Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Edmonton - Invitation to Bid - Doc5654603018 - Mill and Overlay #1 - 2629

Closed
AB-2026-03506Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The contract encompasses the full scope of work required to deliver the Mill and Overlay Contract #1 in Alberta, involving the supply of all labor, materials, equipment, and services necessary to complete the construction project. This includes mobilization and demobilization, traffic and pedestrian management, site setup with temporary facilities and security measures, utility protection, excavation, milling of existing pavement, asphalt paving, curb and gutter replacement, curb ramp and concrete crossing upgrades, road crack repair, granular shoulder restoration, construction of a Shared Use Path, drainage improvements, replacement of manholes and catchbasins with frames and covers, water valve adjustments, landscaping, comprehensive site cleanup, and final inspections leading to contract closeout. The project demands meticulous coordination to maintain public safety and access throughout all phases of construction. The solicitation, identified as AB-2026-03506 issued by the City of Edmonton under the Government of Canada, was posted on May 4, 2026, with bids due by May 29, 2026. The primary point of contact for the contract is Melanie Tyson, Contracting Authority. Although listed under federal procurement systems, the project is administered locally by the City of Edmonton for work performed within Alberta. All work must comply with specified standards and timelines to ensure timely completion and successful final inspection.

General Info

Mill and overlay contract in Alberta with labor, materials, equipment, and full site work including paving, drainage, paths, and inspections.

Agency

Government of Canada → City of EdmontonView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City of Edmonton
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City of Edmonton
View Agency Profile
Office AddressN/A
Contacts
Melanie TysonContracting Authority

Full Description

Show more
This Work includes the supply of all labour, materials, equipment and services required to complete the construction of 2026 Mill and Overlay Contract #1. The Work includes, but is not limited to the following: Mobilization and demobilization Traffic and pedestrian accommodation and staging Work Site management including temporary construction facilities, security, and protection of existing Utilities Excavation Milling of existing pavement Asphalt paving Replacement of curb & gutter Replacement of curb ramps Replacement of concrete crossing Road crack repair Granular road shoulder repair Construction of Shared Use Path Drainage upgrade Replacement of manhole and catchbasin and frame & cover Water Valve adjustment Landscaping Work Site cleanup Warranty and maintenance Final inspection and Contract closeout