Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

City of Sherman - Phase IV Drainage Improvements for Setting Suns

Active
6abeca276221683a23aee109State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sherman is soliciting bids for the Phase IV Drainage Improvements for Setting Suns project located in Sherman, Texas. This contract involves the construction of a closed-conduit storm drain system featuring 170 linear feet of reinforced concrete pipe, two cast-in-place wye inlets, and a pair of wingwalls at the outfall. The scope of work includes the grading and sodding of a triangular drainage channel with specific side-slopes and width requirements, as well as general demolition, traffic control, and grading to drain. Additionally, the project requires the asphalt re-paving of approximately 44 linear feet of S. Cimmaron Trail to accommodate a new road profile following the removal of an existing low-water crossing. This paving will consist of a 9-inch crushed aggregate base and a 3-inch HMAC surface course. The selected contractor is responsible for providing all necessary labor, materials, and testing. Responses to this solicitation are due by October 23, 2026.

General Info

City of Sherman bids for Phase IV drainage improvements and road repaving by 10/23/2026.

Place of Performance

Sherman, TX, 75090, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City of Sherman
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → City of Sherman
Office AddressN/A

Full Description

Show more
This project consists of all work associated with the lump sum and unit price bid of the construction of a closed-conduit storm drain system; the associated earthwork to shape a receiving channel for flow conveyed by that system; and the asphalt re-paving of approximately 44 linear feet of a portion of S. Cimmaron Trail. The storm drain system will consist of 170 linear feet of RCP; two (2) cast-in-place wye inlets; and one pair of wingwalls at the storm drain outfall. At this outfall, a triangular drainage channel with 3.5:1 side-slopes and a top width of 20 feet shall be graded and sodded. Finally, as previously mentioned, a portion of S. Cimmaron Trail will be re-paved with a 9”-thick crushed aggregate base and 3” HMAC surface course because the road profile has been altered as the low-water crossing that exists in the pre-construction condition will be replaced by the proposed storm drain system. Other items include demolition; traffic control; grading to drain; and sodding of other disturbed areas. Project shall include all necessary labor, materials, and testing in accordance with the plans and specifications.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of $16,690,000 and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts forms. Bids are due by November 12, 2026, and must be submitted using the prescribed EJCDC C-410 Bid Form. The agreement is a stipulated price contract governed by EJCDC C-700 Standard General Conditions and C-800 Supplementary Conditions. Performance and payment bonds, as well as proof of insurance, are required upon execution. The contractor will be subject to liquidated damages of $1,000 per day for failure to achieve substantial completion within the specified contract times. Payment is processed monthly via applications for payment submitted to the engineer, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS