Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Civil & Structural Engineering (Utility Infrastructure)

Open
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil and Structural Engineering focuses on utility infrastructure for the Etihad Water and Electricity network expansion projects in the United Arab Emirates. The scope of work involves providing structural design for transmission towers, substation foundations, and access roads, while performing critical geotechnical analysis and reinforced concrete design. Additionally, the contractor is responsible for structural steel calculations for utility poles and towers to ensure all deliverables meet certified standards for drawings and calculations. The opportunity was posted on November 10, 2026, with a response deadline of December 1, 2026. Operating under NAICS code 541330, the project requires specialized engineering expertise to support prime contractors in delivering essential utility infrastructure. All work is to be performed within the United Arab Emirates to facilitate the expansion of the regional power and water grid.

General Info

Place of Performance

ARE

Set-Aside

NONE

Documents

This scope was carved out of 320E-2026.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Tender 320E-2026 Consultancy FWA for Transmission and Distribution Network Expansion Programme - EtihadWE

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEtihad Water & Electricity
ContactsNo contacts available
OfficeN/A
Organization / AgencyEtihad Water & Electricity
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs structural design for transmission towers, substation foundations, and access roads for prime contractors on Etihad Water & Electricity (EtihadWE) network expansion projects. Executes geotechnical analysis, reinforced concrete design, and structural steel calculations for utility poles and towers. Delivers certified structural drawings and calculations.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Safe Streets For All Comprehensive Safety Action Plan
Solicitation # 26-036-RS
The Concho Valley Council of Governments (CVCOG) is soliciting proposals for the development of a Regional Safe Streets for All (SS4A) Action Plan and a sustainable regional roadway safety program. Funded by the U.S. Department of Transportation, the project aims to align with the USDOT zero-deaths vision by conducting safety assessments, analyzing traffic patterns and crash hotspots, and engaging community stakeholders to prioritize streets and trade corridors. Key deliverables include a Regional Safety Dashboard with GIS data, a stakeholder engagement plan, priority project profiles, and a final implementation program. The project budget is estimated to be in the high-six-figure range, and the award is based on best value, with cost or price accounting for up to 20 points of the evaluation. The contract is subject to rigorous federal and state compliance standards, including 2 CFR Part 200, the Texas Grant Management Standards, and the Build America, Buy America Act. Depending on the scope, the contractor must adhere to the Davis-Bacon Act for construction exceeding 2,000 dollars and the Contract Work Hours and Safety Standards Act for procurement over 100,000 dollars. Additional requirements include compliance with the Americans with Disabilities Act, Title VI civil rights, and specific cybersecurity safeguards for critical infrastructure. Proposals must be submitted as separate Technical and Price PDF documents, with a 25-page limit for the technical volume, by the deadline of December 31, 2026.
CONCHO VALLEY COUNCIL OF GOVTS

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
North Walton Sports Complex – Geotechnical Investigation Services
Solicitation # 07-27
The Walton County Board of County Commissioners is soliciting proposals from qualified geotechnical engineering firms to provide subsurface investigations, laboratory testing, and engineering analysis for the proposed North Walton Sports Complex in DeFuniak Springs, Florida. Located at Parcel ID 25-3N-19-19070-001-9040, the project site will eventually host athletic fields, high-mast lighting, amenity buildings, and supporting infrastructure. The scope of work requires the execution of eight structural soil borings to a minimum depth of 30 feet below ground surface using hollow-stem auger or rotary wash methods. The investigation must include continuous Standard Penetration Testing per ASTM D1586 and laboratory testing to verify soil classifications according to AASHTO and Unified Soil Classification System standards. The primary deliverable is a comprehensive Geotechnical Engineering Report signed and sealed by a Professional Engineer licensed in the State of Florida. This report must provide critical data for structural foundation design, including bearing capacities, settlement estimates, lateral soil parameters for lighting poles, and estimated Seasonal High Water Table elevations. All exploration programs must comply with the Florida Department of Transportation Soils and Foundation Handbook. Interested firms must submit their responses via the OpenGov portal by November 16, 2026, ensuring that technical proposals and cost proposals are submitted as separate components. Evaluation will be based on cost, lead time, quote validity, and the provision of two professional references for similar scopes of work.
Engineering

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Etihad Water & Electricity

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS