Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

City of San Diego, Pump Station 2 Improvements and Modernization

Open
K-27-2502-DBB-3-C

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of San Diego is seeking the rehabilitation and modernization of Pump Station 2 to restore long-term operational reliability. This comprehensive project involves the replacement of eight pumps, eight cone valves, and eight actuators, alongside the rehabilitation of suction piping and the replacement of pump discharge piping. The scope further includes the replacement of six motor controllers, the installation of Variable Frequency Drives for Pumps 3 and 6, and reduced voltage soft starters for Pumps 1 and 2. Additionally, the project requires the installation and modification of the VFD room, HVAC and ventilation systems, and the replacement of instrumentation and monitoring systems, as well as structural, concrete, and wet well repairs. Managed under solicitation number K-27-2502-DBB-3-C with an estimated bid value of 125,800,000 dollars, the work will be performed in San Diego, California. The solicitation is open to various small business certifications, including SBA, VOSB, SDVOSB, WOSB, and HUBZone, with a specific emphasis on seeking DBE participation. The deadline for quotes and bid submissions is December 10, 2026, by 2:00 PM PT.

General Info

San Diego seeks rehabilitation and modernization of Pump Station 2 by December 2026.

Documents

1
PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Pacific, Inc.
Contacts1 person available
OfficeN/A
Organization / AgencyGarney Pacific, Inc.
Office AddressN/A

Full Description

Show more
Rehabilitate an existing pump station by replacing pumps, valves, piping, motor controls, VFDs, HVAC, and instrumentation systems, while performing structural, concrete, wet well, and building repairs to restore long-term operational reliability.

Similar Contracts

Same NAICS industry code

More opportunities from Garney Pacific, Inc.

Same awarding agency

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the use of FRP reinforcing systems. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass the rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, electrical and instrumentation improvements, lead abatement, and general excavation and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, with the final bid date set for November 18, 2026. Submissions must include any redlines or comments regarding the Garney Standard PO and Subcontract Forms.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility in CA
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-ca-0
The Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility project in California aims to recharge the San Jacinto groundwater basin using a blend of recycled and advanced treated water. Managed by Garney Pacific, Inc. for the Eastern Municipal Water District, the scope of work includes comprehensive civil and site work, the construction of a process building, and the installation of underground utilities and process piping. Technical requirements feature the installation of advanced membrane treatment equipment, specifically Ultrafiltration and Reverse Osmosis systems, as well as the development of brine ponds involving site preparation, lined evaporation ponds, and all necessary mechanical, electrical, instrumentation, and control systems to ensure a fully operational facility. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms, with a strong emphasis on DBE, MBE, WBE, and SBE participation. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Interested parties must provide current DBE certification from an approved entity and document Good Faith Efforts if they intend to further subcontract any portion of their scope. Bids and quotes are due by November 17, 2026, at 10:00 AM PT.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS