Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Civil Engineering & Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This civil engineering and design subcontract involves providing specialized design and engineering services for stormwater culvert systems at West Virginia Division of Corrections and Rehabilitation facilities. The selected contractor is responsible for developing comprehensive project plans, drawings, and specifications, while coordinating all necessary permits with the Department of Environmental Protection and the Department of Natural Resources. Key requirements include the provision of a Professional Engineer seal on all drawings and the maintenance of professional liability insurance totaling one million dollars. Final deliverables consist of signed and sealed engineering drawings along with completed permit applications. This opportunity is categorized under NAICS code 541330 and is associated with the state of West Virginia.

General Info

Engineering subcontract for West Virginia stormwater culvert design, permitting, and sealed project plans.

Place of Performance

WV, USA

Set-Aside

NONE

Documents

This scope was carved out of ARFQ-0608-DCR270000011.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ARFQ-0608-DCR2700000011-6 | Underground Stormwater Culvert Pipe Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWest Virginia
ContactsNo contacts available
OfficeN/A
Organization / AgencyWest Virginia
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs design and engineering for stormwater culvert systems for prime contractors on West Virginia Division of Corrections and Rehabilitation facility projects. Develops project plans, drawings, and specifications; coordinates permits with DEP and DNR. Requires Professional Engineer (PE) seal on all drawings. Must maintain $1,000,000 professional liability insurance. Delivers signed/sealed engineering drawings and permit applications.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 541330
New
Federal
RWP - Advanced Navigation Simulation Environment Laboratory (ANSEL)
Solicitation # FA9101269ANSEL
The Advanced Navigation Simulation Environment Laboratory (ANSEL) project is a solicitation for the design, procurement, and delivery of a state-of-the-art simulation system to modernize Position, Navigation, and Timing (PNT) and Navigation Warfare (NAVWAR) capabilities at the Holloman AFB PNT Simulation Laboratory. Issued under 10 U.S.C. Section 4022 Other Transaction Authority (OTA), the effort focuses on establishing a rigorous verification and validation (V&V) and cyber direct-inject test capability. The system must support extreme dynamic conditions, including 6-DoF trajectory models with speeds up to Mach 20, 50g acceleration, and 200 g/s jerk, while providing phase-coherent, multi-channel RF simulation for mGNSS, alternative RF (XONA/STL), and jamming or spoofing environments. The acquisition is structured around eight milestones, with Base Milestones 1, 2, and 4 requiring Firm-Fixed Pricing and the remaining milestones utilizing Rough Order of Magnitude (ROM) estimates. Key deliverables include a fully integrated Operational Utility Prototype housed in 19-inch racks, comprehensive design documentation, and all technical data delivered with Unlimited Data Rights. Evaluation is a three-step process focusing on compliance, technical capability—specifically in RF phase calibration and signal integrity—and cost realism. Applicants must provide CMMC Level 2 self-certification and adhere to strict Controlled Unclassified Information (CUI) management protocols. Submissions are due by November 12, 2026, via SAM.gov.
FA9101 Aedc Pkp Procrmnt Branch

POSTED

about 11 hours ago

DEADLINE

in 18 days
View Details
NAICS: 541330
New
SLED
Request for Qualifications (RFQ) No. 27-001 Design & Engineering Services for Pine Street Extension
Solicitation # 27-001RFQ
The City of Ocoee, Florida, is soliciting qualifications from licensed professional engineering and design firms for the Pine Street Extension project, spanning from Palm Drive to Prosperity Farms Road. The scope of work involves the reconstruction and extension of approximately 0.5 miles of roadway, including the design of stormwater and utility modifications, water and sewer installations, pedestrian crossings, specialized intersection treatments, and street lighting in coordination with Duke Energy. The selected firm will be responsible for deliverables through the 90 percent plans submittal and subsequent response to comments, ensuring the final output is sufficient for permitting, bidding, and construction. Compliance with Florida State law, the Consultants Competitive Negotiations Act, and various local and regional land development codes is required. The selection process is governed by the Consultants Competitive Negotiations Act, where an evaluation committee will recommend the top three ranked firms to the City Commission. The City will then attempt to negotiate an agreement with the top-ranked respondent. Submissions must be uploaded via the OpenGov e-Procurement platform by 2:00 p.m. local time on December 1, 2026. Qualification packages are limited to 50 pages, excluding required forms, and must be submitted separately from the cost proposal. Required documentation includes a variety of certifications, such as non-collusion affidavits, drug-free workplace certifications, and disclosures regarding scrutinized companies and foreign countries of concern. The successful consultant must maintain comprehensive insurance coverage, including a 1,000,000 dollar combined single limit per occurrence for general liability and 1,000,000 dollars for professional liability. All policies must be issued by companies with a Best Rating of A or better and a Financial Size Category of VII or better. The City is exempt from all insurance deductibles, which remain the responsibility of the consultant. Additional requirements include adherence to Florida WaterStar landscaping and irrigation standards and the provision of a detailed project timeline identifying all key milestones.
Development Services

POSTED

about 13 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from West Virginia

Same awarding agency

NAICS: 237110
New
SLED
ARFQ-0608-DCR2700000011-6 | Underground Stormwater Culvert Pipe Project
Solicitation # ARFQ-0608-DCR270000011
The West Virginia Division of Corrections and Rehabilitation is soliciting bids for a design-build project to install underground stormwater culvert pipes at the Parkersburg Correctional Center and Jail. The scope of work involves replacing existing galvanized culvert pipes and round pre-cast concrete structures, with the contractor assuming responsibility for all engineering documentation signed by a Professional Engineer, site protection, and coordination with state agencies such as the Department of Environmental Protection and the Division of Natural Resources. The project requires the submission of as-built drawings and operations and maintenance manuals upon completion. Work is generally scheduled Monday through Friday from 8:00 am to 4:00 pm, excluding state holidays. The contract will be awarded to the lowest qualified responsible bidder based on the total lump sum bid amount. Bidders must provide a bid bond of 5 percent of the total bid, while the successful vendor must furnish performance and labor/material payment bonds each totaling 100 percent of the contract value. Payment will be made in arrears via electronic funds transfer or P-Card. Compliance requirements include a drug-free workplace affidavit, disclosure of ownership interests, and registration with the Purchasing Division. Final acceptance of the work is subject to an inspection by the Director of Engineering, Construction, and Maintenance to ensure all specifications and quality standards are met.
Water and Sewer Line and Related Structures Construction

POSTED

about 19 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS