This Solicitation opportunity from California was posted on September 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
City Hall & Police Department Server Room Battery Back Up and AC Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Union City is undertaking a project to upgrade the power and cooling infrastructure of its City Hall and Police Department server rooms, designated as Project No. 23-16. The primary focus is on replacing the existing uninterruptible power supply (UPS), battery backup systems, and associated power distribution components, which have reached the end of their operational lifespan. Additionally, the project involves replacing the air conditioning units for the server rooms to ensure adequate cooling and environmental control. The city aims to not only replace these aging systems but also to evaluate and potentially expand the capacity of the battery backup and cooling systems, taking into account current and future load requirements. The project emphasizes energy efficiency, redundancy, humidity control, and environmental monitoring, including temperature sensors and leak detection, to maintain optimal server room conditions. The project scope includes detailed electrical and mechanical design requirements, with specifications for power distribution, UPS capacity, redundancy, and surge protection, as well as HVAC systems utilizing CRAC/CRAH units. The solicitation, posted as RFP 23-16, invites qualified engineering firms to submit proposals by October 22, 2025, with an anticipated contract award by October 28, 2025. The contract size is estimated to range between $500,000 and $1,500,000. The selected contractor will be responsible for providing technical design, drawings, permit support, and construction assistance, ensuring the upgraded systems meet the city’s current needs and accommodate future growth. The project is managed by Saul Flores, and additional details can be accessed through the city’s bidding portal.
General Info
Place of Performance
CA, USASet-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- TRAY, BATTERYOpen now, due in 15 days
- COVER, BATTERY BOXOpen now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
