Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Cissna Pl Road Construction

Forecast
ZD50047CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The County of Riverside Transportation Department is undertaking the construction of 420 feet of Cissna Pl, extending from Borchard Rd to the end of the road in the Community of Lakeland Village. The project involves transforming the existing 26-foot wide dirt road into a paved roadway through grading, moisture conditioning, and the application of Hot Mix Asphalt concrete. Additional scope includes the installation of pavement markings, reflectors, and signage, as well as vegetation management involving the trimming of trees and bushes or stump removal. All improvements will be situated within the existing County Right-of-Way, eliminating the need for temporary construction easements. The project is identified under Work Order ZD5-0047C and Task Code Z1530, with administrative oversight provided by David Castro and Frances Segovia. Construction must adhere to the Caltrans 2018 Standard Plans and the County of Riverside Road Standards dated March 2, 2023. From a regulatory standpoint, the project is exempt from the California Environmental Quality Act under Section 15301(c) and must comply with the Western Riverside County MSHCP. Additionally, any vegetation removal occurring between February 1 and September 1 requires a preconstruction nesting survey to ensure compliance with the Migratory Bird Treaty Act.

General Info

Riverside County to pave 420 feet of Cissna Pl with asphalt, striping, signage, and vegetation removal within existing right-of-way by 2026.

Agency

California → Riverside County

Place of Performance

Borchard RD and Cissna Pl, CA, 92530

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Riverside County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Riverside County
Office AddressN/A
Contacts

Full Description

Show more
The County of Riverside Transportation Department is proposing to construct 420 feet of Cissna Pl from Borchard Rd to the end of Cissna Pl. Cissna Pl is classified as a Local Road and is currently a dirt road approximately 26 feet in width. The proposed project will include grading and moisture conditioning the roadway width and paving with Hot Mix Asphalt (HMA) concrete. The proposed project will also include: • Asphalt Concrete Pavement • Pavement Delineation, pavement markings, and reflectors • Removal and installation of signs • Vegetation (Trees and Bushes) Trimming and/or Stump Removal The proposed project improvements will be within the existing County Right-of-Way. Therefore, temporary construction easements will not be required for the proposed improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS