Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Cecchetti Road MP 0.218 Storm Repair Project (300711/ED26-0073)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cecchetti Road MP 0.218 Storm Repair Project (300711/ED26-0073) is a forecast procurement issued by San Luis Obispo County, California, under NAICS code 237310. The project focuses on restoring vehicular access to the Cecchetti Road crossing over Arroyo Grande Creek through the construction of a permanent replacement bridge. This effort involves installing a new open-bottom, single-span concrete bridge, removing existing concrete roadway portions, and reconstructing adjacent roadway approaches. To mitigate future storm impacts, the project includes raising the roadway profile to reduce the frequency of overtopping. Beyond the structural repairs, the project incorporates drainage and erosion control measures designed to enhance resilience against geotechnical and hydraulic hazards. These improvements are intended to increase roadway safety, lower maintenance requirements, support fish passage, and improve the overall environmental performance of the crossing. The project is located within the County Right of Way at Cecchetti Road Mile-Post 0.218 and has been classified as categorically exempt under CEQA guidelines Section 15302(c) for replacement or reconstruction with negligible expansion of capacity.

General Info

Replace Cecchetti Road bridge to improve access, safety, fish passage, and storm resilience.

Agency

California → San Luis Obispo County

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
Kate SheaDivision Manager

Full Description

Show more
The proposed project involves the construction of a permanent replacement bridge to restore vehicular access to the Cecchetti Road crossing over Arroyo Grande Creek. The project includes restoring the crossing with a new open-bottom. single-span concrete bridge and reconstructing the adjacent roadway approaches. The project includes removal of the remaining portion of concrete roadway, installation of the new bridge structure, and raising the roadway profile to reduce the frequency of overtopping during future storm events. Associated improvements would include drainage and erosion control measures to enhance the crossing's resilience to hydraulic and geotechnical hazards. These upgrades are intended to improve roadway safety, reduce maintenance needs. support fish passage. and enhance the environmental performance of the crossing.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS