Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

City of Adairsville Water Plant Backwash Pump

Open
R2024-081State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Adairsville is soliciting bids for the purchase and installation of a 75Hp Backwash Pump at its existing Water Plant in Bartow County, Georgia, to provide facility redundancy. The scope of work includes the construction of a concrete pad with appropriate anchoring, the provision and installation of ductile iron piping, fittings, and DeZurik valves, and the addition of a check valve on the existing backwash line. Electrical requirements involve wiring the motor to the control panel using existing conduit in accordance with the 2023 National Electrical Code and NFPA 82. The project also encompasses system start-up, testing, and operator training, while SCADA system integration will be managed by the owner via a 40,000 dollar allowance. Bids must be submitted in a sealed envelope to the City Clerk by November 17, 2026, at 10:00 a.m. local time. Required submission documents include a 5 percent bid bond and a signed E-Verify affidavit. The successful contractor must provide performance and payment bonds and ensure all work meets Hydraulic Institute and ASME B16.1 standards. The project has a final completion timeline of 210 consecutive calendar days from the Notice to Proceed, which accounts for an estimated pump manufacturing period of 24 to 26 weeks.

General Info

City of Adairsville seeks bids for 75Hp Backwash Pump installation by November 17, 2026.

Documents

3
PDF, High priority: read this first6 pages · amendment
High
PDF, High priority: read this first4 pages · amendment
High
PDF, High priority: read this first2 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 3, 2026 to Nov 17, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Adairsville
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Adairsville
Office AddressN/A
Contacts

Full Description

Show more
The Project includes all material, labor, and related appurtenances for the purchase and installation of a 75Hp Backwash Pump at the existing Water Plant for use as an additional Water Plant Backwash Pump, providing redundancy at the facility. The Work also includes building a concrete pad for the pump and motor (with appropriate anchoring/dowelling to the existing concrete floor); the provision, install, and coordination of associated piping, fittings, and valves to connect to the existing Backwash System; addition of a check valve on existing backwash line; electrical wiring from the motor to the control panel (conduit pipe already in place); start up and testing of the system after installation; training for system use; all material, labor, tools, equipment, and any other miscellaneous items necessary for a complete, working, additional Backwash Pump at the Water Plant. SCADA system integration will be coordinated by Owner with their existing system integrator and paid for through the Allowance Item.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC piping ranging from 6 to 30 inches and Ductile Iron Pipe (DIP) in 18 and 24-inch diameters. Key deliverables include the construction of standard manholes up to 72 inches, doghouse manholes up to 84 inches, and 24-inch DIP sewer trenchless crossings with associated launch and receiving shafts. Additional requirements encompass a CSO regulator fit out, outfall work, and the abandonment of existing pipes and manholes. Supporting site activities include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), clearing and grubbing of 5,130 square yards of wooded areas, and subsequent seeding and fine grading. The project also requires geotechnical instrumentation and monitoring, maintenance of flows and bypass, and specific railroad insurance. Point of contact for this opportunity is John Connelly at [email hidden].
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on socioeconomic compliance through required Minority and Women-Owned Business Enterprise documentation. Bidders must provide a Good Faith Efforts Form and Table A to be considered responsive. The project is governed by EJCDC standard general and supplementary conditions, requiring both performance and payment bonds from sureties with an A.M. Best rating of A-VII or better. Performance begins upon a written Notice to Proceed, and payment is processed monthly via applications for payment submitted to the Engineer, with payments becoming due 30 days after presentation to the owner. Final acceptance is contingent upon the Engineer's determination of substantial completion and the resolution of a final punch list.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS