Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on March 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CITY OF NEWPORT, VERMONT GARDNER PARK SIPHON UPGRADE CONTRACT NO. 1

Closed
73459State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Newport, Vermont, is soliciting sealed electronic bids for the Gardner Park Siphon Upgrade, Contract No. 1, with submissions due by 1:00 PM local time on March 31, 2026. The project scope includes installing new PVC gravity sewer mains and services, constructing several sewer manholes of various sizes, and installing an 8-inch HDPE sewer siphon under the Clyde River using Horizontal Directional Drilling. Additionally, the work involves lining existing gravity sewers with cured-in-place pipe (CIPP). Bidders must submit their proposals via email to designated recipients and are encouraged to confirm receipt to avoid disqualification for late submissions. A pre-bid conference will take place on March 19, 2026, at the City of Newport Hall, and attendance is recommended but not mandatory. Bidding documents are available from Blueprints, Etc. in South Burlington during business hours, with printed sets costing $165 plus shipping or electronic sets at $100 plus shipping. Documents can also be reviewed at the City Hall or online through the engineering firm’s website. The project is partially funded through the ARPA CSO Grant managed by the Vermont Clean Water State Revolving Fund and is subject to several federal requirements including bid security, DBE participation, performance and payment bonds, compliance with the American Iron and Steel provisions, Davis-Bacon wage rates, and the Build America, Buy America Act, which mandates the use of domestic materials unless waived. All bid procedures and contract award conditions are detailed in the Instructions to Bidders included with the bidding documents.

General Info

Newport seeks sealed bids by March 31, 2026, for sewer upgrades including HDPE siphon installation.

Documents

1
DOCX, High priority: read this first2 pages · rfb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 11 days
  • Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
Contacts1 person available
OfficeVT, USA

Full Description

Show more
ADVERTISEMENT FOR BIDS CITY OF NEWPORT, VERMONT GARDNER PARK SIPHON UPGRADE CONTRACT NO. 1 General Notice The City of Newport (Owner) is requesting Bids for the construction of the following Project: Gardner Park Siphon Upgrade, Contract No. 1. Sealed bids for the construction of the Project will be received via electronic mail until Tuesday, March 31, 2026, at 1:00 pm local time. Bids shall be sent electronically to all the following email addresses: Sign up to see this detail Sign up to see this detail Sign up to see this detail Sign up to see this detail Bidders are highly encouraged to submit their bids earlier than the listed deadline to prevent issues with the submission process. Bids received electronically past the 1:00 PM deadline will be considered late and thus will not be included in the bid tabulation. Bidders are required to reach out to confirm receipt once a bid has been submitted. A bid tabulation will be released to all bidders within 5 business days. The Project includes the following Work: Installation of new 8” and 12” PVC gravity sewer main, new 4” PVC sewer service, two (2) new 5’ diameter sewer manholes, one (1) new 6’ diameter doghouse sewer manhole, new 8” HDPE sewer siphon installed via Horizontal Directional Drilling under the Clyde River, approximately 904 LF of CIPP for existing 12” AC gravity sewer and 91 LF of CIPP for an existing 8” CI gravity siphon under the Clyde River. Obtaining the Bidding Documents The Issuing Office for the Bidding Documents is: Blueprints, Etc, 20 Ferrell Street, South Burlington, VT 05403, Sign up to see this detail. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 AM and 4:30 PM and may obtain copies of the Bidding Documents from the Issuing Office as described below. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Printed copies of the Bidding Documents may be obtained from the Issuing Office at a non-refundable cost of $165 for each set, plus shipping. This purchase price includes a full set of Bidding Documents and an electronic copy of the Bidding Documents in portable document format (PDF). Alternatively, electronic only copies in portable document format (PDF) of the Bidding Documents are available for a non-refundable charge of $100 plus shipping. Bidding Documents may be purchased from the Issuing Office during the hours indicated above. Cost does not include shipping charges. Upon Issuing Office’s receipt of payment, printed Bidding Documents or electronic documents on compact disk will be sent via the prospective Bidder’s delivery service. The shipping charge amount will depend on the shipping method chosen. Bidding documents may be examined at the City of Newport Hall at 222 Main Street, 2ND Floor, Newport, Vermont 05855, Monday through Friday between the hours of 9:00 AM and 3:00 PM and on the website of Aldrich + Elliott, PC at www.aeengineers.com. Pre-bid Conference A pre-bid conference for the Project will be held at 10:00 AM local time on March 19, 2026 at the City of Newport Hall at 222 Main Street, 2ND Floor, Newport, Vermont 05855. Attendance at the pre-bid conference is encouraged but not required. Funding and Project Procurement This project is funded in part through the ARPA CSO Grant administered by the Vermont Clean Water State Revolving Fund. Consequently, the following provisions apply to this WORK (more detail for each of these provisions can be found in Instruction to Bidders): 1. Bid security in accordance with the Instruction to Bidders 2. Disadvantaged Business Enterprise (DBE) requirements 3. Performance BOND and Payment BOND each in the amount of 100% of the contract price 4. ‘American Iron and Steel (AIS) provisions of P.L. 113-76, Consolidated Appropriations Act 5. Federal Wage Rates as determined under the Davis-Bacon Act 6. This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (“IIJA”), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget’s Memorandum M-22-11, Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18,2022. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. This Advertisement is issued by: Owner: City of Newport By: Tom Bernier Title: City Public Works Director Date: March 10, 2026

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 423310
New
SLED
Supply and Delivery of Firewood to NW (Region 3) Vermont State Parks
Solicitation # 77321
The State of Vermont Department of Economic Development is soliciting bids for the supply and delivery of kiln-dried firewood to various state parks in the Northwest Region for the 2027 operating season. The contract is expected to run from April 1, 2027, to April 1, 2028, with an option to extend for two additional 12-month terms upon mutual agreement. The primary goal is to provide a reliable and affordable firewood source to deter visitors from cutting park trees or transporting invasive species, specifically targeting the prevention of the emerald ash borer. Deliveries must be made within seven calendar days of a request and placed as close to the park woodshed as possible. Special logistics are required for Burton Island State Park, necessitating coordination with a landing craft operator and the use of a 4-cord single-axle delivery truck. Firewood specifications require a moisture content not exceeding 25%, a uniform mix of 85% hardwood and 15% softwood, and a maximum length of 16 inches. Wood sourced from outside Vermont must be heat treated to a minimum core temperature of 160°F for at least 75 minutes and accompanied by a certification document. Invoicing is permitted no more frequently than once per month, with payments made on a per cord per delivery basis. The contract is subject to standard state provisions, including strict cybersecurity standards, ADA compliance, and the availability of state appropriations. There is no set-aside status for this solicitation.
Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers

POSTED

about 8 hours ago

DEADLINE

in 17 days
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS