restore reliable vehicular access. The scope includes removing the deteriorated portions of the current roadway, installing the new bridge structure, and raising the adjacent roadway profiles to mitigate recurring overtopping during storm events. Associated work involves reconstructing the roadway approaches, implementing drainage enhancements, and installing erosion control measures to improve resilience against hydraulic and geotechnical risks. The project is designed to elevate roadway safety, decrease long-term maintenance demands, facilitate fish passage, and strengthen the environmental sustainability of the crossing. The initiative is formally identified as the Cecchetti Road MP 0.218 Storm Repair Project and is listed under reference ED26-0073, with anticipated posting in June 2026. Primary point of contact for inquiries is Kate Shea, Division Manager, reachable via email or phone provided by the county.

General Info

Replace Cecchetti Road bridge to improve access, safety, fish passage, and storm resilience.

Agency

California → San Luis Obispo County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Cecchetti Road MP 0.218 Storm Repair Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
Kate SheaDivision Manager

Full Description

Show more
The proposed project involves the construction of a permanent replacement bridge to restore vehicular access to the Cecchetti Road crossing over Arroyo Grande Creek. The project includes restoring the crossing with a new open-bottom. single-span concrete bridge and reconstructing the adjacent roadway approaches. The project includes removal of the remaining portion of concrete roadway, installation of the new bridge structure, and raising the roadway profile to reduce the frequency of overtopping during future storm events. Associated improvements would include drainage and erosion control measures to enhance the crossing's resilience to hydraulic and geotechnical hazards. These upgrades are intended to improve roadway safety, reduce maintenance needs. support fish passage. and enhance the environmental performance of the crossing.

Similar Contracts

Same NAICS industry code