CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT

Active
city-greenfield-wastewater-treatment-plant-upgrade-project

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day facility located at 41901 Walnut Avenue, Greenfield, California. The project is scheduled for completion within 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and bypass piping; construction of the plant featuring a Membrane Bioreactor treatment plant, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. A critical requirement is that the existing plant must remain operational during the first two phases while maintaining continuous compliance with General Order/NOA standards. This solicitation is open to various small and disadvantaged business categories, including VOSB, SDVOSB, WOSB, and SDB. A significant local hiring mandate requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Bids are due by October 28, 2026, at 2:00 PM, following a mandatory pre-bid meeting held on October 5, 2026. Subcontractors must agree to the Overaa standard agreement, provide a 100 percent faithful performance and labor bond if requested, and utilize the Textura electronic invoicing system, with associated service fees borne by the subcontractor.

General Info

Place of Performance

CA, USA

Set-Aside

SBA

Documents

1

City of Greenfield Wastewater Treatment Plant Upgrade Project - Ad Request

DOC, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyC. Overaa & Co.
Contacts1 person available
OfficeN/A
Organization / AgencyC. Overaa & Co.
Office AddressN/A

Full Description

Show more
The City will be constructing an upgraded 2.0 million gallons per day (“MGD”) wastewater, capable of meeting these more stringent treatment requirements. The new WWTP will be located on the same site as the existing WWTP, on the northeast end of Walnut Avenue in the City. Furnishing all labor, materials, equipment and services for the new Wastewater Treatment Plant (WWTP). Duration: (915) calendar days

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes site preparation, the purchase and erection of the steel building, installation of a concrete slab, underground utilities, and a dry pipe fire suppression system. Specialized requirements include the installation of desiccant dehumidifying equipment and the provision of conduit to support a future photovoltaic solar system. The project must adhere to strict technical standards, including UFC 3-600-01 and NFPA 13 for fire protection, and is subject to a statutory cost limit of 5 million dollars. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a total completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must begin within 10 calendar days of the Notice to Proceed, with all work completed within 365 calendar days. The contract requires compliance with the Davis-Bacon Act for prevailing wages in Pierce County and mandates that lighting and fire alarm components meet Buy American Act requirements. All invoicing must be processed through Wide Area Workflow.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, standing-seam roofing, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site preparation such as clearing, rock excavation, and grading, as well as the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building. Specialized requirements include rigid inclusions, load transfer mats, intrusion detection systems, and lightning protection, along with the demolition of 18 existing magazines and two buildings. The contract covers a wide array of trades, including demolition, abatement, concrete, masonry, structural steel, roofing, electrical, plumbing, and mechanical work. Additional requirements involve paving access roads, installing primary and secondary electrical distribution systems, and implementing wetland mitigation. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari to receive the formal bid invitation and access to project documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
SLED
Addendum 3 BDC02-26/27 Blue Spring - Restroom Replacement
Solicitation # BDC02-26-27
The Florida Department of Environmental Protection, Bureau of Design and Construction, is soliciting bids for the Blue Spring Restroom Replacement project, solicitation number BDC02-26-27. This project involves the construction of a new restroom facility, including site work such as grading with slopes, installation of Bahia type sod, and tree protection. Key structural requirements include 2ftx2ft footings, specific guardrails per plan A401, and Greenheck EVH-501D wall louvers. Notably, revised plans have removed the requirement for gravity or retaining walls. The contractor is responsible for all permitting fees, site security with a minimum 6-foot fence, and the location and verification of all utility lines prior to construction. Bids must be submitted to Contracts Specialist Logan Lee-Marple no later than 3:30 PM (ET) on Tuesday, October 13, 2026, and must include a signed acknowledgment of Addendum No. 2 to avoid potential rejection. The project requires a 15% contractor-performed minimum, which can include work by LLC owners and is verified via a Schedule of Values. Additionally, the contractor must provide Builder's Risk insurance covering the total project cost, including existing DEP-owned property. Staging areas will be designated during a preconstruction meeting, and the bid posting date is scheduled for October 20, 2026.
Department of Environmental Protection

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS