Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
The Department of Defense is soliciting a design-build contract for the refresh of playgrounds at the Keesler Air Force Base Child Development Center and Youth Center in Biloxi, Mississippi. The scope of work includes providing all management, labor, materials, and supervision to perform 100% design services and construction for a core preschool playground, with optional bid items for infant, pretoddler, and toddler playgrounds, as well as an accessible SAC playground featuring a basketball court and outdoor storage. The project must adhere to strict safety and regulatory standards, including DAFI 34-144, UFC 4-740-14, ASTM F1487, ASTM F1292, and CPSC Publication 325, while ensuring rigorous age segregation and operational risk mitigation to protect daily nap periods.
The contract will be awarded to the lowest price technically acceptable offeror. Technical evaluations will be based on a pass/fail basis, requiring evidence of certified playground safety inspectors, professional engineering credentials, and a comprehensive site restoration plan. Performance timelines vary by line item, ranging from 45 to 120 calendar days. Final government acceptance is contingent upon a mandatory post-installation child safety and accessibility audit conducted by a non-affiliated third-party certified inspector. This solicitation is not set aside for any specific category.
General Info
Design-build contract for refreshing playgrounds at Keesler Air Force Base, Mississippi.
HighAI Summary for Attachment 3 - Existing Utilities: Technical utility maps and legends for the CDC and Youth Center sites, detailing gas, water, and gravity lines, including operational status and color-coded legends for utility identification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment E - Construction Document Drawings: This document outlines the required components and standards for Construction Document (CD) Drawings. It specifies the necessary contents for cover sheets, general sheets, civil engineering, utilities plans, landscape architecture, site layout, grading plans, and site details, including requirements for ABAAS compliance and storm water protection.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Attachment L-01 Past Performance Reference List: Attachment L-01 provides instructions and templates for the Past Performance Reference List (PPRL). It requires offerors to detail contract numbers, descriptions of work, periods of performance, and customer contact information, with specific requirements for documenting performance by subcontractors, key personnel, or teaming arrangements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for CDC Playground Refresh Technical Evaluation Factors: Finalized evaluation factors for the CDC Playground Refresh project at Keesler AFB, dated 05 November 2026. The document outlines the technical requirements for the 'Technical Approach' factor, including specific mandates for child safety, age-segregated play areas, impact surfacing, perimeter fencing, and non-toxic landscaping in accordance with DAFI 34-144 and UFC 4-740-14.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Civil Drawings Playground - As Built (Keesler AFB): As-built civil and architectural drawings for the Child Development Center at Keesler Air Force Base, Biloxi, Mississippi. Associated with Construction Contract N62467-95-C-0674. The document includes site maps, landscape plans, demolition plans, and technical abbreviations/specifications for construction and site grading.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for GFE List Musical Equipment - Rhythm Instrument: Technical specifications and installation guide for Rhythm musical instruments, revised 12/10/2021. Includes a detailed Bill of Materials (BOM) for various configurations (recycled, steel, portable) and step-by-step instructions for both in-ground and surface mount installation, including concrete requirements and accessibility clearances.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for GFE List - Playground Equipment (Bldg 6801): A Government Furnished Equipment (GFE) list for the Area5 SAC/YP Youth Center (Bldg 6801). The document specifies quantities and descriptions for a school-age structure, skyways hip shade, litter receptacles, and Pebbleflex surfacing materials including specific color blend ratios and installation areas.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Keesler AFB Child and Youth Programs (CYP) Playground SOW: Statement of Work dated October 30, 2026, for the design-build of playgrounds at Keesler Air Force Base Child Development Center (CDC) and School Age Care/Youth Programs (SAC/YP). The project includes a base bid for 100% design services and core preschool playground construction, with four optional bid items (OBIs) for infant, pretoddler, toddler, and SAC/YP playgrounds. Requirements include adherence to DAF, UFC, and CPSC safety standards, site surveys, and ABA accessibility compliance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Kessler Air Force Base Child Development Center - Rough Grading Plan: Technical drawing and rough grading plan for the Child Development Center at Kessler Air Force Base, produced by Noval Facilities Engineering Command. The document includes site layout details, square footage (3,722 SF), and architectural references for the area under construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for LSI Wood-Grain Litter and Recycling Receptacle Specifications: Technical specifications and installation instructions for Model #186584 (Litter) and #186585 (Recycling) Wood-Grain Receptacles. Includes a detailed parts list, material specifications for slats and bands, hardware requirements, and procedures for both direct bury and surface mount installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for NAF Standard and Construction Clauses: Dated 30 May 2025, this document outlines the Nonappropriated Fund (NAF) Standard Clauses. It provides critical legal definitions, establishes the legal status of the Nonappropriated Fund Instrumentality (NAFI), and details the procedures for claims, protests, appeals, and the examination of records for contractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Playground 3D Cutsheets - AFNAF School Age Design: Technical cutsheets and conceptual designs for the AFNAF School Age Design Youth Programs project provided by Landscape Structures. The document specifies a custom product manufacturing lead time of approximately 8 weeks from order acceptance.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Playground Equipment Areas: A document detailing requirements for playground equipment areas, specifying that all details must be legible.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Solicitation FA301027Q0002 - CDC Playground Refresh: Solicitation FA301027Q0002 issued on 20 Nov 2026 for the CDC Playground Refresh (Project MAHG22-5001) at Keesler AFB. The procurement includes A&E Design Services and construction for preschool and infant playgrounds under a Firm Fixed Price arrangement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specifications 18-1083 Replace Exterior Fencing w CDC Requirements: Technical specifications for the installation of industrial/commercial chain link fencing and gates. The document details requirements for polymer coated steel fabric, galvanized steel framework, swing and cantilever slide gates, and concrete footings, referencing various ASTM standards for materials and installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Storm Sewer Pipe - New Utilities Concept: Technical specifications and elevation data for a new utilities concept regarding storm sewer pipes, dated 10/15/2023. The document provides top and invert elevations for various street locations from 1st Street through 12th Street.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Submittal Procedures: This document outlines the formal procedures for contractor submittals, distinguishing between those requiring Contracting Officer (CO) approval (shop drawings) and those for information only. It details the use of Form AF 3000 (Material Approval Submittal), requirements for Buy American Act compliance certification, and specific review timelines (10-14 calendar days). It establishes that the contractor is responsible for design accuracy and that payment for materials is contingent upon obtaining required approvals.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UFC 4-740-14 Child Development Centers: Unified Facilities Criteria (UFC) document dated 28 August 2026 regarding Child Development Centers. This document provides planning, design, and construction criteria for DoD projects and supersedes FC 4-740-14N (2014) and UFC 4-740-14 (2002). Note: The provided text contains contradictory content regarding mixed martial arts that is inconsistent with the official UFC facility criteria headers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for UFGS 02 41 00 - Demolition and Deconstruction: Unified Facilities Guide Specifications (UFGS) section 02 41 00 (August 2022) covering requirements for demolition, deconstruction, dismantling, and disposal of existing building materials, equipment, and utilities for new construction or renovation work.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination MS20260050 - Mississippi: General Decision Number MS20260050 for building construction in Harrison County, Mississippi. Updated as of November 5, 2026, this document specifies prevailing wage rates and fringe benefits for various trades including electricians, plumbers, ironworkers, and general laborers, while outlining compliance with Executive Orders 13706 and 13658.
PDF
PDF, Low prioritypast-performance
LowAI Summary for Past Performance Questionnaire - Solicitation FA301027Q0002: A Past Performance Questionnaire for solicitation FA301027Q0002 regarding the Child Development Center Playground Refresh for the 81st Contracting Squadron, Keesler AFB, MS. The document provides a template for references to evaluate a contractor's performance across quality, schedule, management, and regulatory compliance using a scale from Exceptional to Unsatisfactory.
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.