City of Orange Wells 25 and 27 PFAS Treatment Plant Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Orange Wells 25 and 27 PFAS Treatment Plant Project, identified by project number 3010027-002C, is funded by the State Water Resources Control Board and led by the Orange County Water District. The project involves the construction of a centralized perfluoroalkyl and polyfluoroalkyl treatment plant at Well 25 to treat water from both Well 25 and Well 27. Key infrastructure components include a water conveyance pipeline and the installation of four ion exchange vessel systems in a lead-lag configuration, along with all necessary piping, prefilters, and related appurtenances. The project is located at Water Street and Champman Avenue in Orange, California. According to a Notice of Exemption dated August 12, 2026, the project is exempt from the California Environmental Quality Act under Class 3 for the new construction or conversion of small structures due to its limited impact on water quality and small scale. Primary points of contact for the project include Environmental Scientist Robyn Mendoza and Principal Planner Shawn Nevill.

General Info

Orange County Water District project constructing a PFAS treatment plant at Well 25.

Agency

California → Orange County Water District

Place of Performance

Water Street and Champman Avenue, Orange, CA, 92866

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Orange County Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Orange County Water District
Office AddressN/A
Contacts
Robyn MendozaEnvironmental Scientist
Shawn NevillPrincipal Planner

Full Description

Show more
The State Water Resources Control Board (State Water Board) is funding the Project referred to internally as City of Orange Wells 25 and 27 PFAS Treatment Plant. The components of the Project to be funded by the State Water Board include constructing a centralized perfluoroalkyl and polyfluoroalkyl treatment plant at Well 25 to treat water from Wel 25 and Well 27, a water conveyance pipeline, and installing four ion exchange vessel systems in a lead-lag configuration, including the necessary piping, prefilters and related appurtenances. PROJECT NUMBER: 3010027-002C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of mechanical and electrical systems such as pumps, a generator, and odor control equipment, along with new gravity sewers, manholes, stormwater facilities, and site grading. The project has an estimated value of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and MWBE compliance. Bidders must provide a signed bid form, bid bond, and evidence of authority to do business in the state. The agreement is based on a stipulated price and follows EJCDC standard general and supplementary conditions. Performance and payment bonds, as well as proof of insurance, are required upon contract execution. Payment is processed monthly via applications for payment submitted to the engineer, with payments becoming due 30 days after presentation to the owner. Work must adhere to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for electric motors.
Don Moorhead Construction, Inc.

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS