Chrisman Road Resurfacing

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Chrisman Road Resurfacing project, managed by the San Joaquin County Public Works Department, focuses on repairing existing roadway infrastructure across three primary segments: Interstate 580 to Durham Ferry Road, Linne Road to Valpico Road, and from 0.5 miles south of Schulte Road to Eleventh Street. The project is designed to address significant deterioration, including longitudinal, transverse, and block cracking, as well as major alligator cracking and rutting. The scope of work includes applying Hot Mix Asphalt (HMA) Type A overlays of varying depths, repairing pavement structure failures, replenishing shoulder backing, and constructing HMA driveways. Additionally, the project involves critical bridge work on structures 29C-120 and 29C-220, including grinding bridge decks, patching unsound concrete with rapid setting concrete, applying a polyester concrete overlay, and replacing joint seal material at expansion joints. The project is categorized as a repair of existing facilities without major alterations to road configuration or the addition of travel lanes, qualifying it for a categorical exemption from certain environmental fees. Due to the industrial and agricultural nature of the surrounding land, environmental protections are in place for migratory birds and the threatened Swainson's Hawk, with a recommended pre-construction survey if work occurs between February 15th and September 1st. Administrative oversight is provided by Assistant Planner Fatima Gutierrez. The ultimate goal of the project is to enhance public safety, reduce long-term maintenance requirements, and improve overall road reliability for the community.

General Info

San Joaquin County Public Works will resurface Chrisman Road and repair two bridges.

Agency

California → San Joaquin County

Place of Performance

Eleventh Street, Linne Road, Durham Ferry Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A

Full Description

Show more
CHRISMAN ROAD RESURFACING Project Description Project Location: Chrisman Road: Interstate 580 to Durham Ferry Road; Linne Road to Valpico Road; 0.5 Miles South of Schulte Road to Eleventh Street. See attached Vicinity Map. Project Justification: Chrisman Road was constructed in 1926 with a 2-inch rock top and oiled surface over a 4-inch gravel base course. The road was resurfaced in 1984 with a 0.35-foot overlay and in 2000 with a 0.21-foot overlay from Schulte Road to Eleventh Street. The road was resurfaced in 1987 with a 0.25-foot overlay from Linne Road to Schulte Road. The road was resurfaced in 1998 with a 0.30-foot overlay and in 2016 with a Slurry Seal from Linne road to the City of Tracy limits. The road was resurfaced in 2002 with a 0.5-foot overlay from State Route 132 to Durham Ferry Road. The existing roadway has longitudinal, transverse, and block cracking. There is also major alligator cracking and rutting. Bridges 29C-220 and 29C-120 have major potholes that have been patched with Asphalt Concrete (AC). Scope of Work: The project will consist of: 1. Resurfacing roadway from Interstate 580 to Durham Ferry Road (32 feet wide) with 0.25 feet Hot Mix Asphalt (HMA) (Type A). 2. Resurfacing roadway from Linne Road to Valpico Road and 0.5 Miles South of Schulte Road to Eleventh Street (32 feet wide) with 0.17 feet HMA (Type A). 3. Repairing Pavement Structure failure areas with full depth 0.5 feet HMA (Type A). 4. Replenishing 4-foot-wide shoulder backing: 2 feet (8%) and 2 feet to conform. 5. Applying Penetration Treatment at all intersection radii plus 50 feet or to conform. 6. Adjusting utility and monument frames and covers. 7. Replacing monument boxes. 8. Adjusting existing facilities to finished grade. 9. Constructing 8 feet HMA (Type A) driveways. 10. Grinding bridge decks for 29C-120 and 29C-220 at a depth of 1/8 inch into the concrete to remove existing AC wearing surface. Removing unsound concrete on bridge decks and patching with rapid setting concrete. Placing polyester concrete overlay with methacrylate binder at a depth of 1 inch on bridge decks. 11. Removing and replacing existing joint seal material at expansion joints on bridges. Environmental Setting: In these portions of the San Joaquin County, land usage varies from industrial to agricultural. There are many large trees adjacent to the project area. Nesting and migratory birds, protected by the Migratory Bird Treaty Act, may nest within these trees. Furthermore, the Swainson’s Hawk, a raptor species of concern within the State of California and listed as threatened may nest adjacent to or within the project area. A pre-construction survey for nesting Swainson’s Hawks and other migratory birds is recommended if construction is scheduled to occur from February 15th to September 1st. Beneficiaries: The public will see increased safety and fewer hazards with this well-maintained road. Overall, there will be reduced maintenance concerns and more reliability within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is soliciting quotes from qualified asphalt paving contractors for the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This request is specifically for bidding purposes to help the prime contractor prepare their project bid. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt-related tasks necessary for project completion. Interested parties must submit their proposals by November 27, 2026. Submissions should include company contact information, itemized pricing for the asphalt work, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all contractors are encouraged to apply, there is a strong emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included.
D.R. Phillips, LLC

POSTED

about 7 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS