Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

City of Mt. Shasta Water System Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Mount Shasta is implementing a comprehensive water system improvement project to replace aging infrastructure, enhance fire flows, and ensure a reliable potable water supply. The scope of work involves extensive upgrades across several key areas, including the replacement and upsizing of water mains in the Orem Street, Pine Street, and Oak Street areas, as well as the installation of new pressure regulating valve stations in subsurface concrete vaults. Additional work includes replacing water mains along Sheldon Avenue and McCloud Avenue, installing numerous fire hydrants, and replacing approximately 130 water services. Major infrastructure components include the demolition and replacement of the 505,000-gallon Tank 2, which requires lead abatement for existing paint hazards, and the replacement of the Cold Spring Supply Line. Further improvements include the installation of new 8-inch water mains on North Washington Drive and the restoration of water service on South A Street by replacing an inoperable valve and extending the water main. All work will be performed within public road rights-of-way, public utility easements, or City-owned property using open-cut trenching and trenchless techniques. The project is managed by City Manager Todd Juhasz and is classified under NAICS code 237110.

General Info

Mount Shasta is upgrading water mains, fire hydrants, and tanks for system reliability.

Agency

California → City of Mount Shasta

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Mount Shasta, CA, 96067

Set-Aside

NONE

Documents

(2)

Revised Notice of Exemption - Mt Shasta Water System Improvements

PDFspecial-notice

Revised Notice of Exemption - City of Mt. Shasta Water System Improvements

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Mount Shasta
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Mount Shasta
Office AddressN/A
Contacts
Kim FowlerPlanning Director

Full Description

Show more
The purpose of the proposed Project is to replace aging infrastructure, achieve adequate fire flows, and ensure a safe and reliable potable water supply for customers in the City’s water service area. Improvements would occur in four areas of the City: Orem Street Area: An inoperable PRV station in the N. Washington Street right-of-way (ROW) would be removed. A new PRV station would be installed in a subsurface concrete vault adjacent to North B Street. The water main within North B Street would be extended to the vault. Curb, gutter, and sidewalk may be installed between the road ROW and the PRV station. About 7,000 feet of water main would be replaced/upsized in the public road ROW. About 130 water services would be replaced and about 14 hydrants would be installed. Pine Street Area: A duplex PRV station on W. Lake Street would be abandoned in place. A new PRV station would be installed in a subsurface concrete vault adjacent to the existing PRV station. The water main within W. Lake Street would be extended to the vault. An additional PRV station would be installed in a subsurface concrete vault within the public road ROW on W. Alma Street. The water main within W. Alma Street would be extended to the vault. About 11,000 feet of water main would be replaced/upsized within the public road ROWs of several streets. About 100 water services would be replaced and about 19 hydrants would be installed. Dead-end lines would be looped by installing short segments of new water main at two locations: the intersection of W. Lake Street and Morgan Way, and on W. Castle Street southwest of N. Mt. Shasta Boulevard. Oak Street Area: About 2,000 feet of water main would be replaced/upsized in the public road ROWs of several streets. About 20 water services would be replaced; about 14 water services would be rerouted on private property; and about 3 hydrants would be installed. Sheldon Avenue Area: About 1,000 feet of water main would be replaced within a public utility easement (alleyway) between Sheldon Avenue and Old McCloud Road. McCloud Avenue Area: About 26 water services would be replaced between the existing water meters and existing 12-inch water main within the public road ROW of McCloud Avenue, between North Adams Drive and Jefferson Drive, east of Washington Drive. Cold Spring Supply Line: About 1,150 feet of existing water supply line along the existing access road east of Tank 2 would be replaced. About 1,950 feet of new water supply line would be installed within an existing access road from McCloud Avenue south to connect to the newly replaced water supply line. The remainder of the existing water supply line would be abandoned in place. Water Tank Replacement: The existing 505,000-gallon water storage tank (Tank 2) located generally east of Old McCloud Road and south of McCloud Avenue would be demolished and would be replaced in place with a new tank of the same size and capacity as the existing tank. Lead abatement would be performed to ensure elimination of lead-based paint hazards. The existing underground piping would also be replaced.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 18 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS