Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Award Notification - Cheyenne Mountain SFS Upgrade EST-3 Fire Alarm System to EST-4

Awarded
FA251726A007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 21st Civil Engineering Squadron has awarded Control Systems Inc. a contract valued at $1,063,290.00 to upgrade the existing EST-3 Fire Alarm Systems to EST-4 Fire Alarm Control Panels at Cheyenne Mountain Space Force Station in Colorado. The project involves replacing 23 legacy control panels while reusing existing wiring and field devices, ensuring system redundancy and minimal disruption to operations. Performance is to be completed within 180 calendar days after award, with all work performed on-site at the installation. The award was made under the Lowest Price Technically Acceptable (LPTA) evaluation method, with technical and past performance factors assessed on a pass/fail basis. Technical acceptability requires NICET Level II certification in Fire Alarm Systems, Edwards FireWorks System manufacturer certification, and a valid Colorado state license, along with a detailed 180-day project schedule. Past performance is evaluated through SPRS, DCAA, and DCMA records, with no trade-offs permitted between cost and non-cost factors. The contract mandates strict compliance with NFPA 72, OSHA standards, Air Force safety directives, and cybersecurity and OPSEC requirements outlined in supporting attachments. All equipment and materials must be marked according to MIL-STD-130 and MIL-STD-129, including unique item identifiers encoded via Data Matrix ECC200 or other approved formats, and registered in the DoD IUID Registry. Packaging and labeling must be machine-readable, and contractors must verify compliance using Automatic Identification Technology. Invoicing is mandatory through the Wide Area WorkFlow system, with payments processed via DoDAAC F87700. Inspection and final acceptance are conducted by the 21st Civil Engineer Squadron and the local Authority Having Jurisdiction at the installation. The contractor is responsible for site restoration, providing full operations and maintenance documentation, and a one-year warranty covering all materials and workmanship. Multiple federal compliance clauses are incorporated, including restrictions on subcontractor sales, prohibitions on procurement from the Xinjiang Uyghur Autonomous Region and the Maduro regime, requirements for executive compensation reporting, and security protocols governing personnel access and data handling. No set-aside provisions apply, and no socioeconomic status certifications or key personnel requirements are specified beyond the baseline technical certifications.

General Info

Upgrade of EST-3 to EST-4 fire alarm system at Cheyenne Mountain SFS, submissions due May 8, 2026.

Contract Value

$1,063,290

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

Colorado Springs, CO, USA

Set-Aside

NONE

Award Issued Date

Documents

30

Cheyenne Mountain AFS North Tunnel Node 19 Fire Alarm System Plan

PDF, High priority: read this firstspecifications
High

Cheyenne Mountain Fire Panels EST-4 Upgrade RFI Answers

XLSX, High priority: read this first12 pages · q-and-a
High

CMAFS B315 N22 Phase 6 Shop Drawings

PDF, High priority: read this firstspecifications
High

CMAFS Bldg 12108 & Chamber 12502 - Final As-Builts

PDF, High priority: read this firstspecifications
High

CMAFS Bldg 309 Fire Alarm System As-Builts

PDF, High priority: read this firstspecifications
High

CMAFS Building 1000 Node 1 Final As-Builts

PDF, High priority: read this firstspecifications
High

CMAFS Building 3000 Node 3 - Fire Alarm System Final As-Builts

PDF, High priority: read this firstspecifications
High

CMAFS Building 9000 Node 9 - Fire Alarm System As-Builts

PDF, High priority: read this firstspecifications
High

FA251726QA007 - Amendment 1: Cheyenne Mountain SFS Upgrade

PDF, High priority: read this first25 pages · amendment
High

FA251726QA007 - Amendment 2: Cheyenne Mountain SFS Fire Alarm System Upgrade

PDF, High priority: read this first25 pages · amendment
High

FA251726QA007 Amendment 3 - Cheyenne Mountain SFS Upgrade

PDF, High priority: read this first25 pages · amendment
High

FA251726QA007 - Cheyenne Mountain SFS Fire Alarm System Upgrade

PDF, High priority: read this first25 pages · rfq
High

FA251726QA007 - Preliminary Project Schedule

XLSX, High priority: read this first1 page · specifications
High

Fire Panel Specifications

XLSX, High priority: read this first3 pages · specifications
High

SAXC 14-1006 Bldg 10000 Phase 6 Shop Drawings

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Bldg 3000 Node 3 Mass Notification Shop Drawings

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Mass Notification Bldg 6000 Node 6 Shop Drawings

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Mass Notification Bldg 9000 - Node 9 Drawings

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Mass Notification Building 2000 - Node 2 Specifications

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Mass Notification Main Tunnels - Node 19 Drawings

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Mass Notification Upgrade - Bldg 100 & 106

PDF, High priority: read this firstspecifications
High

SAXC 14-1006 Mass Notification Upgrade - Shop Drawings FA

PDF, High priority: read this firstspecifications
High

SOW Upgrade EST-3 Fire Alarm System to EST-4

PDF, High priority: read this first8 pages · sow
High

Attachment 3 - Past Performance Questionnaire

DOCX, Low priority3 pages · past-performance
Low

CMAFS 12104 N12 Final As-Builts

PDF, Low priorityspecifications
Low

CMAFS 12132 N14 Final As-Builts

PDF, Low priorityspecifications
Low

CMAFS 2000 N2 Final As-Builts

PDF, Low priorityspecifications
Low

CMAFS B8000 N8 Final As-Builts

PDF, Low priorityspecifications
Low

CMAFS Inter Tunnel FA As-Builts

PDF, Low priorityspecifications
Low

CMAFS+B315+AFTAC+FA+As-Builts.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Apr 3, 2026 to Apr 15, 2026. The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Apr 15, 2026 to May 6, 2026. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 6, 2026 to May 8, 2026. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2517 21 Cons Bldg 350
Contacts1 person available
OfficePETERSON SFB, CO, 80914-1117, USA
Office AddressPETERSON SFB, CO, 80914-1117, USA
Contacts

Full Description

Show more

The requriement for the 21st Civil Engineering Squadron for the upgrade of EST- 4 Fire Alarm Systems on Cheyenne Mountain Space Force Station (SFS), CO has been awarded to Control Systems Inc (CSI) for the amount of $1,063,290.00.

Similar Contracts

Same NAICS industry code

NAICS: 238290
New
SLED
Request for Qualifications - Task Order Construction Agreement - Elevator Repairs
Solicitation # 2627-03
California State University, Fresno, acting through the Board of Trustees of the California State University, is seeking Statements of Qualifications from general contractors holding a C-11 license for a three-year Task Order-Construction Agreement for Multiple Projects Master Enabling Agreement. The contract covers design, preconstruction, construction management, and construction services for a portfolio of elevator repair projects across campus, including McLane Hall, the Music Building, Valley Children’s Stadium, and the Grosse Industrial Tech Building. The total budget for all projects is not to exceed 3,000,000 dollars, with a maximum cap of 400,000 dollars per individual project. The delivery methods include Design-Build, Collaborative Design-Build, and Construction Manager at Risk, utilizing a two-phase approach where design and preconstruction task orders precede individual construction agreements based on Lump Sum or Guaranteed Maximum Price proposals. The selection process is a two-step method consisting of an initial RFQ to shortlist the four highest-scoring firms, followed by an RFP stage involving interviews and proposal scoring. To be considered responsive, respondents must be prequalified with the Trustees with a rating of at least 3,000,000 dollars one day prior to the submission deadline of November 24, 2026. Mandatory requirements include registration with the Department of Industrial Relations, adherence to prevailing wage laws, and the submission of a signed Skilled and Trained Workforce Agreement. Additionally, the contract mandates a minimum of 3 percent subcontracting to Disabled Veteran Business Enterprises. Evaluation criteria include the firm's composite safety score, CAL-OSHA history over the past five years, and experience utilizing DVBEs.
CSU, Fresno

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238290
New
SLED
Replace Elevator Jacks At Point Loma High School
Solicitation # PC27-0449-33-00-00
The San Diego Unified School District is soliciting informal bids for solicitation number PC27-0449-33-00-00 to replace failed hydraulic elevator jacks at Point Loma High School Building 800. The project has an estimated value of 55,000 dollars, which includes a 5,000 dollar lump sum allowance for billable hours and unforeseen conditions. The scope of work requires the installation of new OEM replacement jacks in accordance with specifications prepared by HKA Elevator Consulting and includes a 12-month warranty service following construction. Final acceptance is contingent upon the jack assemblies operating properly throughout full travel, remaining synchronized, and being free of leakage. Eligible bidders must possess a C-11 California State Contractors License, be prequalified with the District, and be registered with the DIR. A mandatory site visit was scheduled for October 14, 2026, with a bid submission deadline of October 22, 2026, via PlanetBids. Responsive bids must include a 10 percent bid security bond or cashier's check, a completed Non-Collusion Declaration, and a subcontractors list for any entity performing more than 0.5 percent of the total bid value. The successful contractor will be required to provide performance and payment bonds, insurance certificates for general liability, auto liability, and workers' compensation, and a Drug-Free Workplace Certification. All work must adhere to prevailing wage determination 2026-2.
SAN DIEGO UNIFIED SCHOOL DISTRICT

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS