This Solicitation opportunity from Georgia was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
City of Port Wentworth Mobley Park Renovation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Port Wentworth, Georgia, is soliciting sealed proposals for a design-build team to execute the Mobley Park Remodel Project located on Armadale Road. The selected team, which must include a Georgia-licensed general contractor, a Georgia-registered architect, and a Georgia-licensed professional engineer, will be responsible for all architectural and engineering services, permitting, labor, and materials. The scope of work focuses on improving park accessibility, safety, and functionality, specifically through the installation of six-foot-wide ADA-compliant concrete walkways, the renovation of three baseball fields including infield reconstruction and drainage improvements, and comprehensive upgrades to restroom, announcer, and concession buildings. Building improvements include new roofing, HVAC, plumbing, electrical work, and coordinated architectural finishes. The project excludes parking lots, playgrounds, security cameras, and athletic lighting. The contract requires substantial completion within 180 calendar days of the Notice to Proceed, with final completion due within 30 days thereafter. Failure to meet the substantial completion deadline will result in liquidated damages of 500 dollars per calendar day. Proposers must submit a lump-sum fee proposal and a 5 percent bid bond, with the final contract requiring performance and payment bonds equal to 100 percent of the contract value. Evaluation is based on a 100-point scale considering team qualifications, relevant experience, and project approach. All work must adhere to the Georgia Erosion and Sedimentation Act and OSHA requirements, and the final delivery must include a minimum one-year warranty on all labor and materials.
General Info
Place of Performance
Set-Aside
Documents
6AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 27 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 12 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
The selected team shall provide all architectural and engineering services, permitting, labor, materials, equipment, supervision, testing, inspections, and related services necessary to deliver a complete, operational project. Improvements will address park accessibility, athletic field conditions, building functionality, safety, appearance, and long-term maintenance.
The scope includes replacement of existing sidewalks with six-foot-wide, ADA-compliant concrete walkways, concrete paving around existing buildings, renovation of three baseball fields, infield reconstruction, grading and drainage improvements, dugout improvements, fence replacement, irrigation improvements, and batting cage replacement.
Building improvements include renovations to the restroom, announcer, and concession buildings, roofing replacement, coordinated architectural finishes, concession equipment, HVAC improvements, and associated plumbing and electrical work. The contractor shall evaluate existing electrical infrastructure and correct deficiencies as specified in the RFP. Site restoration, staff training, warranties, and project closeout documentation are also required.
The project excludes parking lot and playground improvements, security cameras, access control, public Wi-Fi, audiovisual systems, scoreboard replacements, and athletic lighting replacements.
Proposers shall identify a team consisting of a Georgia-licensed general contractor, Georgia-registered architect, Georgia-licensed professional engineer, and other necessary consultants. Teams must demonstrate relevant parks and recreation experience, design-build experience, financial capacity, and qualifications described in the solicitation.
Substantial completion is required within 180 calendar days following the No
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
