Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Texas was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Central Hydraulic System - Dump Truck Design and Installation

Closed
601440000052174State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
Federal
3930--EQUIPMENT - HEAVY-DUTY FORKLIFT BRAND NAME OR EQUALThe Department of Veterans Affairs is conducting a Sources Sought Announcement to identify qualified businesses capable of supplying a heavy-duty forklift for the Northport VA Medical Center Grounds Department. This announcement is for market research purposes only and does not constitute a solicitation or request for proposals. The forklift sought is a 6,000-pound capacity, 4-wheel, diesel-powered forklift with specific features such as a Sellick SLP 60K4e-4PS model or equivalent. Key specifications include a Kohler 2.5L Tier 4 turbocharged diesel engine, fully automatic powershift transmission, 4WD axles, enclosed cab with heater, block heater, and various safety and operational features. The equipment must be hydraulically operated with pneumatic tires, meet rigorous performance and safety standards, and be maintainable by a local factory-certified repair facility. Interested respondents must provide detailed capability statements along with company information including socio-economic status, contact details, SAM UEI number, Cage Code, and Tax ID. The contractor will be responsible for delivery, installation, and transportation of the forklift to the Northport VA Medical Center. The Government expects responses by June 18, 2026, 3:00 PM EST, and no costs related to this inquiry will be reimbursed. Offers of brand name or equal products must meet all physical, functional, and performance requirements outlined, and any deviations must be clearly detailed. The procurement falls under NAICS code 333924 with a size standard of 900 employees, and there is no set-aside for this acquisition.
242-NETWORK Contract Office 02 (36C242)

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 333924
New
Federal
Electric 5k–6k Draw Bar Pull (DBP) Burden Carrier TractorThe United States Coast Guard Aviation Logistics Center is conducting market research through a Request for Information (RFI) to identify sources capable of providing or manufacturing an electric burden carrier tractor with a draw bar pull force ranging from 5,000 to 6,000 pounds. This conventional tow tractor must meet specified dimensional, performance, and operational requirements including a maximum length of 150 inches with hitches, a height no taller than 90 inches with cab and beacon, and a gross vehicle weight between 7,000 and 10,000 pounds. The tractor must be electrically powered by a lithium-ion battery with at least a 10kW capacity, have onboard and optional external charging systems compatible with specified voltage inputs, and be capable of multiple operating speeds with features such as hydrostatic and power steering, emergency steering, and a robust braking system that complies with industry safety standards. The cab must be enclosed, climate-controlled with heating and optional air conditioning, and designed for maximum visibility and operator safety, including seatbelts and safety switches. Additional design and operational criteria include corrosion resistance through specialized coatings and rustproofing, structural provisions for transportability and secure tie-downs, operator controls with clear markings, and mandated safety equipment such as an audible backup alarm, fire extinguisher, and lighting systems meeting road traffic regulations. The first unit is to be delivered 120 to 160 days after order receipt, with an estimated total of 116 production units. Respondents are requested to provide detailed capability and business information, including company size, certifications, government experience, warranty terms, delivery schedules, training offerings, and pricing estimates for shipping to Elizabeth City, North Carolina. Responses to this RFI are for informational purposes only and do not constitute a contract or commitment; no proposals or quotations are being solicited at this time. The government intends to issue a formal Request for Quotes later based on the information collected, and submissions are due by early July 2026.
Aviation Logistics Center (ALC)(00038)

POSTED

2 days ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves the design and installation of a central hydraulic system specifically for dump trucks, issued by the Texas Department of Transportation. It is a solicitation with a submission deadline set for April 30, 2026, at 4:00 PM. All updates, including any addendums or responses to questions, will be posted on the designated website, and proposers are required to regularly monitor it for such information. Late submissions will not be accepted under any circumstances. This solicitation is managed by the Texas Department of Transportation within the State of Texas. The primary point of contact for this contract is Gustavo Taborga, and inquiries or correspondence should be directed to him via the provided email address. The contract details emphasize the importance of adherence to the posted deadlines and the official communication channels to ensure compliance with all solicitation requirements.

General Info

Design and install central hydraulic system for dump trucks; submit by April 30, 2026, 4 PM.

Agency

Texas Department of Transportation

NAICS

333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing View NAICS

Place of Performance

TX, US

Set-Aside

NONE

Documents

(15)

Texas Family Code Schedule Solicitation 601440000052174

PDFother

Amend_3_601440000052174.txt

TXT

RFP Solicitation 601440000052174 Central Hydraulic System

PDFrfp

11 Certificate of Insurance - Form 1950.pdf

PDF

Solicitation 601440000052174 Exceptions Schedule

XLSXexceptions-schedule

Execution of Proposal for RFP No. 60144000052174

PDFexecution-of-proposal

Respondent References Schedule for Solicitation 601440000052174

PDFrespondent-references-schedule

Attachment A - Veteran Heroes United in Business Participation Subcontracting Plan

PDFsow

Solicitation 601440000052174 Assumptions Schedule

XLSXassumptions-schedule

Solicitation 601440000052174 Pricing Schedule

XLSXpricing-schedule

Amend_2_601440000052174.txt

TXT

TxDOT Specification 060-61-36 Central Hydraulic System Dump Truck

PDFspecifications

Solicitation 601440000052174 - Central Hydraulic System Dump Truck Design and Installation

TXTrfp

Amend_1_601440000052174.txt

TXT

Vendor Qualifications and Experience Schedule Solicitation 601440000052174

PDFvendor-qualifications-schedule

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
Contacts1 person available
OfficeTX, US
Organization / Agency
Texas Department of Transportation
Office AddressTX, US
Contacts
Gustavo Taborga

Full Description

Show more
Central Hydraulic System - Dump Truck Design and Installation NOTE: All information or changes related to this solicitation will be posted on this website. Respondents must monitor this website for any addendums, additional documents, questions and answers, or changes. The Response Due Date and Time specified on this posting is the due date and time for submitting responses. Response submittals will not be accepted after this date and time.