City of Coalinga Sanitary Sewer Collection System and Wastewater Treatment Plant Improvements

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Coalinga is undertaking the Sanitary Sewer Collection System and Wastewater Treatment Plant Improvements project to ensure adequate sewer services through the rehabilitation and replacement of deteriorated infrastructure. The scope of work includes the trenchless rehabilitation of approximately 30,815 linear feet of gravity sewer mains and the conventional replacement of approximately 19,801 linear feet of gravity sewer mains, specifically targeting sections with severe offsets, blockages, or sags exceeding 60 percent of the pipe diameter. Additionally, the project involves miscellaneous repairs and operational improvements to the wastewater treatment plant located at 30500 Jayne Avenue. The project is governed by the California Environmental Quality Act (CEQA) and CEQA-Plus requirements to secure Clean Water State Revolving Fund funding. A Mitigated Negative Declaration was adopted on September 3, 2026, concluding that the project will not have a significant effect on the environment, provided specific mitigation measures for biological and cultural resources are implemented. Estimated project costs vary by alternative, with one comprehensive estimate totaling approximately 39.2 million dollars, which includes site work, pipelines, recycled water piping, and contingency fees. Construction is expected to last approximately one year, with various phases including grading, excavation, and paving scheduled through 2027.

General Info

City of Coalinga sewer and wastewater plant improvements costing approximately 39.2 million dollars.

Place of Performance

City-wide project, Coalinga, CA, 93210

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Coalinga
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Coalinga
Office AddressN/A
Contacts
Anthony UribeUtilities Supervisor

Interested Companies (1)

Crawford & Bowen PlanningVisalia, CA

Full Description

Show more
The City proposes to rehabilitate approximately 30,815 LF of gravity sewer mains using trenchless construction methods, replace approximately 19,801 LF of gravity sewer mains via conventional construction methods, and provide miscellaneous repairs and improvements to the City’s WWTP.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include site improvements, stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide bid security, evidence of authority to sign, and M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. The successful contractor is required to furnish performance and payment bonds equal to the contract price and maintain insurance from companies with an A.M. Best rating of A-VII or better. Project administration follows EJCDC standards, with payments processed monthly via applications for payment submitted to the Engineer, and final acceptance contingent upon the Engineer's written recommendation.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with strict adherence to OSHA and ADA requirements. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, submission of a bid guarantee, and the provision of performance and payment bonds equal to 100 percent of the contract amount. Additionally, the project is subject to Davis-Bacon wage determinations and requires compliance with various federal executive orders regarding non-discrimination and the use of American Iron and Steel.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS