Chimney Rock Road at Franklin Creek Bridge Project, 300713/ED24-067

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of San Luis Obispo Department of Public Works is undertaking the Chimney Rock Road at Franklin Creek Bridge Project to replace a temporary bridge installed in 2023 with a new permanent structure measuring 175 feet in length and 28 feet in width across Franklin Creek, located approximately 14 miles northwest of Paso Robles in San Luis Obispo County, California. The project includes associated activities such as temporary flow diversion, stream channel grading, installation of rock slope protection, removal of a temporary haul road, filling of an existing culvert, and placement of boulders within the stream to restore natural channel functions. All work is authorized under the Lake and Streambed Alteration Agreement EPIMS-SLO-54703-R4, issued by the California Department of Fish and Wildlife pursuant to Fish and Game Code Section 1602, and must comply with the Mitigated Negative Declaration and associated Mitigation Reporting or Monitoring Plan under California Code of Regulations Title 14, Section 15096. The project does not involve federal contracting mechanisms, as no FAR clauses, acquisition codes, pricing data, or standard procurement elements are present; instead, it operates under state environmental permitting authority. The lead agency is responsible for execution and compliance, while the California Department of Fish and Wildlife retains regulatory oversight, monitoring, and final acceptance authority at the project site. Key contacts include William Fox of San Luis Obispo County for project management and Jim Kitch of CDFW for environmental compliance coordination. Although the Notice of Determination was issued on September 26, 2025, with public posting on September 30, 2025, no contract value, delivery schedule, payment terms, invoicing methods, or formal acquisition type have been specified, indicating this is a forecasted or preliminary stage project driven by environmental regulatory requirements rather than a traditional procurement.

General Info

San Luis Obispo County to replace temporary bridge with 175-foot permanent structure across Franklin Creek under state environmental permit.

Agency

California → San Luis Obispo County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Chimney Rock Road, Paso Robles, CA

Set-Aside

NONE

Documents

(1)

SLO-54703 Notice of Determination for Chimney Rock Road Restoration Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Luis Obispo County
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Luis Obispo County
Office AddressN/A
Contacts
William FoxProject Manager
Jim KitchEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SLO-54703-R4), pursuant to Fish and Game Code section 1602, to the project Applicant, County of San Luis Obispo Department of Public Works. The Project includes activities related to the construction of a new 175-foot-long by 28-foot-wide permanent bridge across Franklin Creek to replace a temporary bridge that was installed during emergency work in 2023. Additional activities include temporary flow diversion, stream channel grading, placement of rock slope protection, removal of a temporary haul road, filling of a culvert, and placement of boulders in the stream.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days