Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Agriculture was posted on July 25, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CHATTAHOOCHEE-OCONEE NATIONAL FORESTS- Morganton Point Campground Bathhouse

Awarded
Federal
Submission Closed
Solicitation #
AG-435H-S-15-0016

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 involves the repair and modernization of the Auto Maintenance Facility, Building 575, at MCB Camp Lejeune, North Carolina. The scope of work includes selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires site improvements such as paving, drainage upgrades, and hazardous materials abatement. The estimated contract value is between $10 million and $25 million, with a completion period of 730 days. The contract is a fixed-price award based on the lowest price, with pricing required for building renovation and paving replacement. Proposals are due by December 2, 2026. Bonding requirements vary by proposal value, with those $150,000 or greater requiring bid, payment, and performance bonds. Key personnel requirements specify that the Quality Control Manager must be a stand-alone position, though the Superintendent and Site Safety and Health Officer roles may be combined. The project must adhere to ADA accessibility standards, Buy American requirements, and specific cybersecurity protocols for facility-related control systems. Invoicing is managed through Wide Area WorkFlow (WAWF) using standard NAVFAC forms.
Bristol Alliance of Companies

POSTED

38 minutes ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
DB Repair Fire Sprinkler Deficiencies, B290, PSNS
Solicitation # N4425527RB007
This Design-Build contract, designated as an 8(a) Multiple Award Construction Contract, focuses on repairing fire sprinkler deficiencies at Building 290 and the adjoining covered loading dock platform, Building 719, at the Puget Sound Naval Shipyard in Bremerton, Washington. The contractor is responsible for producing final design documentation per FC 1-300-09N Navy and Marine Corps Design Procedures and providing all necessary construction materials and labor. Key technical objectives include resolving a Risk Assessment Code Level 4 (RAC-4) deficiency by extending sprinklers to the loading dock platform, ensuring elevator pit sprinkler control valves are locked in the open position and monitored by the fire alarm system, and installing missing backflow preventers on the north and south 6-inch diameter wet pipe sprinkler system risers in the basement. The project is a Firm Fixed-Price effort with an estimated magnitude between $1 million and $5 million and a period of performance of 440 days from the date of award. Evaluation is based on price and MACC past performance, with a single CLIN (0001) covering all labor, materials, and equipment. The scope is governed by Unified Facilities Guide Specifications and requires strict adherence to safety and security protocols, including cybersecurity standards for facility-related control systems and restrictions on the use of personal electronic devices near classified information. Proposals are submitted via the PIEE portal, with the final deadline extended to December 16, 2026.
Bristol Alliance of Companies

POSTED

38 minutes ago

DEADLINE

in 6 days
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a design-build project for the renovation and modernization of Facility #6594 (Transfer Facility) at Naval Base Kitsap Bangor, Washington. The project is estimated between $10 million and $25 million and is structured as a firm-fixed-price contract. The scope involves a critical two-phase execution to ensure the facility remains operational and mission-capable throughout the process. Phase 1 encompasses all initial design and construction work, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. Key requirements include the provision of all construction documents during Phase 1, compliance with NAVFAC, UFC, and cybersecurity standards, and the implementation of multiple mobilization and demobilization cycles. The project requires strict adherence to security protocols and technical standards, including the installation of new panel boards with surge protection and the construction of a 400 sq ft forklift battery charging facility. Evaluation is based on price and MACC past performance. Proposals must be submitted via the PIEE portal by December 7, 2026, at 11:00 am local time. The contractor must comply with various FAR and DFARS clauses, including Davis-Bacon Act regulations, CMMC Level 1 requirements, and the Buy American Act. No set-aside status is specified for this solicitation.
Bristol Alliance of Companies

POSTED

38 minutes ago

DEADLINE

in 8 days
NAICS: 236220
New
Federal
Site Visit (required) Replacement of existing damaged fire rated doors and frames-
Solicitation # 26-141
Solicitation 26-141 is for the removal and replacement of damaged fire-rated doors and frames at the Atterbury Job Corps Center cafeteria in Indiana. The project requires the installation of new fire-rated doors while reusing existing closure systems and push bars. All work must comply with local, state, and federal building codes, as well as EPA and OSHA regulations, with Indiana regulations taking precedence if they are more stringent. The contract is a small business set-aside, open to SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Prospective bidders must attend a mandatory site visit on December 1, 2026, and submit a single lump sum proposal with a detailed cost breakdown by December 11, 2026. Award selection is based on best value, evaluated through a 100-point system covering price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Required documentation includes a valid Indiana Contractor's License, Davis-Bacon Act wage rate certification, a 90-day bid guarantee, and proof of insurance naming Adams and Associates, Inc. as an additional insured. Once accepted, the contractor must start work within 14 days and provide a sequenced construction schedule within 10 days of the Notice to Proceed. Payment terms are Net 30, and a one-year guarantee of workmanship is required upon substantial completion.
Atterbury Job Corps – Adams & Associates

POSTED

44 minutes ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The Chattahoochee-Oconee National Forest, under the Department of Agriculture, issued solicitation AG-435H-S-15-0016 for the construction of a new bathhouse facility at the Morganton Point Campground in Morganton, Georgia. This total small business set-aside project involves the construction of a 6-unit bathroom with showers, accessible parking, a gravity sewer system, and a dump station. The scope of work includes the demolition of the existing bathroom building and the abandonment of the current septic tank and drainfield. The project is located in the South loop between campsites 16 and 18 within the Blue Ridge Ranger District. The contract was estimated to cost below 450,000 dollars with a projected start date of September 15, 2015, and a performance duration of 180 days, leading to a completion date in March 2016. The contractor is responsible for providing all labor, supervision, equipment, and materials necessary to complete the work according to the technical specifications and construction drawings. Key administrative details include that the Forest Service is responsible for securing the building permit, and the contractor must coordinate with the Contracting Officer's Representative before clearing and grubbing to manage the closure of the camping loop.

General Info

Contract Value

$419,766.47

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Morganton Point Canpground, MORGANTON, GA, USA

Set-Aside

Total Small Business Set-Aside

Award Issued Date

Potential End Date

April 15, 2016

Documents

8
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfp
High
PDF, Low priorityspecifications
Low
RTF, Low priority5 pages · bid-bond
Low

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
  • Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Chattahoochee Oconne National Forest
Contacts1 person available
OfficeGAINESVILLE, GA, 30501, USA

Full Description

Show more
The Contractor(s) shall furnish all labor, supervision, equipment and materials to perform all operations necessary to accomplish the work in accordance with the Solicitation, Provisions, Contract Clauses, and Statement of Work. This project involves construction of a 6 Unit Bathroom with showers with accessible parking, gravity sewer system and dump station. It will include demolition of existing bathroom building, abandonment of existing septic tank and drainfield. Morganton Point Campground South loop between campsite 16 and 18. From Blue Ridge, GA take US 515 north for 4 miles to GA Hwy. 60; turn right and go 0.5 miles to stop sign. Turn left, go 1.5 miles to the town of Morganton, GA. In Morganton, turn right on Lake Dr and the Campground is on the left. Estimated Start Date - September, 2015 Contract duration - 180 days Completion Date - March, 2016 A non-mandatory prebid tour is scheduled for June 25, 2015, at 10:00 a.m. at the project site. (this date and time may change, contact the COR for questions). Joel Ortiz, COR Sign up to see this detail. Estimated Price- Below $450,000 A complete Solicitation will be available by June 19, 2015

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS