Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Citywide Bike Lane Enhancements Project

Open
2697State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Citywide Bike Lane Enhancements Project, solicitation number 2697, is a state-funded initiative through Cycle 11 of the Highway Safety Improvements Program (HSIP) managed by the City of Concord's Community Development Engineering department. The project aims to improve the safety and accessibility of existing buffered bike lanes across the city. The estimated construction cost is 250,000 USD. The scope of work includes providing all labor, materials, and equipment necessary to complete the enhancements in accordance with the City's standard specifications and the latest editions of the Caltrans Standard Specifications and Standard Plans. Bidders must be registered with the California Department of Industrial Relations and possess the required California contractor licenses. Proposals must be submitted via the OpenGov Procurement Portal by December 17, 2026. The successful contractor must provide performance and payment bonds for 100% of the maximum contract price and adhere to prevailing wage requirements. Key technical requirements include specific packaging and labeling for preformed thermoplastic markings to prevent damage during transit. Contract administration is overseen by the City Engineer, with payment for undisputed amounts issued within 30 days of a complete payment application.

General Info

City of Concord project to enhance bike lane safety and accessibility for $250,000.

Documents

7
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstgeneral-conditions
High
PDF, High priority: read this first19 pages · ifb
High
PDF, High priority: read this first7 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first7 pages · wage-determination
High
PDF, High priority: read this first46 pages · specifications
High

Read all 7 documents

Due in 24 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 24 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 7 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Community Development - Engineering
Contacts2 people available
OfficeConcord, CA, 91451, USA

Full Description

Show more
This project is state funded through Cycle 11 of the Highway Safety Improvements Program (HSIP). Goal of the project is to improve bike lane safety and accessibility in various locations where existing buffered bike lanes were already installed.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
SLED
27-020 Windsor Parkway Sidewalk Project
Solicitation # 27-020
The Windsor Parkway Sidewalk Project (S2161) is a construction contract for the City of Sandy Springs, Georgia, focused on installing approximately 2,940 linear feet of 6-foot wide sidewalk with a 2-foot landscape strip and curb and gutter on the south side of Windsor Parkway, from Dalmer Road to 727 Windsor Parkway. The scope of work includes significant drainage upgrades, such as 1,739 linear feet of 18-inch RCP, 16 new catch basins, one reconstructed catch basin, one new drop inlet, one manhole, the extension of an existing culvert, and two parapet walls. All work must adhere to the current Georgia Department of Transportation (GDOT) Standard Specifications, the Americans with Disabilities Act (ADA), and the Manual on Uniform Traffic Control Devices (MUTCD), with materials sourced exclusively from GDOT certified suppliers. The project must commence within ten calendar days of the Notice to Proceed and be completed within 365 calendar days. The contractor is required to provide separate performance and payment bonds, each for 100% of the total contract price, and must comply with the Georgia Security and Immigration Compliance Act of 2006 and the Drug-Free Workplace Act. Payment will be made via progress payments based on the Bid Schedule, with invoices processed by the 5th day of each month. This solicitation is open to all qualified bidders as no specific set-aside status is designated.
City of Sandy Springs

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
HSIP Cycle 11- High Friction Surface Pavement
Solicitation # 33ST24PW07
The HSIP Cycle 11- High Friction Surface Pavement project, solicitation number 33ST24PW07, is managed by the City of Napa Public Works Department in California. Funded primarily by a state grant through Caltrans' Highway Safety Improvement Projects, the project aims to improve public safety for motorists, bicyclists, and pedestrians by installing high friction surface treatment (HFST) on the final 100 feet of travel lanes approaching ten high-injury intersections. These locations include five intersections on Lincoln Avenue (Soscol Ave, Main St, Jefferson St, Marin St, and California Blvd) and five on Browns Valley Road (Chelsea Ave, Laurel St, Robinson Ln, Thompson Ave, and Austin Way). The estimated construction cost for the project is $352,840. The contract will be awarded to the lowest responsible bidder, with potential consideration for a local bidder preference per Napa Municipal Code Chapter 2.93. The scope of work requires the contractor to provide a qualified full-time on-site superintendent and complete all work within 20 working days from the Notice to Proceed. Requirements include the submission of a payment bond, performance bond, and warranty bond, as well as adherence to California Labor Code prevailing wage requirements. Bidders must submit their proposals in PDF format via the OpenGov portal, including a completed Bid Form, Subcontractor List, and Non-Collusion Declaration. There is no set-aside status specified for this solicitation.
Public Works Department

POSTED

about 13 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237310
New
International
Transportation and Economic Corridors - Request for Qualification - RFQ #2026-14: BF 71315, Construction of Steel Girder Bridge over Athabasca River, Removal of Existing Bridge, Grading, GBC, ACP & Other Work
Solicitation # RFQ 2026-14
Alberta Transportation and Economic Corridors is soliciting construction services for the replacement of the BF 71315 bridge on Highway 33:08 over the Athabasca River near Fort Assiniboine, Alberta. The project utilizes a Design-Bid-Build delivery method and involves the construction of a new two-span steel girder bridge with a wildlife jump span, the demolition and disposal of an existing four-span truss bridge, and associated works including river training, grading with approximately 200,000 cubic meters of imported borrow fill, and traffic management. Performance is expected to commence in May or June 2027 and conclude by September 30, 2030. This is a qualification-based selection process where firms must achieve a minimum score of 65 percent across evaluation categories—including corporate profile, team qualifications, project experience, comprehension, schedule, and competitive advantage—to be short-listed for the subsequent Tender process. The pre-qualification list will remain valid for up to three years. Applicants must provide a valid Certificate of Recognition (COR) or a COR Equivalency Letter (COREL), as SECOR and TLC certifications are not acceptable. The project requires a performance bond for 50 percent and a labour and material payment bond for 50 percent of the tender price. Submissions must be delivered in English via the APC E-submissions platform in PDF format by December 17, 2026.
Transportation and Economic Corridors

POSTED

about 13 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → Community Development - Engineering

Same awarding agency

NAICS: 237310
New
SLED
On-Call Citywide Sidewalk Replacement Phase 5
Solicitation # PJ2341
The On-Call Citywide Sidewalk Replacement Phase 5 (Solicitation PJ2341) is a public works project managed by the City of Concord's Community Development Engineering department in California. The scope of work involves comprehensive sidewalk and curb infrastructure improvements, including mobilization, clearing and grubbing, the installation of concrete curbs, curb ramps, and sidewalks, and the pruning of tree roots. The contractor is responsible for maintaining public safety and traffic control, ensuring at least one ten-foot lane of traffic remains open via flagger control. Technical requirements include strict adherence to Caltrans Standard Specifications and Plans, ADA compliance for repair slopes, and specific material standards for detectable warning surface tiles. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Evaluation criteria for responsibility include the bidder's safety record and a history of similar public works projects completed within the last three years. Bidders must submit their proposals through the OpenGov portal, including a bid proposal form, bid security, a noncollusion declaration, and a completed bid schedule. The project is subject to prevailing wage requirements, non-discrimination clauses, and requires both performance and payment bonds. There is no specified set-aside status for this solicitation.
Highway, Street, and Bridge Construction

POSTED

4 days ago

DEADLINE

in 16 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS