Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Chandler Bikeway Extension Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Chandler Bikeway Extension Project is a 0.6-mile infrastructure initiative in Burbank, California, designed to connect the existing eastern terminus of the Chandler Bikeway at Mariposa Street to the San Fernando Bikeway along the Burbank Western Channel. The project will construct a multimodal bikeway system combining Class I and Class IV fully separated bike paths, utilizing former Union Pacific rail corridor land and existing city rights-of-way without requiring any new property acquisitions. Key deliverables include safety enhancements at rail crossings such as gates, warning devices, and channelization; access-restricting fencing to prevent unauthorized entry onto active railroad tracks; upgraded lighting along the trail and channel; and signal timing evaluations. All elements of the project must comply with ADA standards and California Public Utilities Commission General Order 88-B, with additional adherence required to the CPUC’s Environmental and Social Justice Action Plan regarding safety, air quality, public health, and community outreach. Coordination with Union Pacific Railroad and the CPUC’s Rail Crossings Engineering Branch is mandatory for design approvals and operational safety. The project is administered by the City of Burbank as the contracting authority, with regulatory oversight handled by the CPUC. While the contract is currently in a forecast stage and no formal solicitation number, award type, contract value, or period of performance has been defined, the point of contact for project inquiries is David Kriske, Assistant Community Development Director – Transportation Planning. No federal acquisition regulation clauses, evaluation factors, or submission instructions are included in the available documentation, as this appears to be a pre-solicitation planning document. No packaging, marking, preservation, or invoicing requirements are specified, and there are no references to contract administration personnel such as a COR or PCO, indicating that oversight responsibilities remain with city and regulatory agencies rather than federal contracting officials. Attachment lists, representations, and socioeconomic certifications are absent, consistent with the project’s preliminary nature. The place of performance is entirely within Burbank, California, along the designated bikeway alignment.

General Info

Burbank to extend 0.6-mile multimodal bikeway connecting Chandler and San Fernando Bikeways using existing rights-of-way.

Agency

California → City of Burbank

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Mariposa Street, Chandler Boulevard, Victory Boulevard, and Cypress Avenue, Burbank, CA

Set-Aside

NONE

Documents

(2)

Chandler Bikeway Extension Project Notice of Exemption

PDFnotice-of-exemption

2025110797_CPUC_Comment Chandler Bikeway Extension Project Notice of Exemption

PDFcomment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Burbank
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Burbank
Office AddressN/A
Contacts
David KriskeAssistant Community Development Director - Transportation Planning

Full Description

Show more
The Chandler Bikeway Extension is a 0.6-mile bikeway extension that would construct a two-way Class I (fully separated bike path) and Class IV (fully separated in-street bike path) bikeway and streetscape improvements, between the existing eastern terminus of the Chandler Bikeway at Mariposa Street and the San Fernando Bikeway extension along the Burbank Western Channel. The Project would be constructed on former Union Pacific rail line now owned by the Metropolitan Transportation Authority and within existing City rights-of-way. No property acquisitions are required to implement this Project.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 18 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 19 hours ago

DEADLINE

in 24 days
View Details