Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

City of Ridgecrest Las Flores Avenue HAWK (State Project Number HSIPSL-5385(078))

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Ridgecrest is implementing pedestrian safety improvements at two intersections to enhance visibility and reduce vehicle-pedestrian conflicts. At the intersection of Las Flores Avenue and Sierra View Street, the project involves installing a Pedestrian Hybrid Beacon (HAWK signal), reconstructing curb ramps for accessibility, constructing a median, and performing roadway paving with asphalt rubber hot mix over a four-inch base. This location also includes the installation of traffic signal equipment, wiring, conduit, signing, and striping. At the intersection of Graaf Avenue and Alene Avenue, the project focuses on installing an overhead pedestrian warning assembly featuring a flashing pedestrian sign and rapid rectangular flashing beacons (RRFBs) along with necessary supporting hardware. All construction activities will occur within the existing public right-of-way without roadway widening or alterations to traffic patterns. The project is consistent with the Highway Safety Improvement Program (HSIP) and is categorically exempt under CEQA Class 1 for the repair and maintenance of existing streets. Funding is provided through Caltrans HSIP Cycle 12 for the Las Flores Avenue and Sierra View Street improvements, while the Graaf Avenue and Alene Avenue work is funded via local sources. The project is identified by State Project Number HSIPSL-5385(078) and is managed by the City of Ridgecrest Department of Public Works.

General Info

City of Ridgecrest is installing pedestrian safety beacons and ramps at two intersections.

Agency

California → City of Ridgecrest

Place of Performance

Las Flores Avenue and Sierra View Street, Graaf Avenue and Alene Avenue, Ridgecrest, CA, 93555

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Ridgecrest
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Ridgecrest
Office AddressN/A
Contacts
Terry RobertsDirector of Public Works
Alondra Blanco-GutierrezAssociate Planner

Full Description

Show more
The proposed project consists of pedestrian safety improvements at two existing intersections within the City of Ridgecrest, California. Improvements are intended to enhance pedestrian visibility and safety and reduce the potential for pedestrian-vehicle conflicts. At the intersection of Las Flores Avenue and Sierra View Street, the project includes installation of a Pedestrian Hybrid Beacon (PHB/HAWK signal). The intersection is directly adjacent to Las Flores Elementary School and several residences. Construction activities would occur within the existing public right-of-way and include minor roadway paving, curb ramp reconstruction to improve accessibility, median construction, installation of traffic signal equipment, associated wiring and conduit, and roadway signing and striping. Existing asphalt pavement would be removed and re-compacted with asphalt rubber hot mix over approximately four inches of asphalt base. No roadway widening is proposed. Construction limits at this intersection extend approximately 200 feet along each approach of Las Flores Avenue and approximately 50 feet into Sierra View Street. At the intersection of Graaf Avenue and Alene Avenue, the project includes installation of an overhead pedestrian warning assembly, consisting of a flashing pedestrian sign and rapid rectangular flashing beacons (RRFBs). The intersection is adjacent to a parking lot and several residences. Work would include installation of traffic signal equipment and related hardware necessary to support the overhead pedestrian warning system. All improvements would occur within the existing roadway and right-of-way. Construction limits at this intersection extend approximately 50 feet from each approach. The project would not introduce new land uses, increase roadway capacity, or alter traffic patterns beyond improving pedestrian safety. The proposed improvements are consistent with the Highway Safety Improvement Program (HSIP), which is intended to reduce fatalities and serious injuries on public roadways. The Las Flores Avenue and Sierra View Street improvements are funded through Caltrans HSIP Cycle 12, while the Graaf Avenue and Alene Avenue improvements are funded through local sources. There are no mapped hazardous waste incidents or facilities, including leaking underground storage tanks, in the project vicinity. (Calif. RWCB Geotracker, available at https://geotracker.waterboards.ca.gov/; U.S. EPA Cleanups in My Community maps, available at https://www.epa.gov/cleanups/cleanups-my-community; California Dept. of Toxic Substances Control maps, available at https://www.envirostor.dtsc.ca.gov/public/, accessed February 2026). Setting: The project intersections are located within developed areas. There is no natural habitat within or immediately adjacent to the project boundaries. Beneficiaries: Ridgecrest pedestrians will benefit from improved safety at the intersections, reducing fatalities and serious injuries on the public roads.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center in Illinois, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor must perform repairs on five storm sewer drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Bids are due by October 21, 2026, and must include a detailed cost breakout, a bid bond guarantee of 20% for bids over $25,000, and proof of a mandatory site visit. Award decisions will be based on overall best value. The project is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and compliance with prevailing wage determinations. Performance and payment bonds are required for awards exceeding $25,000 from a surety company with at least an A- rating. Final payment is contingent upon a successful final inspection, submission of a Notice of Final Completion, and a 10% retainage held until substantial completion.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS