This Solicitation opportunity from California was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Central Park Pathway From Stevenson Boulevard To Lake Elizabeth Project
Closed
20260707006State & LocalSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
General Info
Agency
California → City of FremontView Agency
NAICS
237310 - Highway, Street, and Bridge ConstructionView NAICS
Place of Performance
Fremont, CA, 94538, USASet-Aside
NONE
Documents
(3)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseClosed
Submission Closed
Organization & Contact Information
Show more
AgencyCalifornia → City of Fremont
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Full Description
Show more
Bid #PWC 9005: The project scope includes the excavation and removal of existing aggregate and soil, and clearing and grubbing of existing sod for the installation of a new ADA-compliant 10-foot wide concrete pathway with aggregate base, approximately one-half mile in length. The work also involves water pollution control, abandoning an existing irrigation mainline and installing a new 8-inch irrigation mainline, modifying the existing irrigation system, fine grading, soil preparation and amendment, importing topsoil, and replacing lawn and sod. The project includes a 14-day water settlement period and a 30-day sod establishment period. An alternate bid item includes asphalt concrete paving with an aggregate base and a 6-inch wide concrete mow band.
