Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pump Supply

Open

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

CA, USA

Set-Aside

SBA

Documents

This scope was carved out of K-27-2502-DBB-3-C.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

City of San Diego, Pump Station 2 Improvements and Modernization

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGarney Pacific, Inc.
ContactsNo contacts available
OfficeN/A
Organization / AgencyGarney Pacific, Inc.
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies high-capacity pumps for prime contractors on City of San Diego municipal water/wastewater infrastructure projects. Manufactures and delivers eight replacement pumps as specified in the project requirements. Delivers eight new pumps to the site.

Similar Contracts

Same NAICS industry code

NAICS: 333913
SLED
COMPRESSOR GAS COOLER ECM-2
Solicitation # IFQ 1100 CPG1078
Solicitation IFQ 1100 CPG1078 is an Invitation For Quotation issued by the City of Austin for the procurement of a Compressor Gas Cooler ECM-2. The contract is awarded to the lowest offer that meets all minimum qualifications, with the City reserving the right to verify these qualifications through references. All quotes must be submitted on an FOB Destination basis, meaning all freight charges must be included in the item price. Deliveries must comply with federal, state, and local laws, including U.S. Department of Transportation and Environmental Protection Agency regulations for hazardous substances. Each shipment must be clearly marked with the City's name, address, contents, and the applicable contract number. The contractor is required to maintain commercial general liability insurance with a minimum of 500,000 dollars for bodily injury and property damage per occurrence. Key compliance requirements include adherence to the Americans with Disabilities Act, non-discrimination and non-retaliation policies, and the City of Austin Wage Theft Ordinance. Awarded employers must complete mandatory Wage Theft Training within 30 days of the contract award and certify that they have not been adjudicated for wage theft within the previous five years. Payment for goods and services is processed within 30 days of invoice submission to the City's authorized contact. Required submission documents include a signed Offer Sheet, a completed Price Sheet, and certifications regarding nonresident bidding and manufacturing.
City of Austin

POSTED

4 months ago

DEADLINE

N/A
View Details

More opportunities from Garney Pacific, Inc.

Same awarding agency

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, including concrete resurfacing, restoration, and the use of FRP reinforcing systems. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass the rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, electrical and instrumentation improvements, lead abatement, and general excavation and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid for reimbursement. Quotes for services and supplies are due by November 17, 2026, with the final bid date set for November 18, 2026. Submissions must include any redlines or comments regarding the Garney Standard PO and Subcontract Forms.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility in CA
Solicitation # purified-water-replenishment-san-jacinto-valley-advanced-water-purification-facility-ca-0
The Purified Water Replenishment San Jacinto Valley Advanced Water Purification Facility project in California aims to recharge the San Jacinto groundwater basin using a blend of recycled and advanced treated water. Managed by Garney Pacific, Inc. for the Eastern Municipal Water District, the scope of work includes comprehensive civil and site work, the construction of a process building, and the installation of underground utilities and process piping. Technical requirements feature the installation of advanced membrane treatment equipment, specifically Ultrafiltration and Reverse Osmosis systems, as well as the development of brine ponds involving site preparation, lined evaporation ponds, and all necessary mechanical, electrical, instrumentation, and control systems to ensure a fully operational facility. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms, with a strong emphasis on DBE, MBE, WBE, and SBE participation. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Interested parties must provide current DBE certification from an approved entity and document Good Faith Efforts if they intend to further subcontract any portion of their scope. Bids and quotes are due by November 17, 2026, at 10:00 AM PT.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS