Chemical Grouting and Joint Sealing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Chemical Grouting and Joint Sealing involves performing packer injection grouting for prime contractors on sewer projects within the Laguna County Sanitation District. The scope of work focuses on injecting chemical grout into the annular spaces between liners and host pipes using the packer method, supported by CCTV inspection to ensure precision. The contractor is responsible for delivering sealed pipe joints and providing detailed test reports, with all pump and grout gel tests conducted in accordance with ASTM F2304 and ASTM F2454 standards. The work is to be performed in Santa Maria, California, with a response deadline set for November 19, 2026.

General Info

Place of Performance

Santa Maria, CA, 93455, USA

Set-Aside

NONE

Documents

This scope was carved out of FOSSWR.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Foster Road Sewer Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Laguna County Sanitation District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs packer injection grouting for prime contractors on Laguna County Sanitation District sewer projects. Injects chemical grout into annular spaces between liners and host pipes using the packer method and CCTV inspection. Conducts pump tests and grout gel tests per ASTM F2304 and ASTM F2454. Delivers sealed pipe joints and detailed test reports.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Livermore Village Infrastructure Project, Lightwell Stair Replacement
Solicitation # DR583018
The City of Livermore is soliciting bids for the L Street Parking Garage Lightwell Stair Replacement project, identified as solicitation DR583018. The scope of work involves the demolition of existing concrete lightwell stairs and the installation of a new steel stair assembly featuring precast concrete treads, handrails, and associated structural framing. The project requires the contractor to provide all necessary concrete formwork, reinforcing steel, and metal fabrication, ensuring that the final assembly complies with the 2010 ADA Standards for Accessible Design and governing building codes. Because the parking garage will remain fully operational during construction, the contractor must implement careful scheduling and temporary traffic control systems. The contract is awarded based on a low-bid selection process, requiring a signed and sealed bid proposal accompanied by a bid schedule and a bid security deposit equal to ten percent of the maximum bid amount. Technical requirements include shop drawings and calculations signed by a California-registered Civil Engineer, with structural designs adhering to AISC, AWS D1.1, and ASCE 7 seismic standards. The contractor is responsible for all temporary utilities, site access, and environmental controls. Performance is monitored by the City and its Engineer, with progress payments processed within 30 days of certification. Required security for the awarded contract includes payment, performance, and warranty bonds.
City of Livermore

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → Laguna County Sanitation District

Same awarding agency

NAICS: 237110
New
SLED
Foster Road Sewer Rehabilitation Project
Solicitation # FOSSWR
The Foster Road Sewer Rehabilitation Project, solicitation number FOSSWR, is a construction contract issued by the Laguna County Sanitation District in Santa Maria, California. The scope of work involves sewer rehabilitation utilizing chemical grout materials and cured-in-place-pipe liners and point repairs. The project requires substantial completion within 80 working days and final completion within 90 working days. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on price, qualifications, financial ability, and the experience of proposed subcontractors and suppliers. Bidders must comply with California Department of Industrial Relations prevailing wage rates and provide performance and payment bonds each totaling 100 percent of the contract bid. Required submission documents include a Construction Contractor’s Qualification Statement with detailed schedules of current and previous experience, key personnel qualifications, and certifications regarding drug-free workplaces, affirmative action, and the payment of state and local taxes. Technical requirements include strict adherence to manufacturer recommendations for liner materials, the installation of no dumping stencils on catch basins, and the posting of warning signs in chemical treatment areas. All work must be performed in accordance with Santa Barbara County Code and referenced state codes.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS