Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cerritos Avenue (Walnut St. to Ninth St.) Water Main Replacement

Closed
RCP2025-23539State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract entails the replacement of an existing 10-inch cast iron water main with a new, larger 12-inch ductile iron pipe along Cerritos Avenue, spanning from Walnut Street to Ninth Street. This upgrade includes the abandonment of the older main, replacement of various domestic water services ranging from 1-inch to 2-inch in size, and the installation of new fire hydrants to improve water infrastructure. Additionally, the project requires the restoration of pavement in areas affected by trenching to ensure road surface integrity post-construction. Issued by the Public Works agency of California, the solicitation for this contract was posted on January 30, 2026, with a response deadline of February 19, 2026. The work will be performed within the state of California, specifically managed through the office located in Anaheim. The primary point of contact is John Martin, the Construction Contracts Administrator, reachable via email or phone. This project is solicited to enhance water service capacity and reliability while maintaining public infrastructure standards.

General Info

Replace 10-inch cast iron water main with 12-inch ductile iron pipe on Cerritos Avenue.

Documents

3
PDF, High priority: read this first455 pages · rfp
High
PDF, High priority: read this first11 pages · plans
High
PDF, High priority: read this first9 pages · traffic-control-plans
High

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeAnaheim, CA, 92805, USA
Organization / AgencyCalifornia → Public Works
Office AddressAnaheim, CA, 92805, USA

Interested Companies (23)

ACCO Engineered SystemsCosta Mesa, California
All American AsphaltCorona, California
American Pipeline ServicesMONROVIA, CA

See All 23 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
This project involves abandoning the existing 10-inch cast iron water main and upsizing the new main to 12-inch ductile iron pipe. The project also involves the replacement of large domestic water services, 1-inch and 2-inch water services, and fire hydrants, as well as pavement restoration of trenched areas.

More opportunities from California → Public Works

Same awarding agency

NAICS: 236220
New
SLED
GENERAL CONTRACTOR PRE-QUALIFICATION PACKAGE TUSTIN POLICE DEPARTMENT LOCKER ROOM RENOVATION PROJECT
Solicitation # 2026-RFP-019
The City of Tustin is seeking Statements of Qualifications and completed Pre-Qualification Questionnaires from licensed General Building Contractors for the Tustin Police Department Locker Room Renovation Project. Located at 300 Centennial Way, the project involves the interior renovation of employee support spaces, including the modernization of men's and women's locker rooms, private changing areas, an employee lounge, and lactation/wellness spaces. The scope includes selective demolition, framing, drywall, flooring, painting, and the installation of new lockers and millwork. To maintain active police operations, the contractor must provide temporary facilities, including a locker room/shower trailer and an accessible restroom trailer, while adhering to ADA standards and strict security requirements, including DOJ fingerprinting and clearance for all personnel. The pre-qualification process, designed to comply with California Public Contract Code section 20101, is mandatory for any contractor wishing to bid. Evaluation is based on objective criteria, with a focus on comparable project experience in occupied municipal facilities, key personnel expertise, operational phasing experience, financial capacity, safety records, and performance history. Mandatory requirements include valid licensing, DIR registration, insurance, and bonding. Submittals must not exceed 50 pages and must be delivered via OpenGov by December 22, 2026. The City will use this process to identify the lowest responsible bidder, requiring adherence to the 2024 Standard Specifications for Public Works Construction (The Green Book) and compliance with California prevailing wage and labor laws.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS