Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wyoming was posted on April 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Cheyenne Fire Station 1 Roof Replacement

Closed
S-18-24State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 1 hour ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
Emergency Board-Up Services Request For Qualifications
Solicitation # 102126
The City of Santa Monica Fire Department is seeking qualified service providers to establish a list of contractors for emergency as-needed board-up services. The primary objective is to secure residential and commercial structures following fire incidents to prevent unauthorized entry, theft, or vandalism, particularly when property owners are unavailable. Selected contractors must be able to respond to fire scenes within one hour of notification and provide all necessary labor, tools, materials, and equipment, including temporary fencing. A critical term of this agreement is that the City and the Fire Department are not responsible for payment; contractors must recover all costs directly from property owners, occupants, or insurance companies and have no recourse against the City if reimbursement is not obtained. To qualify, bidders must hold a valid Class-B California contractor's license and a City of Santa Monica business license. The award will be based on the best bidder, evaluated on criteria including pricing, availability, experience, references, and the quality of services. The contract includes a payment term of 30 days from the receipt of an invoice and offers the City the option for four additional one-year renewal periods. All submissions must be made electronically via the OpenGov portal by November 6, 2026. Required documentation includes a mandatory release form, a payment bond, and certifications regarding non-discrimination and debarment.
D190 FIRE DEPARTMENT

POSTED

about 5 hours ago

DEADLINE

in 9 days
NAICS: 238160
New
SLED
Highland Police Station Membrane Roof Replacement Project
Solicitation # 2026-05
The City of Highland, California, is soliciting bids for the Highland Police Station Membrane Roof Replacement project, identified as solicitation 2026-05. The scope of work involves retrofitting a KEE membrane roof system using Tremco CPG Inc products over the existing roof, replacing metal coping, and installing flexible walkways. The selected contractor must coordinate with a separate PV contractor for the removal and installation of a solar system, ensuring all penetrations are properly patched, sealed, and flashed. The project requires a 20-year manufacturer QA warranty and a 2-year contractor installation warranty, with mandatory manufacturer inspections scheduled for years 2, 5, 10, and 15. The contract will be awarded to the lowest responsible bidder who is licensed and registered with the DIR. Bidders must provide a bid security of at least 10 percent of the total bid and, upon award, provide performance and payment bonds equal to the contract price. As a public work under Labor Code Section 1720, the project mandates the payment of prevailing wages. Payment is processed monthly via progress estimates submitted to the City Engineer, with a 5 percent retention withheld from each payment. The contractor is responsible for strict material handling and storage according to manufacturer specifications to prevent deterioration and theft. Final acceptance of the work is conducted by the City Council following a thorough site cleanup and verification by the City Engineer.
City of Highland

POSTED

about 6 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The contract involves a comprehensive roof replacement for the Cheyenne Fire Station 1, requiring the complete removal of the existing roofing system down to the concrete deck. The project includes cleaning and salvaging the current roof ballast and pavers for reuse, ensuring minimal waste and preserving existing materials where possible. New roofing components will consist of installing a vapor barrier, fully adhered rigid tapered insulation, and a loose-laid 60 mil EPDM single-ply membrane, along with all necessary flashings as specified in the contract documents. Additionally, modifications to the existing parapet walls, curbing, and flashings are required to increase the roofing system's depth, enhancing durability and performance. The solicitation for this project was posted on April 23, 2024, with a response deadline of May 17, 2024. It is managed by the City of Cheyenne under the Wyoming organization, with the NAICS code 238160 indicating a specialty in roofing and siding contractors. The project is overseen by TJ Barttelbort, who can be contacted via email or phone for further details. This contract represents a significant upgrade to the fire station’s roofing infrastructure, ensuring improved longevity and weather resistance.

General Info

Place of Performance

WY, USA

Set-Aside

NONE

Documents

7

Administrative Instructions for City of Cheyenne Construction Contract

PDF, High priority: read this firstadministrative-instructions
High

BID_S-18-24 Roof System Plans

PDF, High priority: read this firstplans
High

BID S-18-24 Specifications for City of Cheyenne Fire Station No.1 Re-Roof

PDF, High priority: read this firstspecifications
High

Cheyenne Fire Station 1 Roof Replacement IFB S-18-24

PDF, High priority: read this firstifb
High

City of Cheyenne Agreement and Performance Payment Bonds

PDF, High priority: read this firstcontract-document
High

City of Cheyenne General Conditions for Contracts

PDF, High priority: read this firstgeneral-conditions
High

City of Cheyenne Notice of Award and Related Forms

PDF, High priority: read this firstaward
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWyoming → City of Cheyenne
Contacts1 person available
OfficeN/A
Organization / AgencyWyoming → City of Cheyenne
Office AddressN/A

Full Description

Show more
Includes the removal of existing roof system in its entirety to concrete deck. Roof ballast and existing pavers are to be cleaned and salvaged for reinstallation.Includes the installation of vapor barrier, fully adhered rigid tapered insulation, loose laid 60 mil EPDM single-ply membrane including all necessary flashings as indicated within the contract documents. Also includes the modification of existing parapet walls, curbing, and flashings to increase the depth of the roofing system.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS