Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on June 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Center Community Decentralized Wastewater Treatment and Disposal System

Closed
73907State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Center Community Decentralized Wastewater Treatment and Disposal System contract involves the complete replacement of outdated wastewater infrastructure, including the decommissioning of existing septic tanks and the installation of new ones, along with the construction of a new Water Resource Recovery Facility to modernize wastewater treatment capabilities. The scope also encompasses the development of new effluent pump stations, a network of small diameter HDPE gravity effluent sewer lines, and effluent force mains to ensure efficient and reliable transport of treated water. Additional miscellaneous work is included to support the overall system integration and operational readiness. The project is being managed by the Vermont Department of Economic Development, with all work to be performed within the state of Vermont. Solicitation number 73907 was posted on June 30, 2026, with a response deadline of July 29, 2026, at 6:00 a.m. The solicitation is directed at contractors eligible to respond under a State, Local, or Educational (SLED) agency procurement process, though no specific set-aside type is indicated. Contract inquiries and submissions should be directed to J Booth at aeengineers.com or by phone at [phone hidden]. Full details and documentation are accessible via the provided Vermont Business Registry link, and all activities must comply with state and federal environmental and construction standards applicable to decentralized wastewater systems.

General Info

Replace outdated wastewater infrastructure with new treatment facility and sewer lines in Vermont.

Documents

1

Montgomery Center Community Wastewater Treatment System Bid Advertisement

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
The decommissioning of existing septic tanks, installation of new septic tanks, constructing a new Water Resource Recovery Facility (WRRF), new effluent pump stations, new small diameter HDPE gravity effluent sewer and effluent force mains, and other miscellaneous work.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS