Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Civil Site Work & Utility Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Civil Site Work and Utility Repair involves providing specialized excavation and utility repair services for prime contractors on SFO utility projects. The scope of work includes the replacement of 4-inch ductile iron cleanouts, the installation of geotextiles, and subgrade preparation conducted in accordance with FAA Item P-152. Additionally, the contractor is responsible for pouring cast-in-place concrete for equipment pads and foundations, as well as performing asphalt paving to deliver finished site surfaces. Managed by the California Design and Construction Utility Engineering agency under NAICS code 238110, the opportunity was posted on November 2, 2026. Interested parties must submit their responses by the deadline of November 30, 2026.

General Info

Subcontract for SFO civil site work, utility repair, and paving by November 30, 2026.

Documents

This scope was carved out of 11822.61.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

South Field Industrial Waste System Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Design and Construction - Utility Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation and utility repair for prime contractors on SFO utility projects. Replaces 4-inch ductile iron cleanouts, performs subgrade preparation per FAA Item P-152, and installs geotextiles. Pours cast-in-place concrete for foundations and equipment pads and performs asphalt paving. Delivers replaced cleanouts and finished site surfaces.

Similar Contracts

Same NAICS industry code

More opportunities from California → Design and Construction - Utility Engineering

Same awarding agency

NAICS: 237110
New
SLED
South Field Industrial Waste System Improvements
Solicitation # 11822.61
The South Field Industrial Waste System Improvements project, contract number 11822.61, is a design-bid-build solicitation by the City and County of San Francisco for work at the San Francisco International Airport. The scope of work includes the installation of Cure-In-Place-Pipe along South McDonnell Road and between inbound and outbound roads, the replacement of submersible pumps at one pump station, and the upgrading of SCADA panels at two pump station locations to improve remote monitoring and control via the SCADA Wonderware/Aveva system. The contract is awarded to the responsible bidder with the lowest total bid price. A California Class C contractor license is required at the time of bid, and the project includes a Local Business Enterprise subcontracting requirement. The total contract duration is 365 consecutive calendar days following the Notice to Proceed, with substantial completion required within 280 days. Bids must be submitted via the airport's e-Procurement portal in PDF format and original bid forms and security must be postmarked by November 30, 2026. Key requirements include the provision of performance and payment bonds equal to 100 percent of the contract sum for awards exceeding 25,000 dollars, compliance with California Department of Industrial Relations prevailing wage rates, and adherence to the Citybuild/First Source Referral Program. Technical standards include ISA/IEC-62443 and NIST SP-800-53 for cybersecurity, and ADA standards for accessible design. Acceptance of the work involves a 45-day period following the Notice of Completion, after which the warranty period begins.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS