CIPP Liner Installation & Sewer Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for CIPP Liner Installation and Sewer Rehabilitation involves the preparation and installation of a Cured-in-Place Pipe liner for prime contractors working on West County Wastewater District projects. The scope of work requires the preparation of 420 linear feet of 24-inch ACP Class 5000 pipeline and the subsequent installation of the CIPP liner. To effectively manage traffic and flow, all installation activities must be performed during nighttime hours, and strict adherence to confined space safety protocols is mandatory. The project is managed under the Infrastructure and Planning agency in California and falls under NAICS code 237110. The final deliverable is 420 linear feet of fully installed and cured 24-inch CIPP liner. Interested parties should note the response deadline of November 13, 2026.

General Info

CIPP liner installation for 420 feet of 24-inch pipeline by November 13, 2026.

Documents

This scope was carved out of 26-NIIB-052.

The full solicitation package (23 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Infrastructure and Planning
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs the preparation and installation of a Cured-in-Place Pipe (CIPP) liner for prime contractors on West County Wastewater District projects. Prepares 420 LF of 24-inch ACP Class 5000 pipeline and installs CIPP liner during nighttime hours to manage flow and traffic. Requires adherence to confined space safety protocols. Delivers 420 LF of installed and cured 24-inch CIPP liner.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open-cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, a CSO regulator fit out, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional site responsibilities include clearing and grubbing of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Key operational deliverables include the maintenance of flows and bypass for all pipes and manholes during construction, as well as geotechnical instrumentation and monitoring. The project also requires specific railroad insurance. The bid schedule encompasses general base bid items, sewer base bid items, and contingent items, with primary contact for bid documents and subcontracting opportunities being John Connelly.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, generator, and odor control equipment, as well as the demolition of existing pumps and piping, installation of new gravity sewers and manholes, and various site improvements including stormwater facilities and fencing. The contract is governed by EJCDC standard general and supplementary conditions and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid security, and mandatory MWBE documentation, including a Good Faith Efforts Form and Table A. The project requires performance and payment bonds, as well as proof of insurance. Contract administration is managed by the City of Belmont with Willis Engineers serving as the representative. Payment is processed via Applications for Payment, with the Engineer reviewing submissions within 10 days and payment becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The City of Winchester is soliciting bids for the Jefferson Street Pump Station Replacement project, with a submission deadline of November 12, 2026, at 2:00 pm via the City's e-Procurement Portal. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additionally, the project requires the relocation of an existing fuel tank and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed and must adhere to VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual. WG Construction is currently seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The contract will be awarded to the lowest responsive and responsible bidder based on qualifications, compliance, and pricing. Bidders must provide a minimum of three similar project references, a detailed Quality Management Plan, and a Timeliness Tracking Plan. The project is subject to Davis-Bacon wage determinations, American Iron and Steel requirements, and strict adherence to OSHA and ADA standards. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount.
WG Construction Co., Inc.

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Infrastructure and Planning

Same awarding agency

NAICS: 237110
New
SLED
San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Solicitation # 26-NIIB-052
The West County Wastewater District is soliciting informal bids under solicitation 26-NIIB-052 for the rehabilitation of a 24-inch ACP Class 5000 pipeline on San Pablo Dam Road. Following a CCTV assessment that identified failures in the existing liner and poor overall pipeline condition, the project requires the installation of approximately 420 linear feet of 24-inch CIPP liner between manholes MHM17105 and MHM17106. To minimize impact on traffic and sewage flows, construction must be performed during nighttime hours. The project must be completed within 30 to 45 calendar days of the Notice to Proceed, with final acceptance contingent upon WCW inspection and post-work CCTV assessment. The contract will be awarded to the lowest responsible bidder who meets specific qualification requirements, including holding a valid General A, C-34, or C-42 license and maintaining registration with the Department of Industrial Relations. Bidders must submit a comprehensive package via the OpenGov portal by November 13, 2026, including a bid form, a 5 percent bid security, a statement of qualifications, a non-collusion declaration, and a CARB certification for off-road diesel-fueled fleets. Required personnel include a Project Manager, an On-Site Superintendent, and a Safety Representative. For projects exceeding 25,000 dollars, notarized payment and performance bonds are mandatory.
Water and Sewer Line and Related Structures Construction

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
SLED
Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)
Solicitation # 26-IFB-040
West County Wastewater is soliciting bids for the Secondary Sedimentation Basins Upgrades Project (IFB No. 26-IFB-040 / 24PP505) to perform short-term improvements for Basins 1 and 2 at the Water Quality and Resource Recovery Plant in Richmond, California. The scope of work includes the installation of owner-procured equipment, replacement of water systems, concrete walkway and sluice gate repairs, concrete restoration, and electrical upgrades. The engineer's estimate for the project is 5,625,000 dollars, with bids due by December 16, 2026, via the OpenGov portal. Award will be based on the lowest responsive and responsible bid. The project is governed by a strict set of milestones for completion between May 2027 and September 2028, with liquidated damages set at 5,000 dollars per day. Contractors must provide performance and payment bonds, evidence of insurance, and a one-year warranty on all materials and workmanship after final acceptance. Key requirements include compliance with CAL OSHA safety standards, the California Labor Code, and a Project Labor Stabilization Agreement. Progress payments are submitted monthly and paid within 21 days of verification by the Engineer. Bidders must be licensed by the Contractors State License Board and submit several certifications, including non-collusion and safety acknowledgments, to be considered responsive.
Water and Sewer Line and Related Structures Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS