Central Park Pathway From Stevenson Boulevard To Lake Elizabeth Project

Closed
20260707006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 012 B1CBA2602578-0
Solicitation # B1CBA2602578-0
The Georgia Department of Transportation (GDOT) is soliciting proposals for project M006688, which involves 4.390 miles of milling, inlay, and plant mix resurfacing on SR 31, extending from the south end of the I-16/SR 404 bridge to SR 26 in Laurens County. The scope of work includes extensive pavement activities such as recycled asphalt concrete patching and Superpave application, as well as the installation of various thermoplastic and reflective pavement markings and raised markers. Additionally, the contract incorporates Intelligent Transportation Systems (ITS) specifications, requiring the delivery of NEMA TS 4 compliant LED display matrices, IP-based CCTV cameras, wireless communication systems, and mobile Environmental Sensor Stations (ESS). The contract is scheduled for completion by July 31, 2027, with a specific 60-calendar day timeframe associated with the completion of paving operations. Compliance with federal and state regulations is mandatory, including the Davis-Bacon Act, the Americans with Disabilities Act, and Georgia's E-Verify requirements. Quality standards are strictly enforced, requiring ISO 9001 or Six Sigma certification and third-party laboratory testing for ITS equipment. Acceptance is contingent upon a field test and a minimum 30-day burn-in period. Bidders must submit eligibility forms to the GDOT Office of Construction Bidding Administration by 12:00 p.m. the day preceding the August 21, 2026, letting date to avoid being rendered non-responsive.
GADOT

POSTED

32 minutes ago

DEADLINE

in about 12 hours
NAICS: 237310
New
SLED
Call 019 B3CBA2602566-0
Solicitation # B3CBA2602566-0
This solicitation, issued by the Georgia Department of Transportation (GDOT) Office of Construction Bidding Administration, is for project M006742 located in Gwinnett County. The primary scope of work involves 3.83 miles of milling, inlay, and plant mix resurfacing on SR 324, beginning west of SR 20 and extending west of SR 124. Additionally, the project encompasses the installation of Intelligent Transportation Systems (ITS) and communications infrastructure, including network switches, fiber optic transmitters, and Dynamic Message Signs (DMS) meeting NEMA TS 2 and TS 4 standards. The contract requires adherence to the 2021 Standard Specifications and 2024 Supplemental Specifications, with a final completion date of July 31, 2027. The procurement is conducted via competitive bidding, with the opening date set for August 21, 2026. Award eligibility is contingent upon passing several certification gates, including the Georgia Security and Immigration Compliance Act Affidavit (E-Verify), the Drug-Free Workplace Act, and certifications against the boycott of Israel. Contractors must provide a contract bond approved by the State Transportation Board and maintain public liability and property damage insurance. Key administrative requirements include a strict prompt payment mandate requiring prime contractors to pay subcontractors within 10 calendar days of receiving payment. Technical acceptance is based on rigorous standards for micropile placement, grout density, and fiber optic testing, with the GDOT Engineer serving as the primary authority for work approval.
GADOT

POSTED

32 minutes ago

DEADLINE

in 27 minutes
NAICS: 237310
New
SLED
Call 005 B1CBA2602556-0
Solicitation # B1CBA2602556-0
The Georgia Department of Transportation is soliciting bids for the construction of a roundabout at the intersection of US 41/SR 247 and Anthony Road (CR 5104 and CR 5481) in Bibb County, with a contract completion deadline of March 31, 2029. The project involves comprehensive roadway construction including grading, base and pavement installation with recycled asphalt concrete, curb and gutter placement, storm drainage systems, sanitary sewer and force main modifications, temporary and permanent traffic control, and installation of various traffic control devices including thermoplastic striping and raised pavement markers. Advanced transportation systems are also part of the scope, requiring installation of ESS environmental and pavement sensors, a wireless communications network supporting PtP, PtMP, and repeater configurations, and a sliding gate system with EAG mechanical components. All materials must meet strict specifications, including delivery in labeled 50-pound containers, proper preservation and handling of reinforcement steel, and end-cap protection for cable ends. The project adheres to multiple regulatory standards, including USDA, ASTM, AWWA, ANSI, GDOT Utility Accommodation Policy, and Georgia EPD guidelines, with precise acceptance criteria for micropiles, ride quality, and bridge bearing elevations. Contract compliance is governed by federal and state requirements including Davis-Bacon prevailing wage regulations, Buy America mandates for all permanently installed materials, and strict non-discrimination provisions under Title VI of the Civil Rights Act, ADA, and equal employment opportunity laws. The contractor must submit a 5% proposal guaranty and a state-approved contract bond to ensure work completion and material quality. DBE participation requirements apply if a goal is set, necessitating submission of proposed DBE participants with the bid. Prompt payment clauses mandate that subcontractors be paid within ten calendar days of the prime contractor’s receipt of payment, and all bids must include certifications addressing debarment status, lobbying activity, boycott of Israel prohibitions under Georgia law, non-collusion, and sexual harassment prevention. Payment for materials is tied to e-Ticket documentation, and as-built plans, GPS coordinates, and an ITS Project Management Plan must be submitted within 30 days of installation completion. Bids must be submitted by August 21, 2026, to the Georgia DOT bidding office in Atlanta, and failure to satisfy any certification or regulatory requirement renders a bid non-responsive.
GADOT

POSTED

32 minutes ago

DEADLINE

in about 12 hours

General Info

Agency

California → City of FremontView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Fremont, CA, 94538, USA

Set-Aside

NONE

Documents

(3)

BID_NO_26-028_PRE-BID_CONFERENCE_SIGN_IN_LIST_1784056384836.pdf

PDF

BID_NO_26-028_ADDENDUM_NO_1_1784056795890.pdf

PDF

Specs.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fremont
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Fremont
View Agency Profile
Office AddressN/A
Contacts
Connie ChaoLandscape Designer

Full Description

Show more
Bid #PWC 9005: The project scope includes the excavation and removal of existing aggregate and soil, and clearing and grubbing of existing sod for the installation of a new ADA-compliant 10-foot wide concrete pathway with aggregate base, approximately one-half mile in length. The work also involves water pollution control, abandoning an existing irrigation mainline and installing a new 8-inch irrigation mainline, modifying the existing irrigation system, fine grading, soil preparation and amendment, importing topsoil, and replacing lawn and sod. The project includes a 14-day water settlement period and a 30-day sod establishment period. An alternate bid item includes asphalt concrete paving with an aggregate base and a 6-inch wide concrete mow band.