Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Civil Engineering Design Services For Pleasant Way Bridge Replacement Project

Closed
BRLO-5936(134)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The County is seeking a qualified consulting firm to provide civil engineering and environmental services for the replacement of the Pleasant Way Bridge. The project involves completely replacing the existing one-lane steel pontoon bridge, which is classified as structurally deficient and requires urgent replacement to meet current safety and design standards. The new structure will be a two-lane concrete bridge with approaches that conform to modern standards, ensuring improved safety and durability. Funding for the project will be partially provided through the Federal Highway Administration, in collaboration with Caltrans and the County, and the services rendered must adhere to all relevant federal, state, and local regulations, including Caltrans' Local Assistance Procedures Manual. The contract, titled "Civil Engineering Design Services For Pleasant Way Bridge Replacement Project," was posted on June 27, 2025, with a response deadline of July 31, 2025. It is a solicitation under NAICS code 237990, with a project size estimated between one and five million dollars. The project is managed by Santa Cruz Public Works / Roads, California, and the primary point of contact is Greg Jones, reachable via email or phone. The contract aims to deliver comprehensive design and environmental services to facilitate the successful replacement of the bridge, ensuring compliance with all applicable standards and funding requirements. Interested firms can find additional details and submit proposals through the specified procurement portal.

Documents

7

Caltrans D5 Local Assistance Section 106 Compliance for Native American Consultation

PDF, High priority: read this firstcompliance-guidance
High

Caltrans Preliminary Environmental Study BRLO-5936(134)

PDF, High priority: read this firstpes
High

Contract No. 25XXXX Architecture and Engineering (A&E) Agreement

PDF, High priority: read this firstcontract-document
High

Exhibit 10-I: Notice to Proposers DBE Information

PDF, High priority: read this firstspecial-notice
High

Exhibit 10-O1 and 10-O2 Consultant DBE Commitment Forms

PDF, High priority: read this firstcontract-document
High

Pleasant Way Bridge 36C-0070 Inspection Report April 2023

PDF, High priority: read this firstbridge-inspection-report
High

RFP for Pleasant Way Bridge Replacement Project Design Services

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Cruz Public Works / Roads
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The County is seeking a qualified Consulting firm to provide civil engineering and environmental services for thePleasant Way Bridge Replacement Project.The project will consist of completely replacing the existing structure and roadway approaches with a new 2 laneconcrete bridge and bridge approaches meeting current design standards. The existing bridge is a one lane singlespan army steel pontoon sections (2 by 10, repurposed as elevated superstructure units) with a reinforcedconcrete deck and timber sidewalks on reinforced concrete seat type abutments with monolithic wingwalls,founded on spread footings.The Pleasant Way bridge needs to be replaced because it is rated as Structurally Deficient Status per the bridgeinspection report for a “Fracture Critical Inspection”.The bridge is listed in the Highway Bridge Program (HBP) and will be funded in part through the Federal HighwayAdministration (FHWA) in cooperation with the California Department of Transportation (Caltrans) and the County.Consulting firm services must comply with the latest requirements of the Caltrans Local Assistance ProceduresManual (LAPM), Federal, State, and local regulations. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS