Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Citywide Sidewalk Improvements Phase Ii

Closed
20260717030State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must be invited through the Building Connected electronic system, with the bid deadline set for November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

35 minutes ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Corona Public Works Department is seeking bids for Phase II of its Citywide Sidewalk Improvements project, identified as Bid #ST-2027-04 and NIB 27-003CA, with a response deadline of August 14, 2026. The scope requires the complete removal of approximately 347,704 square feet of existing concrete sidewalk up to six inches thick and the installation of new Portland cement concrete sidewalk in full compliance with City standards. Additional work includes clearing and grubbing, potholing, construction surveying, traffic control, implementation of Best Management Practices for erosion and sediment control, and public notification. Work must be performed quadrant-by-quadrant to minimize disruption. Alternate bid items allow for the removal of 54 trees with diameters up to 24 inches and 162 trees exceeding 25 inches in diameter, along with root pruning for those trees, though these are optional and subject to city election. The project is governed by the 2024 Greenbook Standard Specifications for Public Works Construction and must adhere to ASTM and AASHTO standards as applicable. All materials, including plastic pipe, must be clearly marked with manufacturer, nominal size, and schedule, and valve boxes must be heat-branded with designated codes. The contract follows a Lowest Price Technically Acceptable award methodology, with selection based on the lowest combined total of base and elected alternate bids from responsive and responsible bidders. Bidders must meet all technical requirements, hold valid California contractor licenses, provide proof of DIR registration, maintain required insurance coverage, and comply with the Iran Contracting Act and OSHA compliance standards. No federal FAR clauses are incorporated; instead, the contract relies on locally defined provisions and requirements. Submission must be made electronically through the PlanetBids portal by the deadline, with no physical copies accepted for the initial proposal. Final acceptance occurs on-site after inspection by the City Engineer and approval by the Public Works Director, contingent upon submission of as-built drawings, certified test reports, maintenance manuals, and completion of all contractual obligations. Payment is tied to unit prices and measured quantities, though no pricing data is provided in the bid schedule, suggesting prices are to be submitted by offerors. The performance period is limited to 300 working days from the notice to proceed, with a seven-day move-in period preceding work commencement. All work must occur within the City of Corona, and the contractor assumes full liability for defective materials or

General Info

City of Corona seeks bids for sidewalk improvements by August 14, 2026.

Documents

19

Appendix A - Standard Plans for Concrete and Sidewalk Construction

PDF, High priority: read this firstspecifications
High

Bid Bond Form - Citywide Sidewalk Improvements Phase II NIB 27-003CA

PDF, High priority: read this firstbid-bond
High

Bidder Self-Performance Verification Form - Citywide Sidewalk Improvements Phase II NIB 27-003CA

PDF, High priority: read this firstbidder-self-performance-form
High

Bid Form - Citywide Sidewalk Improvements Phase II NIB 27-003CA

PDF, High priority: read this firstbid-form
High

Bid Schedule - Citywide Sidewalk Improvements Phase II NIB 27-003CA

PDF, High priority: read this firstbid-schedule
High

Citywide Sidewalk Improvements Phase II NIB 27-003CA

PDF, High priority: read this firstnib
High

Citywide Sidewalk Improvements Phase II - Section G General Provisions

PDF, High priority: read this firstspecifications
High

Information Required of Bidders - Citywide Sidewalk Improvement Phase II NIB 27-003CA

PDF, High priority: read this firstinformation-required-of-bidders
High

NIB 27-003CA Citywide Sidewalk Improvements Phase II

PDF, High priority: read this firstnib
High

Notice Inviting Bids Citywide Sidewalk Improvements Phase II 27-003CA

PDF, High priority: read this firstnotice-inviting-bids
High

Section L - Landscaping & Irrigation Systems for Citywide Sidewalk Improvements Phase II

PDF, High priority: read this firstspecial-provisions
High

Addenda Acknowledgment - Citywide Sidewalk Improvements Phase II NIB 27-003CA

PDF, Low priorityaddenda-acknowledgment
Low

Appendix B - Location Maps

PDF, Low priorityother
Low

City of Corona Contractor-Subcontractor Registration Form

PDF, Low priorityregistration-form
Low

Designation of Subcontractors - Citywide Sidewalk Impr Phase II NIB 27-003CA

PDF, Low prioritydesignation-of-subcontractors
Low

Fleet Compliance Certification - Citywide Sidewalk Impr Phase II NIB 27-003CA

PDF, Low priorityfleet-compliance-certification
Low

Non-collusion Declaration for Citywide Sidewalk Improvement Phase II NIB 27-003CA

PDF, Low prioritynon-collusion-declaration
Low

References for Citywide Sidewalk Improvement Phase II NIB 27-003CA

PDF, Low priorityreferences
Low

Workers Compensation Certificate - Citywide Sidewalk Improvement Phase II NIB 27-003CA

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Corona, Public Works Department
Contacts4 people available
OfficeN/A
Office AddressN/A
Contacts
Carol AppeltLead Purchasing Specialist
Megan WoodallAssistant Project Manager

Full Description

Show more
Bid #ST-2027-04, NIB 27-003CA: The project consists of furnishing all labor, materials, and equipment for citywide sidewalk improvements. The work includes the removal of approximately 347,704 SF of existing PCC sidewalk (up to 6-inch thick) and the construction of new PCC sidewalk per City standards. The scope also includes clearing and grubbing, potholing, construction surveying, traffic control, implementation of Best Management Practices (BMPs), and public notification. Alternate bid items include the removal of trees (54 trees ≤ 24" diameter and 162 trees > 25" diameter) and performing root pruning. The project requires work to be completed on a quadrant-by-quadrant basis.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS