Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CES Expansion UPS Upgrade

Closed
W91SMC26QA016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530, project number 7190530, involves upgrading life health safety systems within Hangar 250 at MCAS Cherry Point in Havelock, North Carolina. The scope of work encompasses architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work occurs in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price. Bidders must submit proposals by September 21, 2026, and those exceeding 150,000 dollars are required to provide bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act and Buy American requirements. Key deliverables include a facility operating plan and manufacturer-provided training information. Administrative requirements include submitting invoices via Wide Area Workflow and providing a detailed schedule of prices within 15 days of the award. Quality control is heavily emphasized, requiring the Contracting Officer's acceptance of a QC plan before any construction work, other than mobilization and surveying, may begin.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 15 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The 183d Wing at the Abraham Lincoln Capital Airport in Springfield, Illinois, has issued solicitation W91SMC26QA016 for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8. The project involves the demolition and removal of an existing 10 kW Liebert EXM UPS system and the installation of a new, scalable 20 kW static UPS system, which must be capable of expanding to 30 kVA/kW for future requirements. Key scope items include electrical and site preparation, sealing all wall, floor, and ceiling penetrations to maintain fire and assembly ratings, and performing full system adjustments and load balancing through factory-trained field service personnel. The estimated project magnitude is between $25,000 and $100,000, and the period of performance is 120 calendar days or less following the Notice to Proceed. This procurement is a 100% small business set-aside under NAICS code 236220. Interested offerors must submit their RFQ packages by August 25, 2026, at 11:00 AM CDT, including a signed Standard Form 1442, the priced RFQ schedule, and completed representations and certifications. While bid bonds are not required due to the project magnitude, the contractor must provide performance and payment bonds and adhere to the Davis-Bacon Act construction wage rate requirements. All work must comply with Unified Facilities Criteria and DoD technical standards, specifically TP-19 for static UPS systems. The government intends to evaluate offers based on price, technical rating, and past performance, with the award to be made without discussions. Payment requests must be submitted electronically via the Wide Area WorkFlow (WAWF) system.

General Info

Upgrade 10 kW to 20 kW UPS in Building 8, Springfield, IL, with disposal, sealing, testing, completion in 120 days.

Agency

Department Of Defense → W7M6 Uspfo Activity Il ArngView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Springfield, IL, USA

Set-Aside

SBA

Documents

(25)

IMG_1297.jpg

JPG

IMG_1289.jpg

JPG

IMG_8292.jpg

JPG

IMG_4542.jpg

JPG

IMG_1290.jpg

JPG

IMG_8294.jpg

JPG

IMG_1287.jpg

JPG

Pre-RFQ Slides for CES UPS Expansion & Base Signage Upgrades - 183 WG Springfield IL

PPTXpresolicitation

IMG_1294.jpg

JPG

IMG_4693.jpg

JPG

IMG_1295.jpg

JPG

IMG_8291.jpg

JPG

SOW for UPS Expansion Upgrades at 183d Wing, Springfield IL

PDFsow

IMG_1288.jpg

JPG

IMG_4692.jpg

JPG

IMG_8290.jpg

JPG

CES UPD Expansion Upgrade B-8 Sign-In Sheet 8-11-2026

PDFsign-in-sheet

Solicitation W91SMC26QA016 UPS Expansion Upgrade IFB

PDFifb

Minutes of Pre-Quote Conference and Site Visit for Solicitation W91SMC26QA016 and A017

PDFmeeting-minutes

SF 1705 Consent for Background Check

PDFconsent-form

IMG_4545.jpg

JPG

IMG_8293.jpg

JPG

IMG_4544.jpg

JPG

Existing+B8+-+Electrical+Drawings.pdf

PDF

IMG_4541.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7M6 Uspfo Activity Il Arng
Contacts1 person available
OfficeSPRINGFIELD, IL, 62702-2399, USA
Organization / Agency
Department Of Defense → W7M6 Uspfo Activity Il Arng
View Agency Profile
Office AddressSPRINGFIELD, IL, 62702-2399, USA

Full Description

Show more

*Edit 8/12/26 - added Slides and Minutes from Pre-Quote Conference and Site Visit.*


The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.


SITE VISIT - 11 AUG 2026 @ 1300.


The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.


Key scope items include:


  • Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.
  • Site and electrical preparation for the new system.
  • Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).
  • Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.
  • Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.

Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).


See Solicitation for additional information. 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS