Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

CGC Kathleen Moore 100ton Crane Services

Active
52050PR260000515Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Homeland Security → Base MIAMI(00028)View Agency

NAICS

238990 - All Other Specialty Trade ContractorsView NAICS

Place of Performance

Miami Beach, FL, 33139, USA

Set-Aside

SBA

Documents

(3)

CGC Kathleen Moore 100ton Crane Services Specifications

PDFsow

154-WPC_204_301_1 Equipment Removal List

PDFspecifications

52050PR260000515 - CGC Kathleen Moore 100ton Crane Services

PDFrfq

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base MIAMI(00028)
Contacts2 people available
OfficeMIAMI, FL, 33132, USA
Organization / Agency
Department Of Homeland Security → Base MIAMI(00028)
View Agency Profile
Office AddressMIAMI, FL, 33132, USA

Full Description

Show more

This combined synopsis/solicitation for construction services prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation (FAR) as supplemented with additional information included in this notice. This synopsis/solicitation is being advertised as Small Business Set-Aside only. This announcement constitutes the only solicitation; no separate written solicitation will be issued.


The solicitation number is 52050PR260000515.


Applicable North American Industry Classification Standard (NAICS) codes are:
238990 (All Other Specialty Trade Contractors)


This requirement is for a fixed price contract. The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15.


The Government will award a contract resulting from this solicitation to the responsible offer or whose offer conforming to the solicitation will be most advantageous to the Government, Best Value.


When submitting your proposals, request a price breakdown of the following:
a. Cost of materials and equipment
b. Cost of labor


Contract will be awarded to the vendor who can provide Best value which includes all labor, material, cost and equipment required within the SOW. Cost and Past Performance factors will also be considered when selecting the award.


Anticipated award date: 10 business days after close of solicitation, OOA 12 OCT 2026.


Quotes are to be received no later than close of business (3 p.m.) on 02 October 2026 and are to be sent via e-mail to Angel.melendez@uscg.mil


Quotations sent via the US Postal Service or hand delivered should be sent to:


Commanding Officer USCG Base Miami Beach (P&C)


Attn: Angel Melendez
12100 SW 152nd Street
Miami, FL 33177.


Telephone requests of quotes, will not be accepted, a formal notice of changes (if applicable) will be issued in SAM (www.sam.gov).


Wage determinations: FL20240184 01/05/2024


*SCOPE OF WORK
DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD BASE MIAMI BEACH SPECIFICATIONS FOR


CGC Kathleen Moore 100ton Crane Services


General: United States Coast Guard Base Miami Beach is accepting proposals for qualified the Contractor shall furnish all crane services, rigging equipment, operators necessary to safely remove the extract the existing main diesel engines (MDEs) and install new MDEs aboard CGC Kathleen Moore. Services shall be performed in accordance with applicable Coast Guard specifications, drawings, and safety requirements.


Location:
United States Coast Guard Base Miami Beach
100 MacArthur CSWY
Miami Beach, FL 33139


Examination of Site: It is HIGHLY ENCOURAGED that bidders carefully inspect the work in place and verify the amount of work necessary to complete the job. Prospective bidders arrange for a tour of the job site by calling the point of contact, LT Allie Doris at (786)299-7906 or by e-mail at carrie.a.doris@uscg.mil, at least 3 working days in advance.


I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility’s normal operations. Normal operating hours are from 6:30am to 2:30pm Monday thru Friday except federal holidays. Any work during other hours shall be requested in writing at least 5 working days in advance and must be approved by the Contracting Officer.


II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work.


III. Coast Guard Contracting Officers Representative: The Contractor shall contact the Contracting Officer’s Representative (COR) to coordinate all construction efforts onboard Coast Guard Facilities.
LT Allie Doris - COR
Carrie.A.Doris@uscg.mil
786-299-7906
Mr. Bryan Goltz
Bryan.W.Goltz@uscg.mil
786-350-9700


IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of in contractor provided dumpsters


V: Safety: During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction. The contractor shall have a written safety plan as required in FAR 5.236-13. The plan shall unequivocally assign responsibility and authority for safety to the superintendent by name. Immediate notification to the Contracting Officer’s Representative of lost time due to accidents is required. Provide two copies of workman’s compensation accident reports by noon of the day following the accident. The Coast Guard reserves the right to bar any workers or supervisors from the premises should they be documented as violating set safety standards and regulations.


VI. Inspection: The Contracting Officer’s Representative has the right to reject defective workmanship or materials or work not performed as per the project specifications. Only the Contracting Officer or his/her representative may accept work performed by the contractor.


VII. Operations and Storage: The contractor is to take whatever steps necessary to ensure that his materials are protected. The Coast Guard has no responsibility for receipt, storage, or
protection of contractor’s materials. All equipment, materials and supplies shall be addressed to the contractor. The Coast Guard will not accept shipments. The contractor is responsible for the protection of existing structures, utilities, work and vegetation. Any damage shall be repaired at the contractor’s expense.


VIII. Contractor Identification: The contractor and subcontractor personnel shall always wear company identification and carry personal identification.


IX. Existing Utilities: The Contractor shall field verify all utility locations before commencing work. This shall include, but not be limited to, the use of visual, sonic, electronic or magnetic detection devices. Contractor shall be responsible for repairing any utilities damaged during construction at no additional cost to the Government.


X: Regulations while onboard Coast Guard Base Miami Beach:


1.Daily colors and the raising/lowering of the American flag will take place every morning at 0800 and every evening at sunset. All personnel on Base will face the main flagpole & maintain silence and all vehicles & equipment will halt during these brief events.
2.The construction site shall always be maintained in a clean condition. This included daily clean-ups of the construction and storage areas (FAR 52.236-12). The site shall be well lit and well barricaded/cordoned off as appropriate.
3.Contractors are welcome to eat breakfast & lunch on Base in the base galley at cost. Breakfast is served from 0630-0730 daily & lunch will be served from 1130-1230 daily in the galley. All personnel desiring meal service shall be in clean, non-soiled clothing. The Coast guard reserves the right to refuse service to anyone it deems dirty.
4.There is one smoking area on base located in the central northern parking lot covered by the tiki hut. No smoking is permitted anywhere else on base.
5.Contractors are welcome to utilize the Base’s Exchange store; however, contracted personnel are prohibited from purchasing any uniform, alcohol or tobacco products in it.
6.Traffic Regulations:
a)10 mph speed limit
b)No use of cell phones is permitted while driving vehicles or operating heavy machinery
c)All personnel shall obey all marked traffic signals including stop signs & stop lights.
7.Absolutely no firearms or weapons of any kind are allowed onboard Base.
8.Only American citizens and permanent resident aliens are allowed onboard Base. Absolutely no foreign nationals are permitted on the premises.
9.Notice shall be given to the Coast Guard’s representative 1 week in advance of any planned power, water, sewage or lighting outages.
10.The contractor shall provide a consolidated list of all contracted personnel including their driver’s license numbers (or other valid gov’t issued ID number) who will be working on Base Facilities either the day of or prior to the notice to proceed date.
11.Contractors are welcome to utilize the restrooms on the 1st decks of Buildings 3, 4, and 7 providing they are clean and do not track mud, dirt or any other debris into the restrooms.
12.Should warnings of gale force or stronger winds, or other inbound natural disasters be issued, the contractor shall take every practicable precaution to minimize the danger to
persons, to the work, and the adjacent property. These precautions shall include closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing scaffolding, securing field trailers, and other appropriate equipment and other temporary work.
13.No personnel other than the Contracting Officer has the authority to alter the terms of any contract or to issue any change orders.
14.All contractor vehicles, equipment and gear onboard Coast Guard properties are always subject to search. Additionally, due to security and operational needs, Contractors are subject to orders to evacuate the property at any time.
15.Due to the compact & dense nature of operations & support functions ongoing on-board Base all efforts within reason to minimize the size and footprint of the contractor’s lay down area shall be taken. Contractors shall carpool as much as possible to minimize the number of vehicles needing parking on Base. At a minimum, the ratio of contractors to contractor vehicles shall be no less than 2:1.
16.All piers and waterfront bulkheads on base are load restricted in some form. If contractors need to bring heavy equipment (cranes, forklifts, 18 wheelers, man-lifts, construction equipment, backhoes, excavators or other equipment heavier than standard sedans) closer than 40’ to any pier or waterfront bulkhead on Base to complete their project, the contractor shall submit a request for information (RFI) to the COR at least 1 week in advance.
XI: SCOPE OF WORK:
3.1 Pre-Lift Planning
•Develop and submit a Rigging Plan detailing crane type, lifting capacities, load charts, and step-by-step evolution for engine removals.
•Identify all lifting appliances (slings, spreader bars, shackles, etc.) and ensure they are properly rated and certified.
•Provide certification documentation for crane, rigging gear, and operators prior to commencement.
•Incorporate stability considerations and counterbalance weight requirements to maintain safe load handling.
3.2 Crane Operations
•Engine Removal: Using certified lifting gear and spreader bars, remove existing MDEs through designated access openings. Coordinate with Contractor performing engine preservation.
•Engine Installation: Rig and install two Government-furnished MTU 20V4000M93L engines, aligning them within tolerances to reduction gearboxes.
3.3 Safety & Notifications
•Comply with OSHA (29 CFR 1915) and Coast Guard facility safety requirements.
•Provide a spotter/signalman for all critical lifts.
•Notify COR/Port Engineer 24 hours in advance of all lift operations for Government witness and inspection.


4. Deliverables
•Rigging Plan: Detailed lifting sequence and certification documentation.
•Condition Found Reports (CFRs): Submitted for any structural or lifting discrepancies.
•Final Report: Documenting successful completion of engine lifting operations.


5. Schedule • Engine Removal & Installation: During main engine renewal availability.


6. Quality Assurance
All crane operators must hold current certification under OSHA/ANSI standards. Rigging equipment shall be inspected before each lift. All evolutions must be witnessed and signed off by the Contracting Officer’s Representative (COR)/Port Engineer.


7. References
•Coast Guard Drawing 154 WPC 204-301 Rev F – Equipment Removal Plan
•Coast Guard Drawing 154 WPC 200-301 – Machinery Arrangement Drawings
•Coast Guard Technical Publication (TP) 8902C – Main Propulsion Diesel Engine, Removal & Installation Requirements
•SFLC Standard Specification 0000 – General Requirements
• SFLC Standard Specification 0740 – Welding and Allied Processes


Q&A’s: Questions concerning the work requested must be sent to Angel.melendez@uscg.mil by September 23, 2026. These Q&A’s will be answered and posted to this solicitation as an amendment prior to close of solicitation.


APPLICABLE FAR CLAUSES
FAR 52.213-4: 52.213-4 Terms and Conditions-Simplified Acquisitions (Other
Than Commercial Items).
ATTACHED BY REFERENCE
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS 52.236-2 DIFFERING SITE CONDITIONS (APRIL 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APRIL 1984)
52.236-27 SITE VISIT (CONSTRUCTION) {FEB 1995)
Work hours: Monday through Friday, 0800 – 1500 (8 am – 3 pm) No weekends or Holidays authorized.
See attached applicable FAR Clauses by reference.
Offerors may obtain full text version of these clauses electronically at: www.arnet.gov/far
The following Homeland Security Acquisition Regulations (HSAR) are incorporated as addenda to this solicitation: HSAR 3052.209-70 Prohibition on Contracts with Corporate Expatriates (Jun 2006); Contracting Officers Technical Representative (Dec 2003) (COTR) HSAR 3052.237-72. Copies of HSAR clauses may be obtained electronically at http://www.dhs.gov.
Request Company’s tax ID information and UEI number.
Vendors providing an offer must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award.
Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Homeland Security → Base MIAMI(00028)

Same awarding agency

NAICS: 326299
New
Federal
USCG Base Miami Beach Replacement Fenders
Solicitation # 31020PR260000231
The United States Coast Guard Base Miami Beach Facilities Engineering division is soliciting quotations for a firm-fixed-price contract to procure three high-performance, foam-filled marine fenders. These fenders must have a nominal diameter of 5 feet and a length of 8 feet, featuring a 100 percent closed-cell, cross-linked PE/PU foam core and a minimum 1.0 inch reinforced elastomeric polyurethane skin in non-marking marine black. All internal tension components, including the central chain/pipe assembly, swivel end fittings, and bow/anchor shackles, must be constructed exclusively from Type 316 stainless steel. The fenders must meet specific performance standards, including a minimum energy absorption of 136 ft-kip and a maximum reaction force of 101 kip, with quality assurance backed by an active ISO 9001 certification and recognized marine classification society approval such as ABS. This procurement is a 100 percent total small business set-aside under NAICS code 326299. The selected contractor will be responsible for providing technical data, mill test reports for all stainless steel hardware, and certified performance verification reports. Delivery is FOB Destination to USCG Base Miami Beach, Florida, and must be coordinated with a 48-hour arrival notification. Fabrication cannot begin until the Contracting Officer's Representative provides written approval of all submittals, which are due within 15 calendar days of the award. Award will be based on the best value, defined as the lowest evaluated price among technically acceptable offerors who meet the specified technical and past performance criteria.
All Other Rubber Product Manufacturing

POSTED

5 days ago

DEADLINE

in 2 days
View Details
NAICS: 336611
New
Federal
CGC Kathleen Moore Pre-Alignment, Alignment, Post-Alignment Verification
Solicitation # 70Z02826Q0000495
Solicitation 70Z028-26-Q-0000495 is a small business set-aside for a firm fixed price services contract to be awarded using simplified acquisition procedures under FAR part 13. The project requires a qualified contractor to provide all labor, supervision, materials, and equipment for the pre-alignment inspection, precision alignment, and post-alignment verification of two newly installed MTU 20V4000M93L main diesel engines aboard the CGC Kathleen Moore. The work will be performed at USCG Base Miami Beach, Florida, and must ensure proper integration with existing reduction gears and propulsion system components, specifically utilizing Geislinger couplings. The contract will be awarded based on the Lowest Price Technically Acceptable offer, with an anticipated award date of September 30, 2026. The contractor must employ technicians certified and experienced with MTU 20V4000M93L engines and coordinate with a Coast Guard-provided MTU Technical Representative. Key deliverables include Pre-Alignment, Alignment, and Post-Alignment Condition Found Reports, as well as a signed engine change-out inspection form. Performance must adhere to MTU and USCG tolerances, Coast Guard Technical Publication 8902C, and specific Coast Guard drawings. Access to the facility is restricted to American citizens and permanent resident aliens, and all personnel must comply with strict base security and operational protocols at Base Miami Beach. Quotes are due by 3 p.m. on September 24, 2026, and must be submitted via email to Jerry Lopez.
Ship Building and Repairing

POSTED

6 days ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS