Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Citywide Curb Ramp Improvements 2024 Project

Closed
40399 (Federal HUD B-26-MC-0528)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Public Works

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
CITB 2026C045
Solicitation # 2026C045
Invitation to Bid No. 2026C045 is issued by the Municipality of Anchorage for the Old Seward Highway Surface Rehabilitation project, Phase 2, spanning from International Airport Road to Tudor Road. With an estimated construction cost between 3 million and 5 million dollars, the scope of work includes asphalt pavement rehabilitation, sidewalk and curb replacement, storm drain improvements, and the treatment of contaminated soils. The project requires the contractor to provide all labor, equipment, and materials, adhering to the 2024 Municipality of Anchorage Standard Specifications and various state and national traffic and electrical codes. Key deliverables include the installation of inlaid traffic markings, flexible delineators, and the coordination of access for adjacent businesses and school bus routes. The bidding process requires the submission of sealed paper bids to the MOA Purchasing Department by 2 PM local time on November 5, 2026, as electronic submissions are not accepted. Bidders must provide a bid bond, valid state and municipal contractor licenses, and a SAM report. The contract will be awarded to the responsible bidder who submits the lowest responsive bid, with preferences available for local and veteran bidders. Awardees must comply with a Community Workforce Agreement and prevailing wage requirements. Environmental compliance is critical, as work in Campbell Creek requires a Fish Habitat Permit and is subject to inspection by the U.S. Army Corps of Engineers, while soil testing must follow specific EPA and ADEC protocols for lead contamination.
Municipality of Anchorage

POSTED

about 13 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Parking Lot E8 Repairs
Solicitation # CSULBSOQ80
The Parking Lot E8 Repairs project (Project Number PE825PK023) at California State University, Long Beach, involves the complete removal of existing four-inch asphalt pavement and the upper 18 inches of soil, including cement-treated soil. The scope of work requires the installation of new asphalt over non-expansive fill compacted to at least 95 percent relative compaction, as well as the installation of one new EV charging station and the conversion of nine EV-ready stalls to full charging capability. The owner's construction estimate for this public works project is 3,700,000 dollars, with anticipated construction occurring between April 1 and July 30, 2027. Bidders must hold a valid California contractor's license in either the C-12 or B classification and must be prequalified through the PlanetBids portal. A mandatory site walk was scheduled for November 16, 2026, and sealed bid proposals are due by 2:00 p.m. on December 16, 2026. The project is subject to prevailing wage rate laws, requiring all contractors and subcontractors to be registered with the Department of Industrial Relations. Additionally, the project will be enrolled in the CSU Builders Risk Insurance Program and potentially the Owner-Controlled Insurance Program. Award will be based on the lowest responsive and responsible bid, with specific incentives provided for Disabled Veteran Business Enterprise (DVBE) participation. While a minimum of 3 percent DVBE participation is required, incentives ranging from 1 to 3 percent are available for participation levels between 4 percent and 6 percent or more, subject to a 50,000 dollar cap when combined with Small Business Preferences and a total cumulative adjustment limit of 100,000 dollars.
Purchasing Office Department of California State University, Long Beach

POSTED

about 15 hours ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Citywide Curb Ramp Improvements 2024 Project, identified by solicitation number 40399 under federal HUD funding B-26-MC-0528, is a public infrastructure initiative led by the City of Redondo Beach’s Public Works–Engineering Department to bring existing curb ramps into full compliance with ADA accessibility standards. The project encompasses the removal and reconstruction of asphalt and Portland cement concrete pavements, installation of new ADA-compliant curb ramps, construction of cross gutters and curb and gutter systems, and necessary utility adjustments, all aligned with the 2024 editions of the Standard Specifications for Public Works Construction (Greenbook) and Caltrans specifications, as well as the City’s own Special Provisions. Work is to be performed citywide within Redondo Beach, California, with strict adherence to inspection and acceptance protocols governed by the City Engineer, whose determinations on conformity are final and binding. All materials must meet specified testing standards including CTM 231, CTM 304, and APWA STD:1115 for detectable warning surfaces, and samples must be properly labeled with origin, producer, contract details, and drawing references prior to approval. The contract will be awarded on a Lowest Price Technically Acceptable basis, selecting the bidder who meets all mandatory requirements at the lowest total bid price, with no trade-offs permitted for higher-cost alternatives. Bidders must submit proposals electronically via the OpenGov portal by 10:00 a.m. on August 27, 2026, using required forms including a bid bond, affidavits, and qualifications. Financial terms include a 5% retention until final acceptance, progress payments processed within 30–35 days of invoice submission, and strict invoicing protocols requiring detailed cost documentation for force-account work. Contractors are obligated to maintain certified payrolls for three years, comply with Davis-Bacon wage rates, and provide a one-year guarantee on all workmanship and materials. Additional special requirements include prior approval of traffic control plans, full record accessibility to HUD and the Department of Labor, liability for patent infringement, and absolute responsibility for compliance with all laws effective at the time of bidding without entitlement to price adjustments. No contract value is disclosed due to the absence of unit pricing in the bid schedule, though the scope involves approximately 1,200 curb ramps, 30,000 square feet of PCC sidewalk, 5,000 linear feet of

General Info

City of Redondo Beach to replace non-compliant curb ramps for ADA accessibility under HUD B-26-MC-0528.

Documents

4

Citywide Curb Ramp Improvements 2024 Project Plans

PDF, High priority: read this firstproject-plans
High

DBA CA20260022 Mod 4 Wage Determination Update 7-14-2026

PDF, High priority: read this firstwage-determination
High

Specifications - Citywide Curb Ramp Improvements 2024 Project 40399

PDF, High priority: read this firstspecifications
High

Followers List Vendor Contact Information

CSV, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works- Engineering
Contacts2 people available
OfficeRedondo Beach, CA, 90277, USA
Office AddressRedondo Beach, CA, 90277, USA
Contacts
Didar KhandkerAssociate Civil Engineer

Interested Companies (18)

SascoFullerton, CA
ConstructConnectCincinnati, OH
Pavement Recycling SystemsJurupa Valley, CA

See All 18 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Citywide Curb Ramp Improvements 2024 Project will upgrade existing non-compliant curb ramps to meet current accessibility requirements. Rehabilitation of these curb ramps will ensure that pedestrians and those with locomotion challenges, such as wheelchairs, can navigate the City's sidewalk corridors safely. The project scope includes removal and construction of Asphalt and PCC pavements, ADA curb ramps, cross gutters, curb and gutters, utility adjustments, and other items as shown in the plans and specifications.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS