This Solicitation opportunity from Washington was posted on March 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
City of Mercer Island Water Supply Pipeline: Subcontractor Bid Package 001 - 10” Watermain Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Mercer Island is undertaking a Water Supply Pipeline project to install a new 24-inch ductile-iron water transmission main extending approximately 5,000 feet. The pipeline will begin at the Boat Ramp area on East Mercer Way and follow a route north along East Mercer Way, west on SE 36th Street, southwest along SE Gallagher Hill Road, and east on SE 40th Street, ultimately connecting to the existing system near 92nd Avenue SE. The project also involves replacing about 1,500 feet of aging 8- and 10-inch asbestos-cement distribution mains on Gallagher Hill Road. A new pressure-reducing valve vault and updated system interconnections will be installed to enhance water supply reliability, manage pressure effectively, and improve fire-flow capabilities. In addition to the water infrastructure work, the project includes significant roadway, sidewalk, and streetscape improvements on SE 36th Street, Gallagher Hill Road, and SE 40th Street. These upgrades involve pavement reconstruction, installation of new ADA-compliant sidewalks and curb ramps, stormwater and utility adjustments, and refreshed pavement markings to improve safety and mobility. Overall, the combined improvements aim to create a more resilient, easily maintainable water supply system that will provide long-term service reliability and improved water quality, while also upgrading the surrounding transportation infrastructure. The subcontractor bid package 001 specifically focuses on the installation of 10-inch water mains, and bids are due by March 24, 2026. The project is managed by the City of Mercer Island’s Public Works department, with the street engineer as the primary point of contact.
General Info
Place of Performance
Set-Aside
Documents
14AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 11 days
- Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 21 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (7)
See All 7 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
More opportunities from Washington → Public Works
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
