Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Civil Engineering and Parcel Map Design

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract encompasses the development of civil engineering plans and technical submittals necessary to obtain Final Parcel Map approval for a project in Elk Grove, California. Scope of work includes designing drainage systems, access routes, and utility layouts that comply with local regulatory standards and support the subdivision of land. The deliverables are focused on meeting municipal requirements for land development approval, ensuring that all infrastructure elements are properly integrated and documented for review by public agencies. The work is classified under NAICS code 541330, indicating it falls within the specialty engineering services category, and is structured as a subcontract. The contract was posted on July 10, 2026, and the performance location is specifically tied to the City of Elk Grove, with no additional details provided regarding the contracting agency or point of contact beyond the location.

General Info

Civil engineering plans for Elk Grove parcel map approval, including drainage, access, and utilities.

Agency

California → City of Elk Grove

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Elk Grove, CA

Set-Aside

NONE

Documents

This scope was carved out of M2 Waterman RV Storage Parcel Map No.23-018 (PM24-008).

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Elk Grove
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Elk Grove
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Prepare civil engineering plans and technical submittals required for the Final Parcel Map approval, including drainage, access, and utility layout.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. This professional services contract involves the design, bidding support, and engineering services during construction for a new municipal groundwater production well to replace and abandon the existing Corydon well. The project is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and matching existing vertical turbine equipment. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction and a negotiated fee for professional services. Proposals are due by September 1, 2026, via the PlanetBids portal. Award selection is based on demonstrated competence and professional qualifications, with weighted factors including relevant experience (25 percent), project approach (25 percent), scope and schedule (20 percent), innovation (10 percent), cost (10 percent), and overall proposal quality (10 percent). The contract is set aside for various small business categories, including Disadvantaged Business Enterprises (DBE). Compliance requirements are extensive, incorporating the Build America Buy America Act for domestic content, the Iran Contracting Act for proposals over one million dollars, and various federal regulations including 2 CFR Part 200 and the Department of Treasury ASAP payment system. The project is scheduled to start on November 2, 2026. Required submittals include a Preliminary Design Report, a detailed cost proposal broken down by task, and various certifications regarding lobbying, debarment, and the use of domestic iron and steel.
Ardurra Group, Inc.

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541330
New
SLED
05A3042 - Independent Cost Estimator (ICE) and Construction Scheduler in support of CMGC Project Development and Construction Services
Solicitation # 05A3042
The California Department of Transportation (Caltrans) is soliciting Statements of Qualifications (SOQs) for solicitation 05A3042 to secure an Independent Cost Estimator (ICE) and Construction Scheduler. These Architect-Engineer (A&E) services will support CMGC Project Development and Construction Services within the state of California. The estimated contract value ranges from $501,360.00 to $814,710.00, with a 0% DBE Participation Goal. The response deadline for this solicitation is September 16, 2026. Qualified firms must submit an electronic SOQ consisting of seven required sections, including transmittal letters, SF330 forms, availability tables, communication plans, work force analysis, nondiscrimination plans, and California Civil Rights Laws Certification. Key requirements include providing DIR Web record certifications for prevailing wage compliance, DVBE certifications, and a disclosure of potential conflicts of interest. Firms with 50 or more employees must additionally provide a Work Force Analysis and a Nondiscrimination Plan. Proposed key personnel must be documented via SF330 resumes and an availability table, and firms must certify that they have not performed conflicting construction services on related projects.
California Department of Transportation

POSTED

about 12 hours ago

DEADLINE

in about 1 month
View Details