Church Street/Gurries Drive Water Pipeline Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Church Street/Gurries Drive Water Pipeline Replacement project is a forecast infrastructure effort led by the City of Gilroy, California, focused on replacing aging water pipelines within public rights-of-way. The scope of work includes the installation of approximately 1,990 feet of 10-inch ductile iron pipeline on Church Street between Welburn Avenue and First Street, and 410 feet of 8-inch ductile iron pipeline on Gurries Drive between Hanna Street and Church Street, both utilizing open trench methods. Additionally, the project requires the installation of 60 feet of steel pipeline attached to the south side of the Church Street bridge across Miller Slough and the replacement of two water hydrants to meet current codes. All existing pipelines being replaced will be abandoned in place. Administratively, the project is managed by Utilities Director Heath McMahon and is currently in the environmental compliance phase, with filings submitted under the California Environmental Quality Act (CEQA). Documentation indicates the project is categorized under categorical exemptions, with official filings and fee payments processed through the Santa Clara County Clerk-Recorder’s Office and the Office of Planning and Research. The project is identified under NAICS code 237110, and while it is listed as a forecast, specific contract values, evaluation factors, and federal acquisition clauses are not applicable as it is a local public agency initiative.

General Info

Gilroy replaces aging water pipelines on Church Street and Gurries Drive using open trench methods, upgrades hydrants, and operates under state environmental exemptions.

Agency

California → City of Gilroy

Place of Performance

Church Street between Welburn Ave and First St and Gurries Drive from Hanna Str to Church St, Gilroy, CA, 95020

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Gilroy
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Gilroy
Office AddressN/A
Contacts
Heath McMahonUtilities Director

Full Description

Show more
On Church Street, the existing six-inch water pipeline would be abandoned in place, and approximately 1,990 feet of 10-inch ductile iron pipeline would be installed in the public right-of-way between Welburn Avenue and First Street using open trench methods. Across Miller Slough, approximately 60 feet of new steel pipeline would be installed attached to the south side of the Church Street bridge before transitioning back underground. Two existing hydrants on Church Street at 8335 Church Street and at the southwest corner of Church Street/Gurries Drive would be replaced with new hydrants meeting current code. On Gurries Drive, the existing four-Inch water pipeline would be abandoned in place, and approximately 41 0 feet of eight-inch ductile iron pipeline would be installed in the public right-of-way between Hanna Street and Church Street using open trench methods.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the installation of 16,435 linear feet of 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the construction of a new wet well and valve vault, the installation of pumps, a generator, odor control equipment, mechanical and electrical systems, and the demolition of existing pumps and piping. The project also encompasses site improvements such as stormwater facilities, fencing, and various paving and restoration activities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with specific requirements for the submission of a Good Faith Efforts Form and Table A to meet MBE/WBE participation goals of 10.9 percent for the EPA and 10 percent for the State of North Carolina. Performance and payment bonds, as well as proof of insurance, are required. The project is managed by Willis Engineers, and the contractor will be subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner. All work must adhere to strict quality standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS