Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Civil Engineering & Design Services

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil Engineering and Design Services supports prime contractors on projects for the BLM Upper Snake Field Office under the Department of the Interior. The selected provider will be responsible for translating Government-Furnished Statements of Work into construction-ready plans, coordinating various design disciplines, and performing constructability analyses. Key deliverables include complete design packages, construction drawings, and technical specifications specifically focused on parking expansion and bank stabilization. The opportunity is designated as a Total Small Business Set Aside under NAICS code 541330. It was posted on September 2, 2026, with a response deadline of September 14, 2026. The contract is managed through the National Operations Center.

General Info

Civil engineering subcontract for BLM parking expansion and bank stabilization, small business set-aside.

Agency

Department Of The Interior → National Operations CenterView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CO

Set-Aside

SBA

Documents

This scope was carved out of 140L0626R0011.

The full solicitation package (21 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Y--CONANT BANK STABILIZATION

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → National Operations Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Interior → National Operations Center
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs integrated design services for prime contractors on BLM Upper Snake Field Office projects. Translates Government-Furnished SOW into construction-ready plans through coordination of design disciplines and constructability analysis. Develops technical specifications for bank stabilization and parking expansion. Delivers a complete design package, construction drawings, and technical specifications.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and land surveying. Additionally, the project requires support for environmental assessments, permitting, hazardous materials surveys, and CPM scheduling. This solicitation specifically encourages participation from certified Disadvantaged Business Enterprises, including MBE, WBE, and OBE firms. Interested bidders must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of September 11, 2026. To be considered responsive, firms must hold a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, and Kiewit will reimburse the associated bond premiums. Bidders must also demonstrate the ability to maintain labor harmony, as Kiewit is signatory to several collective bargaining agreements. Plans and specifications are available for review at Kiewit's Costa Mesa, California office, and further inquiries should be directed to Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of The Interior → National Operations Center

Same awarding agency

NAICS: 238990
New
Federal
Y--SFO BUCK FIRE BAER FENCE
Solicitation # 140L3726Q0123
The Bureau of Land Management Socorro Field Office is soliciting quotations for the Buck Fire BAER Fence project in Socorro County, New Mexico. This firm fixed price, single award construction contract is a total small business set-aside under NAICS 238990. The project involves the repair and reconstruction of six miles of livestock fence in the Pelona Mountain Area damaged by the Buck Fire, consisting of two miles of complete removal and replacement and four miles of repair. The scope includes the installation of four-wire fencing, barbed wire gates, stress panels, end panels, corner panels, and water-gap drainage crossings. All work must adhere to BLM Standard Fence Specifications and Drawings, with specific material requirements for zinc-coated steel barbed and barbless wire. The contract is awarded based on the lowest price from a responsible quoter who meets all technical and solicitation requirements. Performance is expected to commence no later than February 2027 and must be completed by June 1, 2027, with an estimated duration of 90 days from the Notice to Proceed. Contractors are required to comply with Department of Labor Wage Determination NM20260012 for heavy construction in New Mexico and must use domestic construction materials. Payment will be issued as a single lump sum upon final inspection and acceptance. Bidders must provide a bid guarantee and are subject to performance and payment bonding requirements of 100 percent of the original contract price.
All Other Specialty Trade Contractors

POSTED

1 day ago

DEADLINE

in 13 days
View Details