Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Maryland was posted on July 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CIPP Liner Installation – Storm Drain & Culvert Rehabilitation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Whittier Park Playground Installation
Solicitation # PW ITB 6647-26
The City of Spokane is soliciting bids for the Whittier Park Playground Installation project, located at 3405 W. Hartson Ave. The scope of work includes a base bid for the expansion of the existing play area, featuring the installation of owner-furnished equipment, engineered wood fiber surfacing, excavation, demolition, new concrete curbing, grading, irrigation repairs, and landscape restoration. An optional alternate is available for the supply and placement of engineered wood fiber surfacing within the existing play area footprint. The project is funded by Federal CDBG funds and is subject to both Washington State prevailing wage rules under RCW 39.12 and Federal Davis-Bacon Act requirements. Bids must be submitted electronically via the City's bidding portal by 11:00 AM on December 8, 2026. The contract will be awarded to the lowest responsible bidder who meets mandatory criteria, including current contractor registration, a Washington UBI number, and appropriate insurance and tax registrations. A critical requirement for responsiveness is that the contractor must employ a Certified Playground Safety Inspector (CPSI). Once awarded, the contractor has ten days to sign the contract and provide payment and performance bonds. Work must commence within ten days of the Notice to Proceed and be substantially completed within 30 working days.
City of Spokane

POSTED

about 18 hours ago

DEADLINE

in 26 days
NAICS: 238990
New
SLED
Pool Plaster Replacement at Simsbury Farms Rec Complex
Solicitation # CP&R 2026-4
The Town of Simsbury is soliciting bids for a licensed contractor to perform pool plaster replacement and surface rehabilitation for the Main Lap Pool and Diving Pool at the Simsbury Farms Recreation Complex. The scope of work includes water-blasting surfaces, removing hollow areas, replacing grout and caulking, updating depth markers and drain grates, and applying a multi-coat scratch coat and new commercial-grade cementitious plaster finish. All work must be completed by May 10, 2027, and performed Monday through Friday, excluding state and federal holidays unless approved. The project requires adherence to the Virginia Graeme Baker Pool and Spa Safety Act, Connecticut public pool requirements, and ASTM standards, with a minimum three-year warranty on labor and workmanship. To be considered a responsible bidder, firms must demonstrate the successful completion of at least five comparable commercial or public-use pool resurfacing projects within the last seven years, including three of similar size and complexity. Sealed proposals must be submitted to the Director of Finance by 10:00 a.m. on November 30, 2026. Required documentation includes a bid form, qualifications statement, non-collusion affidavit, a ten-year project list, and a list of key personnel. The successful bidder must provide a W-9 form and maintain specific insurance coverage, including a $2,000,000 limit for single-person injury and a $1,000,000 limit for multi-person accidents. The Town of Simsbury is exempt from Federal Excise Taxes and Connecticut Sales and Use Taxes.
DAS Procurement

POSTED

about 19 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The contract requires the installation of cured-in-place pipe liners in storm drains and culverts using approved methodologies such as air inversion with steam cure or UV cure, ensuring proper structural rehabilitation of aging underground infrastructure. Work must include comprehensive site preparation, thorough cleaning of existing pipes, and a detailed structural assessment to determine liner suitability and application specifications. All installation techniques must comply with manufacturer guidelines and industry standards to guarantee long-term performance and durability of the rehabilitated systems. The project is classified under NAICS code 238990 for other miscellaneous construction specialties and is structured as a subcontract under the Maryland Department of Transportation. The work is designated for performance in Harford County, with all activities centered on local storm drain and culvert rehabilitation needs. The solicitation was posted on July 29, 2026, and the response deadline is the same date, indicating a potential administrative or procedural error in timing. Bidders must be prepared to meet state and federal regulatory requirements, coordinate with local authorities, and deliver results that ensure public safety and infrastructure longevity.

General Info

Install cured-in-place pipe liners in Harford County storm drains using approved methods per state and federal standards.

Place of Performance

Harford, MD, USA

Set-Aside

NONE

Documents

This scope was carved out of KH-3039-0000.

The full solicitation package (13 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Call 100 KH-3039-0000

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → MARYLAND-DOT
ContactsNo contacts available
OfficeN/A
Organization / AgencyMaryland → MARYLAND-DOT
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install cured-in-place pipe (CIPP) liners in storm drains and culverts using air inversion/steam cure, UV cure, or other manufacturer-approved methods, including site preparation, cleaning, and structural assessment.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS